Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹10.7 L
EMD Value
₹10,650
Closing Date
3 Mar 2020, 4:00 pmClosed
Executive Engineer JDA, Division No. I Rail Head C
Executive Engineer JDA, Division No. I Rail Head Complex, Jammu
Construction of side drain along the road from RTO Office to J and K bank ATM via Excise Toll Post, Jammu
2020_HAUDD_93128_1
JDA-I/2019-20/e-NIT/211 Dated 18.02.2020
Open Tender
Civil Works
Item Rate
45 days
RHC
As per SBD
3 documents required · 3 mandatory
₹800
Yes
Vice Chairman, Jammu Development Authority, Jammu
₹10,650
Yes
11 Mar 2020
18 Feb 2020
4 Mar 2020
18 Feb 2020
3 Mar 2020
18 Feb 2020
Amount
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (Not exceeding 1.5 mtr in width) and for shafts, wells, cesspits and the like not exceeding 1 Osqm on plan, depth upto 1.5mtr. including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth is to be levelled and neatly dressed in: All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:5:10 (1 cement: 5 coarse sand :10 graded stone aggregate 40mm nominal size) Crushed
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) Crushed
Providing and laying damp-proof course 5Crnm thick with cement concrete 1:2:4 (1 cement : 2 co.:Hse sand 4 graded stone aggregate 20mm nominal size) Crushed
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) (Complete Job)
Providing and laying Reinforced Cement Concrete 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) in suspended floors, balconies, landings and staircase having upto 15° slope. excluding cost of centering and shuttering , all work upto floor V level
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete. Thermo-Mechanically Treated bars.
Centring and shuttermg including strutting, propping etc. and removal of form for: Foundations: footings, bases of columns etc. for mass concrete.
Centring and shuttermg including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platform.
Centring and shuttermg including strutting, propping etc. and removal of form for: Edges of slabs and breaks in floors and walls. Under 20cms wide
SHIV SHANKER CONSTRUCTION COMPANY
GCS ASSOCIATES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .