Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 2₹3.9 Cr−₹7.9 L (1.97%)Accepted-Finance | ₹3.9 Cr−₹7.9 L (1.97%) | 2 | Accepted-Finance Accepted |
| 2 | 1₹4.0 CrRejected-Finance | ₹4.0 Cr | 1 | Rejected-Finance Rejected |
| 3 | 3₹4.0 Cr−₹1.5 L (0.38%)Rejected-Finance | ₹4.0 Cr−₹1.5 L (0.38%) | 3 | Rejected-Finance Rejected |
| 4 | Rejected-Technical | - | - | Rejected-Technical Rejected |
Tender Value
₹3.8 Cr
EMD Value
₹4.1 L
Closing Date
12 Aug 2026, 5:00 pmClosed
Executive Engineer
Executive Engineer Tauni Devi Division HPPWD Tauni Devi
C/o Building portion, W.S and S.I Septic Tank and rain water harvesting tank)
2026_PWD_140597_1
Construction of Boys Hostel at Sainik School Sujanpur Tihra Distt. Hamirpur (HP
Open Tender
Civil Works - Buildings
Percentage
60 days
Tauni Devi
Please refer Tender documents.
16 documents required · 16 mandatory
₹7,000
EE Tauni Devi
₹4.1 L
25 Aug 2026
6 Aug 2026
13 Aug 2026
6 Aug 2026
12 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains for all kinds of soil and ordinary rocks including dressing of sides and ramming of bottoms upto all lifts including getting out the excavated soil and disposal of surplus excavated soil as directed, within all leads and lifts including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 386.73 | Per cubic metre | 303.06 | ₹1,17,202.39 |
| 2 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 60.53 | Per cubic metre | 1,535.6 | ₹92,949.87 |
| 3 | Stone filling under floor dry hand packed with hard stone of approved quality consolidated properly with hand or mechanical rammer or by hand durmoot to required level as per HPPWD specification 1990 (One thousand Nine hundred Ninety) volume-I including carriage of materials, labour, tool and plants through all modes of transportation with in all leads and lifts, and as per direction of the Engineer-in-charge. including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals. The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 61.53 | Per cubic metre | 927.85 | ₹57,090.61 |
| 4 | Providing and laying in position cement concrete of 1:2:4 (One cement : Two coarse sand) : four graded stone aggregate 20 mm (Twenty millimetre) nominal size for all work up to plinth level excluding the cost of centering and shuttering, finishing and reinforcement including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 2.25 | Per cubic metre | 6,081.85 | ₹13,684.16 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering 1:3:6 (one cement : three coarse sand : six graded stone aggregate) 20mm ( twenty millimetre) nominal size graded stone aggregate upto plinth level including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 17.25 | Per cubic metre | 5,362.45 | ₹92,502.26 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering 1:4:8 (one cement : four coarse sand : eight graded stone aggregate) 40mm ( forty millimetre) nominal size graded stone aggregate upto plinth level including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 72.91 | Per cubic metre | 4,879.1 | ₹3,55,735.18 |
| 7 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering 1:5:10 (one cement : five coarse sand : ten graded stone aggregate) 20mm ( twenty millimetre) nominal size graded stone aggregate upto plinth level including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government. | 36.35 | Per cubic metre | 4,565.75 | ₹1,65,965.01 |
| 8 | Providing and laying damp-proof course 50mm ( fifty millimetre) thick with cement concrete 1:2:4 ( one cement : two coarse sand : four graded stone aggregate 20mm ( twenty millimeter) nominal size including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government | 101.99 | Per square metre | 375.1 | ₹38,256.45 |
| 9 | Providing and applying a coat of residual petroleum bitumen of grade of VG-10 of approved quality using 1.7 kg ( one point seven kilogram ) per square metre on damp proof course after cleaning the surface with brushes and finally with apiece of cloth lightly soaked in kerosene oil including entire carriage of materials in all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge including all incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government | 101.99 | Per square metre | 144.65 | ₹14,752.85 |
| 10 | Random rubble masonry / polygonal uncoursed/ brought to courses with hard stones of approved quality in superstructure above plinth level upto all floor level including leveling up with cement concrete 1:6:12 ( one cement: six coarse sand : twelve graded crushed stone aggregate ) 20mm ( twenty milimetre ) nominal size at window sills, ceiling level and the like at plinth level in cement mortar 1:6 ( one cement: six coarse sand ) including entire carriage of materials within all leads and lifts and as per drawings and technical specifications as per the direction of Engineer-in-Charge and other incidentals.The rates are inclusive of octroi, royality, malkana, toll tax, sale tax, GST or other taxes imposed by the Government | 16.9 | Per cubic metre | 6,106.45 | ₹1,03,199 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.38 MB
Tendernotice_2.pdf
PDF • 4.13 MB
BOQ_208551.xls
BOQ • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .