| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹39.4 LAccepted-AOC AGRA | UTTAR PRADESH | 282001 | ₹39.4 L | L1 | Accepted-AOC AOC |
| 2 | L2₹44.4 LRejected-Finance HARIBHANPUR KALIKABARA VARANASI | BASTI | UTTAR PRADESH | 271305 | ₹44.4 L | L2 | Rejected-Finance REJECTED |
Tender Value
Refer Docs
EMD Value
₹4.7 L
Closing Date
24 Mar 2026, 12:00 pmClosed
S.E., VARANASI CIRCLE, PWD, VARANASI
S.E., VARANASI CIRCLE, PWD, VARANASI
GRAM PANCHAYAT DAULATIYA SE MUSHAR BASTI SAMPARK MARG KA NAV NIRMAN KA KARYA
2026_CEUVZ_1125944_14
1145/183COM-VNS CIRCLE/2025-26, DATE-24.11.2025
Open Tender
Civil Works - Roads
180 days
VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹4.7 L
20 May 2026
16 Mar 2026
24 Mar 2026
16 Mar 2026
24 Mar 2026
16 Mar 2026
Excavation in soil with Dozer with lead upto 100m Excavation for roaway in soil by mechanical means incluting cutting and pushing the earth to site of embankment upto a distance of 100m, including trimming botton and side slopes in accordance with requiremwnts of lines, grades and cross-sections As per MORD Specification No-302.Including all material,Labour,T&P,Labour cess etc all Taxes etc But Excluding GST.
Construction of Embankment with approved material obtain from Borrow pits with all lift and lead, transporting to site ,spreding grading to required slope and compacting to meet requirement of Table-300-2Including all material,Labour,T&P,Labour cess etc all Taxes etc But Excluding GST.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401 .Including all material,Labour,T&P,Labour cess etc all Taxes etc But Excluding GST.
Providing, laying, spreading and compacting stone aggregates of specific sizes 45-63mm (Sukrut Quarry) to water bound macadam (WBM Grading 2) specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405.Including all material,Labour,T&P,Labour cess etc all Taxes etc But Excluding GST.
Providing, laying, spreading and compacting stone aggregates of specific sizes 22.4-53mm (Sukrut Quarry) to water bound macadam (WBM Grading 3) specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate, watering and compacting to the required density Grading 3 as per Technical Specification Clause SI No- 4.7 (405) (As per MORD).Including all material,Labour,T&P,Labour cess etc all Taxes etc But Excluding GST.
Brick edging on both side of road with first class brick 8cm (3”) wide 12cm (4.50”) deep laid with mud mortar including all materials, lab our, T&P etc. complete. As per SOR Varanasi-2020 Si No-765.Including all material,Labour,T&P,Labour cess etc all Taxes etc But Excluding GST.
Providing and applying primer coat with bitumen emulsion (SS-2) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause SI No- 5.1 (502) (As per MORD).Including all material,Labour,T&P,Labour cess etc all Taxes etc But Excluding GST.
Providing and applying tack coat with Bitumen (VG-10) using emulsion distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.Including all material,Labour,T&P,Labour cess etc all Taxes etc But Excluding GST.
Providing, laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm dalla grit aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 KN static roller capacity, finished to required level and grades to be followed by seal coat of either Type C as per Technical Specification Clause 508.Including all material,Labour,T&P,Labour cess etc all Taxes etc But Excluding GST.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 513.Including all material,Labour,T&P,Labour cess etc all Taxes etc But Excluding GST.
Construction of Subgrade and Earthen Shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000m as per Technical Specification Clause As per MORD 303.1.Including all material,Labour,T&P,Labour cess etc all Taxes etc But Excluding GST.
Providing and laying 350mm dia NP-3 RCC hume pipe medium duty confirm to IS 458:2003 including collars/spigot jointed with stiff mixture of cement in the proportion of 1:2 (1 cement :2 fine sand) including testing of joints, all taxes, transportation charges & contractor profit etc. complete.Including all material,Labour,T&P,Labour cess etc all Taxes etc But Excluding GST.
PART B Maintainance cost :- Maintainance cost will be paid year wise as per Government order No. 17/2024/SA.-113/23-1-2024-23-1099/113/2023 Date 16.01.2024 and HQ UPPWD,Lucknow order No. 3689COPRMC/Mul-23-24 Date 17.02.2024 . Maintainance cost will adjusted as per final cost of construction and will be paid accordingly.
1st year - maintainance cost 0% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
2nd year - maintainance cost 0.75% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
3rd year - maintainance cost 1.5% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
4th year - maintainance cost 2.25% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
5th year - maintainance cost 3% (including labour material T&P etc. complete as per direction of E/I & also including all taxes Labour cess but excluding GST.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.70 MB
T-2.pdf
Tender Documents • 0.47 MB
BOQ_2099644.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid