Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 CrAccepted-AOC | ₹6.8 Cr Quoted ₹7.2 Cr | L1 | Accepted-AOC Lowest Rate Quoted |
| 2 | L2₹7.5 Cr+₹23.8 L (3.29%)Rejected-Finance 1 9 KANGEYAMAPALAYAM P SULUR COIMBATORE DIST | COIMBATORE | TAMIL NADU | 638459 | ₹7.5 Cr+₹23.8 L (3.29%) | L2 | Rejected-Finance Highest rate quoted |
| 3 | Rejected-Technical COIMBATORE 18 TAMIL NADU | 18 | - | - | Rejected-Technical Pre qualification documents not satisfied |
Tender Value
₹6.8 Cr
EMD Value
₹3.5 L
Closing Date
1 Sept 2020, 3:00 pmClosed
Superintending Engineer Coimbatore
Superintending Engineer Office Highways Department Construction and Maintenance Coimbatore 641018
Widening and strengthening CD Works Drain dip improvement and Up Keeping for a period of 60 months to Government Highways roads in POLLACHI H C and M Sub Division Jurisdiction Package No 32
2020_HWAY_175553_1
package32
Open Tender
Civil Works - Highways
Percentage
270 days
Pollachi
Refer pre qualification document volume I
12 documents required · 12 mandatory
₹0
₹3.5 L
27 Nov 2020
14 Aug 2020
2 Sept 2020
14 Aug 2020
1 Sept 2020
19 Aug 2020
17 Aug 2020 - 17 Aug 2020
eProcurement System Government of Tamil Nadu Created By: HELANSHEELA SAMRAJ Created Date/Time: 04-Sep-2020 04:33 PM Tender Title: Package32 Tender ID: 2020_HWAY_175553_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Coimbatore Circle
Widening and strengthening, CD Works, Drain,dip improvement and Up Keeping for a period of 60 months to Government Highways roads in POLLACHI (H) C&M Sub Division Jurisdiction – Package No. 32 A)Widening from Two lane to Four lane and Strengthening of Pollachi - Palaghat Road at km 2/4 - 3/0 including Dip improvement at km 2/8 and reconstruction of culvert at km 2/8(SH 78 A) including upkeeping for a period of 60 months B) Widening from Two lane to Four lane and Strengthening of Pollachi - Palaghat Road at km 3/0 - 3/500 including Dip improvement and reconstruction of culvert at km 3/4 and construction of drain(SH 78 A) including upkeeping for a period of 60 months C)Widening from Single lane to Intermediate lane and Strengthening of Eripatti - Kollapatti Road. at km 0/0 - 2/210 including reconstruction of culvert at km 1/8 & 2/2 including upkeeping for a period of 60 months D)Widening from Single lane to Intermediate lane and Strengthening of Samathur - Devanurpudur road to Mamarathupatti. at km 0/0 - 2/6 including reconstruction of culvert at km 0/6 including upkeeping for a period of 60 months E)Widening from Single lane to Intermediate lane and Improvements of Samathur - Devanurpudur road to Mamarathupatti. at km 2/6 - 4/0 including CD works including upkeeping for a period of 60 months
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 A VENKATACHALAM 60709405.889 10.000 74793989.000 Seven Crore Fourty Seven Lakh Ninty Three Thousand Nine Hundred and Eighty Nine
2.00 PA CONSTRUCTIONS 60709405.889 6.500 72414179.000 Seven Crore Twenty Four Lakh Fourteen Thousand One Hundred and Seventy Nine
Lowest Amount Quoted BY: PA CONSTRUCTIONS(72414179.000)
BOQ Summary Details Tender Title: Package32 Tender ID: 2020_HWAY_175553_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 PA CONSTRUCTIONS 72414179.000 L1
2 A VENKATACHALAM 74793989.000 L2
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .