| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 0 DHANA TEJA BARARI DHANA TEJA MATHURA MATHURA UTTAR PRADESH 281005 | MATHURA | UTTAR PRADESH | 281005 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹98,500
Closing Date
26 Jul 2023, 5:00 pmClosed
Superintending Engineer
EDC, Ayodhya
Shifting of 33 KV, 11 KV and LT Line by underground duouble circuit cable for DHARAMPATH MARK under 33/11 KV substation RAM KI PADI Under Electricity Distribution Division-Ist, Ayodhya
2023_MVVNL_807639_2
20 H(F)(W)/2023-24
Open Tender
Electrical Works
Item Wise
90 days
Ayodhya
As Per Tender Specification
2 documents required · 2 mandatory
₹3,540
Superintending Engineer, EDC
₹98,500
11 Aug 2023
15 Jul 2023
27 Jul 2023
15 Jul 2023
26 Jul 2023
15 Jul 2023
Amount
Part A : For 33 kv & 11 KV Line The work of safe carriage of the following material with loading/unloading from store centre Darshan Nagar to site of work. (Approx. Distance 0 to 20 Km.)
ST Pole 11 Mtr. long (540 sp-52)
33 KV XLPE Cable 3x300 sq mm
33 KV Cable Jointing Kit Outdoor 3x300 sqmm
33 KV Staight Through Cable Jointing Kit 3x300 sqmm
Single Core XLPE Insulated Aluminium Cable 300 sqmm for Jumpring
11 KV XLPE Insulated Armoured Al. Cable of Size 3x185 sqmm
11 KV Cable Jointing Kit outdoor 3x185 sqmm
11 KV Cable Jointing Kit Staight Through 3x185 sqmm
Single Core XLPE Insulated Aluminium Cable 185 sqmm for Jumpring
Transformer 250 KVA 11/.4 KV
LT XLPE Cable Alluminum 1x400 sqmm
LT XLPE Cable Alluminum 1x630 sqmm
LT XLPE Cable Alluminum 3.5x400 sqmm
LT XLPE Cable Alluminum 3.5x240 sqmm
LT XLPE Cable Alluminum 3.5x150 sqmm
LT XLPE Cable Alluminum 3.5x50 sqmm
LT XLPE Cable Alluminum 4x25 sqmm
LT XLPE Cable Alluminum 4x16 sqmm
LT XLPE Cable Alluminum 2x10 sqmm
Distribution Pannel (A- Type)
Distribution Pannel (B- Type)
Distribution Pannel (C- Type)
Energy Meter Single Phase
Energy Meter Three Phase
Energy Meter Three Phase AMR Base
L.T. Staight Through 3.5x240 sqmm
L.T. Staight Through 3.5x150 sqmm
Other Line material i.e. cross arm / conductor / pin insulator / stay / earthing/cable Box etc. except A.B Cable.
Dragging of ST Pole as per RESPO Norms.
Fabrication and Erection of Double Pole Support on ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Grouting and Binding of 11 KV Stay in 1:4:8 ratio with cement, sand and brick ballast including cost of all grouting materials as per RESSPO Norms
Earthing of Poles by Ms Earthing rod of 20x2500 mm and 6 swg earthing wire etc.as per RESPO Norms
Construction of Plinth of Transformer Size 2x2x1.5 Mtr including excavation of foundation, base concreting of 1:6:12 (Cement mortar of Ratio 1:4 foundation, CC in 1:4:8 ratio (Cement fine sand and brick ballast ) and RCC work with ratio 1:2:4 Cement, Coarse sand and Stone Grit of 20 mm gause as per RESSPO norms
Fencing of Transformer Plinth with the help of wire mesh/Barbed wire after grouting proper size of angle as per RESSPO Norms. Inclusive of all material such as Wiremesh/Barbed Wire, Angle Flats, Nut Bolts etc.
Chemical Pipe for Earthing (all the material will be supplied by the contractor.)
Earthing by way of boring and lowering of "B" class G.I. pipe 50 mm dia 20 mtr. Long from ground upto the water lavel it will be connected to the G.S. Strip for T/F nutral connection the earth strip will be welded to the G.I. pipe the work also included top cap and clamps for pouring water the cost of all material will all labour and T n P etc. complete in all respect . (all the material will be supplied by the contractor.)
Laying of 33 KV XLPE Cable 3x300 sqmm in Trunch/Duct
Installation of Heat Shrinkable Type cable jointing kits Outdoor end Termination suitable for 33 KV XLPE cable 3x300 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.)
Installation of Heat Shrinkable Type cable jointing kits Staight Through end Termination suitable for 33 KV XLPE cable 3x300 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.)
Installation of Heat Shrinkable Type cable jointing kits outdoor end Termination suitable for 11 KV XLPE cable 3x185 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.)
Installation of Heat Shrinkable Type cable jointing kits Staight Through end Termination suitable for 11 KV XLPE cable 3x185 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.)
Laying of 11 KV XLPE Cable 3x185 sqmm in Trunch/Duct
Hanaging, Hosting & clamping of G.I. Pipe, channel, nut & Bolt 3x185 mm2 XLPE 11 KV cable as per RESSPO Norms (cost of all accessories will be borne by contractor)
Mounting of 250 KVA Transformer as per RESSPO Norms.
Shifting of Existing 250 KVA /400 KVA Transformer as per RESSPO Norms.
Shifting of Existing 25/63/100 KVA Transformer as per RESSPO Norms.
Laying of LT XLPE Cable Alluminum 1x400 sqmm as per RESSPO Norms.
Laying of LT XLPE Cable Alluminum 1x630 sqmm as per RESSPO Norms.
Laying of LT XLPE Cable Alluminum 3.5x400 sqmm as per RESSPO Norms.
Laying of LT XLPE Cable Alluminum 3.5x240 sqmm as per RESSPO Norms.
Laying of LT XLPE Cable Alluminum 3.5x150 sqmm as per RESSPO Norms.
Laying of LT XLPE Cable Alluminum 3.5x50 sqmm as per RESSPO Norms.
Laying of LT XLPE Cable Alluminum 4x25 sqmm as per RESSPO Norms.
Laying of LT XLPE Cable Alluminum 4x16 sqmm as per RESSPO Norms.
Laying of LT XLPE Cable Alluminum 2x10 sqmm as per RESSPO Norms.
Installation of Distribution Pannel (A- Type)
Installation of Distribution Pannel (B- Type)
Installation of Distribution Pannel (C- Type)
Installation of Energy Meter Single Phase
Installation of Energy Meter Three Phase
Installation of Energy Meter Three Phase AMR Base
Installation of L.T. Staight Through 3.5x240 sqmm
Installation of L.T. Staight Through 3.5x150 sqmm
Shifting Erection and Commissioning of Existing A- Pannel
Shifting Erection and Commissioning of Existing B- Pannel
Shifting Erection and Commissioning of Existing C- Pannel
Supply and Laying of G.I. Pipe 6'' dia with Clamp and Nut Bolt
Supply and Laying of HDPE Pipe (as Per Cable Size)
Supply of Gland 63 mm
Supply of Gland 50 mm
Supply of Gland 25 mm
Supply of Gland 28 mm
Supply of Pre Cost of Pannel Base
Dismantling of old 33 KV line
Dismantling of old 11 KV line
Dismantling of old 415 V line
Part B : Temporery Shifting Work & Emergency work The work of safe carriage of the following material with loading/unloading from store centre Darshan Nagar to site of work. (Approx. Distance 0 to 20 Km.)
ST Pole 11 Mtr. long (540 sp-52)
ACSR Weasel Conductor
11 KV Cable Jointing Kit Outdoor 3x185 sqmm
11 KV Staight Through Cable Jointing Kit 3x185 sqmm
33 KV Staight Through Cable Jointing Kit 3x300 sqmm
Dragging of ST Pole as per RESPO Norms.
Fabrication and Erection of Double Pole Support on ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Fabrication and Erection of Single Pole Support on ST Pole including grouting with 1:4:8 ratio Cement, sand & Brick Ballast& including digging of pit and fixing of all accessories clamp & earthing as per RESPo Norms. (Cost of clamps borne by contractor)
Stringing, Sagging, binding and jumpering of ACSR Weasel as per RESSPO Norms
Installation of Heat Shrinkable Type cable jointing kits Staight Through end Termination suitable for 33 KV XLPE cable 3x300 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.)
Installation of Heat Shrinkable Type cable jointing kits Outdoor end Termination suitable for 11 KV XLPE cable 3x185 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.)
Installation of Heat Shrinkable Type cable jointing kits Staight Through end Termination suitable for 11 KV XLPE cable 3x185 mm2 confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any. ( Jointing Kit supplied by Dept.)
Hindustan Electric Work
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .