| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAccepted-AOC DOOR NO 90 C1 AYYAMPERUMAL ST VIRUDHUNAGAR TOWN | ₹2.1 Cr | L1 | Accepted-AOC after negotiation L1 bidder accepted by TAC |
| 2 | L2₹2.2 CrRejected-Finance | ₹2.2 Cr | L2 | Rejected-Finance After accepting L1 Bidder L2 bidder will be rejected |
| Sl No | Description | Qty | Unit | S.MUNIASAMY L2 | M.KARTHIKEYAN L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. Data worked out for 48 m3 per day/8 hrs | 326 | Cum | 384 ₹1,25,184 | 377 ₹1,22,902 Lowest |
| 1.01 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 72 | Cum | 272 ₹19,584 | 267 ₹19,224 Lowest |
| 2.00 | HGS SS.20.B. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B | 45 | Cum | 190 ₹8,550 | 86 ₹3,870 Lowest |
| 3.00 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 126.5 | Cum | 2,519 ₹3,18,653.5 | 2,471 ₹3,12,581.5 Lowest |
| 4.00 | Supplying and filling in foundation, basement, etc with filling gravel in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 395 | Cum | 1,152 ₹4,55,040 | 1,130 ₹4,46,350 Lowest |
| 5.00 | Cement Concrete 1:5:10 (One Cement, Five M.sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 63.1 | Cum | 6,643 ₹4,19,173.3 | 6,517 ₹4,11,222.7 Lowest |
| 6.00 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by mechanical means | 66.5 | Cum | 6,643 ₹4,41,759.5 | 6,517 ₹4,33,380.5 Lowest |
| 7.00 | Plain Cement Concrete 1:2:4 (one cement, two M.sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc. | 14.9 | Cum | 8,185 ₹1,21,956.5 | 8,029 ₹1,19,632.1 Lowest |
| 8.00 | Brick work in following Cement Mortar using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge. | 13 | Cum | 8,185 ₹1,06,405 | 8,029 ₹1,04,377 Lowest |
| 9.00Brick work in following Cement Mortar using 1:5 best quality Fly ash Brick of size 230x110x70mm with class designation of 10 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
Tender Value
₹2.1 Cr
EMD Value
₹2.5 L
Closing Date
5 Feb 2026, 5:45 pmClosed
Executive Engineer
Tamil Nadu State Agricultural Marketing Board, CIPET Road, Thiru.Vi.Ka industrial estate, Guindy, Chennai-32
Construction of Integrated Agricultural Extension Center (IAEC) at Kadaladi in Ramanathapuram District.
2026_TAMBC_650773_1
TNSAMB-2025-52-06
Open Tender
Civil Works
Lump-sum
270 days
at Kadaladi in Ramanathapuram District.
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹2.5 L
2 Jul 2026
3 Feb 2026
6 Feb 2026
3 Feb 2026
5 Feb 2026
3 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. Data worked out for 48 m3 per day/8 hrs | 326 | Cum | 366.82 | ₹1,19,583.32 |
| 1.01 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 72 | Cum | 259.34 | ₹18,672.48 |
| 2 | HGS SS.20.B. Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS.20B | 45 | Cum | 131.89 | ₹5,935.05 |
| 3 | Supplying and filling in foundation, basement, etc with filling M.Sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 126.5 | Cum | 2,399.81 | ₹3,03,575.96 |
| 4 | Supplying and filling in foundation, basement, etc with filling gravel in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 395 | Cum | 1,097.16 | ₹4,33,378.2 |
| 5 | Cement Concrete 1:5:10 (One Cement, Five M.sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 63.1 | Cum | 6,327.75 | ₹3,99,281.03 |
| 6 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by mechanical means | 66.5 | Cum | 6,327.75 | ₹4,20,795.38 |
| 7 | Plain Cement Concrete 1:2:4 (one cement, two M.sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc. | 14.9 | Cum | 7,795.38 | ₹1,16,151.16 |
| 8 | Brick work in following Cement Mortar using best quality Fly ash Brick of size 230x110x70mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge. | 13 | Cum | 7,975.5 | ₹1,03,681.5 |
| 9Brick work in following Cement Mortar using 1:5 best quality Fly ash Brick of size 230x110x70mm with class designation of 10 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
Tendernotice_2.pdf
PDF • 3.64 MB
BOQ_780304.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].