Loading…
Loading…
Tender Value
₹37.7 L
EMD Value
₹75,476
Closing Date
8 Jun 2026, 3:00 pm3d left
Executive Engineer
Executive Engineer (PRI) South Andaman Division-I No. J/4, Old Councilor Bungalow, Junglighat, Sri Vijaya Puram, South Andaman
Construction of Open Public Hall at Krishna Nagar-02 under Gram Panchayat Shyam Nagar Swaraj Dweep.
2026_RDPRI_23179_1
EE/PRI/SAD-I/GEN/26-27/48
Open Tender
Civil Works - Buildings
365 days
Shyam Nagar, Swaraj Dweep
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
Executive Engineer, GPPS
₹75,476
29 May 2026
29 May 2026
8 Jun 2026
30 May 2026
8 Jun 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 1.01 | All kinds of soil. | 1 | cum | - | - |
| 2Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : | |||||
| 2.01 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 2.02 | 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources). | - | cum | - | - |
| 3Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level : | |||||
| 3.01 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 4Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | |||||
| 4.01 | 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 1 | cum | - | - |
| 5Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
Document.pdf
Tender Documents • 1.95 MB
BOQ_24574.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid