Tender ID
Tender Value
₹26.9 L
EMD Value
₹26,860
Closing Date
27 May 2026, 6:00 pmClosed
E.E., R.W. Division-I, Ganjam, Berhampur
O/o the S.E., R.W. Division No.-I, In-front of De-paul School, Engineering School Road, Ganjam, Berhampur, 760010
Construction of R.W. Section office Beguniapada-I for the year 2025-26-Building
2026_CERWI_129544_1
OT/02/SERWDG-I/2026-27
National Competitive Bid
Civil Works - Buildings
Percentage
180 days
Berhampur
2 documents required · 2 mandatory
₹6,000
₹26,860
Yes
20 May 2026
20 May 2026
28 May 2026
20 May 2026
27 May 2026
20 May 2026
20 May 2026 - 26 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard or gravelly soil with initial lead and lifts including dressing and leveling the bed of the foundation to the required width and required depth including shoring shuttering,propping bullah,pilling,dewatering from foundation supplying and working of pumps including hire & running charges of pumps & all machinaries required for the work & stacking the excavated materials away from the working areas with cess complete as per specification & direction of the Engineer-in-Charge | 140.08 | cum | 276.88 | ₹38,785.35 |
| 2 | Supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty additional charges, DMF 10% & EMF 5% over royalty & taxes of all materials & cost of all labour & T&P required for the work complete (measurement will be taken for compacted section) as per direction of Engineer-in-Charge. | 59.19 | cum | 805.6 | ₹47,683.46 |
| 3 | Providing Cement concrete (1:3:6) in foundation upto a required depth below ground level and upto a required height above ground level/bed level using 4cm size hard granite metal of approved quality from approved quarry including hoisting, lowering, laying compacting in position in layers not exceeding 15cm thick compacting with proper packing to proper slope and level including watering, curing and cost, conveyance, Cess royality, additional charges, DMF 10% and EMF 5% over royalty taxes of all materials etc. with all labour and T and P required for the work including dewatering, shuttering if necessary complete as per direction of Engineer in charge | 19.48 | cum | 5,968.41 | ₹1,16,264.63 |
| 4 | Fly Ash brick Masonary in cement mortar (1:6) in foundation/superstructure using fly ash brick of 23cmx11cmx8cm size bricks having crushing strength in between 75 kg to 100kg per sq .cm with diamantion tolerance + 8% including splays cutting circular moulding chamfering and corbelling watering and curing for 7days after immersing the bricks in water for six hours before use etc.complete including cost, conveyance, royalties DMF (10% over Royality),EMF(5% over Royality)& Addl.charges and all type of taxes of all materials and labour, T and P required for the work etc. complete as per specification direction of the E.I.C. i. Foundtion | 46.96 | cum | 5,632.63 | ₹2,64,508.3 |
| 4.01 | ii. Super Structure | 48.05 | cum | 5,670.96 | ₹2,72,489.63 |
| 5 | RCC of design mix of M-250 grade of controlled qulity having cube strength of 250kg./cm2 in design mix with minimum quantity of cement as specified in IRC Code of 150 mm. cubes at 28 days curing after mixing & tests conducted in accordance with relevant clauses of IS 456/IS 516/IRC 16/1987/IRC-78/1983 using crusher broken hard granite course aggregate of 10 mm. to 20mm. sizes & proportion as specified in clause-302.6.2 of IRC 21/1987, IS-10262 & subject to mix design in conformity with the grading & proportion of different materials for concrete as specified in the relevant codes of approved quality, obtained from approved quarry & using minimum quantity of cement confirming to codal provision including hoisting, lowering & laying concrete in layers not exceeding 15cm thick compacting with vibrators watering & curing for 28 days including water tight steel centering & shuttering & form works finishing the exposed surface smooth providing beads & grooves, fan hooks wherever necessary including cost, conveyance royalties, DMF (10% over Royality),EMF(5% over Royality)& Addl.charges Cess and all other taxes of all materials with all leads & lifts, cost of all labour T&P & machineries etc. required for the work including dewatering if necessary, complete in all respects as per direction of the Engineer-in-Charge but excluding cost, conveyance of tor steel & binding wire & labour charges for straightening, cutting, bending, binding welding & tying the grills lapping spacing etc. where ever necessary & hoisting & placing in position ( to be paid separately as required for RCC works) i. Column Base | 13.27 | cum | 6,846.23 | ₹90,849.47 |
| 5.01 | ii. Grade Beam | 4.36 | cum | 7,715.91 | ₹33,641.37 |
| 5.02 | iii. Lintel | 1.72 | cum | 14,502.91 | ₹24,945.01 |
| 5.03 | iv. Column | 4.54 | cum | 16,104.55 | ₹73,114.66 |
| 5.04 | v.Beam | 4.06 | cum | 16,104.55 | ₹65,384.47 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 22.12 MB
Tendernotice_1.pdf
PDF • 0.35 MB
BOQ_592000.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .