Tender Value
₹12.3 L
EMD Value
₹61,450
Closing Date
20 Mar 2026, 3:00 pmClosed
CHIEF ENGINEER
NNM
Construction of drain and CC road from Parvendras house to Amarpals house in Chotala Wali Gali, Ward-12, Rohta Road, Varnika State Colony
2026_NNMEE_1123981_11
1089/SNV-91T /2026
Open Tender
Civil Works
Fixed-rate
60 days
MEERUT
Please refer Tender documents.
4 documents required · 4 mandatory
₹2,360
NAGAR AYUKT NAGAR NIGAM
₹61,450
11 Apr 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling reinforce cement | 12 | Cum | 1,000 | ₹12,000 |
| 2 | Earth work in filling | 307.8 | Cum | 307.5 | ₹94,648.5 |
| 3 | Concrete with 4 cm. gauge brick ballast, Fine sand of 1.25 F.M. and cement, in proportion of 12:6:1 in foundations and under floors, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. | 9.36 | Cum | 2,930 | ₹27,424.8 |
| 4 | M-150 brick work in 1:4 one cement and four course sand . mortar in foundation and plinth including supply of all materials labour, T & P etc required for proper complition of the work | 29.59 | Cum | 4,600 | ₹1,36,114 |
| 5 | 12 mm thick plaster with1:4 Cement and four course sand including supply all material and labour, T & P required for proper completion of work | 284.4 | Sqm | 160 | ₹45,504 |
| 6 | Cement Concrete with 2.0 cm. gaug;e Approved stone grit coarse sand & cement in the proportion of 4:2:1 including supply of all material labour tools and plant etc required for proper completion of work | 4.14 | Cum | 5,650 | ₹23,391 |
| 7 | RCC 1:1.5:3 in cement coarse sand and grit 2 cm. gauge. | 3.36 | Cum | 7,300 | ₹24,528 |
| 8 | Mild steel or iron such as in plane reinforcement concrete. | 2.64 | Qtl | 8,728 | ₹23,020.97 |
| 9 | Supply and stacking of hard stone 22.4 -53 mm gauge stone ballast i/c All comp work | 61.2 | Cum | 1,991.2 | ₹1,21,861.44 |
| 10 | Consolidation of hard stone ballast by hand rammer including opening out stacks sorting hard stone ballast into three sizes, repairing patches in existing road suface with hard stone ballast making medhi to retain water and ramming and also including carriage of metal upto 30 meters (100 ft.) carriage of water 200 metre supply and maintenance of barriers and all tools and plants required for proper completion of work, hard stone ballast to be supplied to the contractor free at site.but 12cm (loose) thick coat of stone ballast excluding roller charges +all comp. work | 61.2 | Cum | 115 | ₹7,038 |
stage.html
html • 0.08 MB
techsummary_2095451.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
NNMT1.pdf
Tender Documents • 6.12 MB
11.pdf
Additional Documents • 0.13 MB
BOQ_2095451.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .