| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC | ₹2.2 L | L1 | Accepted-AOC accepted |
| Sl No | Description | Qty | Unit | Sathish Kumar & Co L1 |
|---|---|---|---|---|
| 0.00Improvement works | ||||
| 1.00 | Earthwork excvation and depositing on bank with intial lead of 10m and lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders in all soils including cost of all materials, T&P's, labour charges, all leads, lifts, as per standard specification etc., complete. | 1 | 1 m³ | 500 ₹500 |
| 2.00 | Dismantling the existing damaged pressed tiles & clearing away the debrises from the roof top and clean the surface with water including cost of labour lead, lift, etc, complete as per standard specification. | 35 | m2 | 17,500 ₹6.1 L |
| 3.00 | Dismantling the existing PCC flooring including cost of all labour, lead,lift, etc., complete. | 4.5 | m3 | 9,000 ₹40,500 |
| 4.00 | Chipping the existing damaged plastering on wall and ceiling areas wherever necessary and replastering the same with cement mortar 1:4, 12mm thick including SBR-2 chemical, cost of all materials, lead, lift, labour charges, etc., complete. | 36 | m2 | 10,800 ₹3.9 L |
| 5.00 | Brick work in C.M. 1:5 using class II chamber burnt bricks for super structure including, cost of cement, all materials, labour, curing, all leads and lifts, as per standard specification, etc., complete. | 0.5 | m3 | 3,250 ₹1,625 |
| 6.00 | Providing PCC 1:3:6 mix using 40mm HBG metal including cost of all materials, lead, lift, labour charges, etc., complete. | 0.3 | m3 | 1,710 ₹513 |
| 7.00 | Providing PCC 1:2:4 using 6mm chips including SBR-2 chemical, cost of all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete. | 3.5 | m3 | 20,475 ₹71,662.50 |
| 8.00 | Plastering1:5, 12 mm thick including the cost of all material, cement, labour charges, all leads, lifts, as per standard specification. | 3 | m2 | 1,500 ₹4,500 |
| 9.00 | White washing one coats using white cement [janatha cem and the like] approved quality and of reputed make for ceiling including cost of all materials, leads, lift, etc., complete | 36 | m2 | 3,240 ₹1.2 L |
Tender Value
₹2.3 L
EMD Value
₹2,300
Closing Date
6 Jan 2026, 2:00 pmClosed
Superintending Engineer
Superintending Engineer, Udumalpet Electricity Distribution Circle, Tirupur Road, Eripalayam, Udumalpet-642 126.
Carrying out the improvement works in AEE/OandM/Pollachi sub-division office building to arrest leakage in roof and allied civil works at Pollachi Division office premises.
2025_EB_635115_1
C.NO.17 /2025-26,dt-15.12.2025
Open Tender
Civil Works
60 days
Pollachi ss
Proof for EMD, ESI, EPF, GST Registration copy, other details as per BQR and specification
2 documents required · 2 mandatory
₹0
₹2,300
Yes
10 Feb 2026
22 Dec 2025
7 Jan 2026
22 Dec 2025
6 Jan 2026
22 Dec 2025
Earthwork excvation and depositing on bank with intial lead of 10m and lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders in all soils including cost of all materials, T&P's, labour charges, all leads, lifts, as per standard specification etc., complete.
Dismantling the existing damaged pressed tiles & clearing away the debrises from the roof top and clean the surface with water including cost of labour lead, lift, etc, complete as per standard specification.
Dismantling the existing PCC flooring including cost of all labour, lead,lift, etc., complete.
Chipping the existing damaged plastering on wall and ceiling areas wherever necessary and replastering the same with cement mortar 1:4, 12mm thick including SBR-2 chemical, cost of all materials, lead, lift, labour charges, etc., complete.
Brick work in C.M. 1:5 using class II chamber burnt bricks for super structure including, cost of cement, all materials, labour, curing, all leads and lifts, as per standard specification, etc., complete.
Providing PCC 1:3:6 mix using 40mm HBG metal including cost of all materials, lead, lift, labour charges, etc., complete.
Providing PCC 1:2:4 using 6mm chips including SBR-2 chemical, cost of all materials, labour charges including consolidation, curing, all leads, lifts, as per standard specification etc., complete.
Plastering1:5, 12 mm thick including the cost of all material, cement, labour charges, all leads, lifts, as per standard specification.
White washing one coats using white cement [janatha cem and the like] approved quality and of reputed make for ceiling including cost of all materials, leads, lift, etc., complete
Exterior Wall Waterproof cum Decorative Coating Providing and Applying high build exterior waterproof coating for external wall, parapet & Chajja, which is single component, cold applied, Reactive Acrylate copolymer technology. Apply one base coat of universal elastomeric exterior waterproof coating @0.25L/m2 and 2nd coat with Acrylic emultion top coat which can be tinted to any colour @ 0.17L/m2, including 2 coats DFT will be min. 170 microns, The material having followed technical properties: Attains hairline crack bridging up to 2 mm as per EN 1062 part 7, Elongation of >100 % as per ASTMD 412; Tensile strength 2.50 Mpa per ASTM D 412, including priming the surface with 1 coat of Efflorescence resistant penetrating primer dilute with water in the ratio 2:1 spreading at the rate of 0.125 l/m2 in the SSD condition. The finished cost to include surface preparation, making coving at Junction, treatment of cracks completely as per specification.
Painting two coats with interior emulsion of approved quality overone coat of primer for inside wall surfaces after through scraping including cost of all materials, labour, lead, lift, T&P, etc. complete.
Painting with two coats of exterior emulsion paint over one coat of primer of approved quality for outer surfaces after through scraping and make including cost of all materials and labour, etc., complete
Removing the existing Doors, providing fixtures, fittings, lock etc., and refixing in position including cost of labour charges for removing, repairing and refixing, cost of small tools, nails, lock etc.complete.
Removing the existing damaged glass pieces in the Windows and providing new glasses including cost of all materials lead,lift etc, complete.
Painting 2 coats of enamel paint of approved quality and make over wood works including cost of all materials, lead, lift, labour charges, etc., complete. (For old wood work)
Supplying and fixing in position of MS structural sections of various profile to support hand rails, etc., including cutting, hoisting, cost of all materials, labour, T&P, lead, lift etc., complete.
Supplying and laying 32 mm uPVC pipe to withstand the pressure of approved make including cost of PVC pipe and specials, labour for cutting, laying etc ,lead,lift etc,compelte for building water supply arrangements.
Supplying and laying 25 mm uPVC pipe to withstand the pressure of approved make including cost of PVC pipe and specials, labour for cutting, laying etc ,lead,lift etc,compelte for building water supply arrangements.
Supplying and laying 20 mm uPVC pipe to withstand the pressure of approved make including cost of PVC pipe and specials, labour for cutting, laying etc ,lead,lift etc,compelte for building water supply arrangements.
Supplying and fixing of 15 mm dia Chromium plated stop cock including cost of materials, labour charges,lead, lift etc., complete.
Supplying and fixing of P.V.C. Water tank 500 Lits capacity of approved quality including cost of all materials leads and lifts etc., complete and as directed by Engineer at site.
Supplying and fixing cuddapah slab sink of size 600mmx450mmx200 mm with 32mm dia 'B' Class GI waste water pipe & 32mm dia CP waste coupling including cost of all materials lead lift transporting, labour charges etc. complete..
Supplying and fixing of 110 mm dia downfall PVC pipe for rainwater line of 4 kg /cm2 of ISI make including all specials, labour, lead, lift, as per standard specification etc., complete
SGST to be quoted in percentage (value alone), Ex.9%, it should be entered as 9 only
CGST to be quoted in percentage (value alone), Ex.9%, it should be entered as 9 only
Inter-State GST @ 18% for other than Tamil Nadu supplier. If the contractor is within Tamilnadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_760041.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid