Tender Value
₹21 L
EMD Value
₹21,000
Closing Date
12 Oct 2023, 12:00 pmClosed
SE EDC-II RAEBARELI
SE EDC-II GORA BAZAR RAEBARELI
INCREASING CAPACITY OF DISTRIBUTION TRANSFORMERS
2023_MVVNL_847068_1
TENDER NO. 85/EDCR-II/2023-24
Open Tender
Electrical Works
Item Wise
30 days
EEEDD DALMAU RAEBARELI
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
A/C NO-081205500344,IFSC-ICIC0000812
₹21,000
Yes
17 Oct 2023
6 Oct 2023
12 Oct 2023
6 Oct 2023
12 Oct 2023
6 Oct 2023
Amount
Safe loading & carriage including Loading-unloading & proper stacking at a Place of work site of following store materials from ESC Tripula to site of work.
25 KVA T/F
250 KVAT/F
PCC Pole 8.5 Mtr.
Disc Insulator with Fitting
Earthing Set Complete
Stay Set Complete
ASCR Weasal Conductor
3 Phase 95sqmm AB cable
Pin Insulator with fitting
3 Phase 95sqmm AB cable
T/F Bae Channel
11 KV Cross Arm
Labor & Erection Charges:-
Digging of pits of PCC Pole 8.5 Mtr. Long from dump site to pit site then errection of PCC poles with fitting of all related accessories as per RESPO Norms.
Grouting of PCC poles 8.5 Mtr. along with grouting materials as per RESPO Norms.
Work for Dismantling of 10 KVA T/F, 16 KVA T/F on Pole with all accessories.
Work for Dismantling of 63 KVA T/F on Pole with all accessories.
Work for Dismantling of 100 KVA on D/Pole with all accessories.
Errection/Re-errection of double pole by.PCC Pole, then grouting of Pole with grouting materials including fitting of all accessories items, as per RESPO Norms for increasing capacity from 10 KVA to 25 KVA and 16 KVA to 25 KVA at the Village Pure wali, Saidanpur, Pure Thakurain, Ganj Baderwa, Rasool pur, Pure Diktan ka purwa, Pure Shuklan, Kanaha, Pure Gautaman, Terukha, Pure Kalu, Pure Hulasi, Pure Bhola, Adilabad, Sitarampur, Raunci, Domapur, Lodipur Utrawan, Katghar, Pure Baba, Katghar, Aludipur, Pure Bangali, Manheru , Devanna Bajar, Pure Lodhan, Pure Kothaiya, Raipur, Maliyapur Gaon, Semauri, Dihwa, Nagarumau, Pure Lalta, Pure sekhan, Balbhadrapur, Pure Koili, Saraiudilawar, Bheemganj, Pure Baba, Pure Thakurain, Ganj Baderwa, Pure Mahant, Kodarhar, Pure Loharan, Laxman Ganj, Pure Gutuman, Bakhtawarpur, Pure Bake Singh, Sobhwapur, Pure Tula, Rampur, Diktan ka purwa, Kuliyapur, Hardasipur, Pure Jaiki, Pure Naya.and installation new T/F 25 KVA Katghar Naher, Machhiyanari, Khagipur Sadawa, Govind Singh Ka purwa, Tarapur, Rampur, Newadapatti, Pure Jaicky. under Executive Engineer, Electricity Distribution Division-Dalmau, Raebareli.
Mounting of 25 KVA Transformer of double pole for new 25 KVA T/F and increasing capacity from 10 KVA to 25 and 16 KVA to 25 KVA and 63 KVA to 100 KVA at the Village Pure wali, Saidanpur, Pure Thakurain, Ganj Baderwa, Rasool pur, Pure Diktan ka purwa, Pure Shuklan, Kanaha, Pure Gautaman, Terukha, Pure Kalu, Pure Hulasi, Pure Bhola, Adilabad, Sitarampur, Raunci, Domapur, Lodipur Utrawan, Katghar, Pure Baba, Katghar, Aludipur, Pure Bangali, Manheru , Devanna Bajar, Pure Lodhan, Pure Kothaiya, Raipur, Maliyapur Gaon, Semauri, Dihwa, Nagarumau, Pure Lalta, Pure sekhan, Balbhadrapur, Pure Koili, Saraiudilawar, Bheemganj, Pure Baba, Pure Thakurain, Ganj Baderwa, Pure Mahant, Kodarhar, Pure Loharan, Laxman Ganj, Pure Gutuman, Bakhtawarpur, Pure Bake Singh, Sobhwapur, Pure Tula, Rampur, Diktan ka purwa, Kuliyapur, Hardasipur, Pure Jaiki, Pure Naya.and installation new T/F 25 KVA (Katghar Naher, Machhiyanari, Khagipur Sadawa, Govind Singh Ka purwa, Tarapur, Rampur, Newadapatti, Pure Jaicky). under Executive Engineer, Electricity Distribution Division-Dalmau, Raebareli.
Mounting of 100 KVA Transformer on double pole alongwith fitting of all acessories as per RESPO Norms, due to increasing capacity from 63 KVA to 100 KVA.
The work for Earthing and excavation of new Plinth size 2.00X2.00X1.50 for making outer wall of Plinth by 1st class brick work in Cement mortar of ratio1:6 of filling earth in Plinth and providing Ston ballast and fixing 02 No.90 Iballs Rail pieces (6.9 Mtr) of proper distance and then plastering the top and all side of plinth wall with cement Corse and sand in ratio 1:4 and then proper spraying of water alongwith All materials & Labour for Mounting of 250 KVA T/Fs on Plinth alongwith fitting of all accessories,under BUSINESS PLAN 2023-24, as per RESPO Norms.
Mounting of 250 KVA Transformer on double pole alongwith fitting of all acessories as per RESPO Norms, due to increasing capacity from 100 KVA to 250 KVA .
Labour Charges for earthing of 250 KVA 11/0.4 KV Power Transformers completed for digging of 60 fit Borewell type pit (1.5-inch diameter) to install 60 fit long M.S. Pipe (60 fit long) with 1.5-inch diameter work followed by connection of M.S. Stirp 50X6 mm size for Suitable length to G.I. Pipe through proper welding ( Aluminium paint covering of welded joint) with tightening of nuts & bolts and fitting of spaces by homogeneous mixture of coke & sault against medium power transformer body and neutral earthing these includes connection of M.S Strip fot sepret common pit as there will be one pit of each earthing. All required material will be provided by contractor.
Making/Errection/Installation/painting/gouting/welding/febrication/earthig work of Wirmesh Fancing of Jali alongwith Angle isn size of 35X35X5X2500 mm with Nut & Bolts, Washer, Earthing Rod & G.I. wire. Making of 01 No. Gate by M.S. Angle in size of 35X35X5X1000 mm with Nut & Bolts Washer, Earthing Rod & G.I. wire. One No. Gate of M/S Angle in size of 25X5 mm with wiremesh and each of the same. Grouting of M.S. Angle and other required Angles with Grouting materials as per RESPO Norms, under BUSINESS PLAN 2023-24. All required material will be provided by contractor.
Earthing of Body & Neutral of Transformers 25KVA of complete work with fitting of all accessories, as per RESSPO norms.
Earthing of Body & Neutral of Transformers 100 KVA of complete work with fitting of all accessories, as per RESSPO norms.
Earthing of Body & Neutral of Transformers 250 KVA of complete work with fitting of all accessories, as per RESSPO norms.
Digging of pits, fixing & grouting of stay rods as per RESSPO norms including with grouting materials. Then after fixing and nozzling of stay wire.
Earthing of S.T/PCC. Poles as per RESSPO Norms, AS Required.
Stringing, Laying & sagging of 11KV Line by ACSR Weasal conductor, as per RESSPO Norms.
Stringing & sagging of A.B. conductor of L.T. Line , 3X95 sqmm, as per RESSPO Norms.
work for Installtion/Fixing of Holding Clamp, Material Provided by Contractor
work for Installtion/Fixing of "T OFF" Channel, Material Provided by Contractor
work for Installtion/Fixing of "F" Clamp, Material Provided by Contractor
work for Installtion/Mounting of Ston Pad (3X300X300X75)mm, Material Provided by Contractor
Work for Installation/fixing of Top Channel), Material Provided by Contractor
Work for Installation/fixing of S/S Base Channel, Material Provided by Contractor
Recd, Back of 10kVA T/Fs from Site Loacation to Store at Tripula Raebareli alongwoth loading unloading
Recd, Back of 16kVA T/Fs from Site Loacation to Store at Tripula Raebareli alongwoth loading unloading
Recd, Back of 100 kVA T/Fs from Site Loacation to Store at Tripula Raebareli alongwoth loading unloading
M/S Shiv Traders
NATIONAL ENTERPRISES
JYOTI CONSTRUCTION AND SUPPLIER
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .