Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Accept |
| 2 | Accepted-Technical | Accepted-Technical Accept |
| 3 | Accepted-Technical | Accepted-Technical Accept |
| 4 | Rejected-Technical BHAGATPUR SHIVPUR VARANASI | VARANASI | UTTAR PRADESH | 221001 | Rejected-Technical Reject |
Tender Value
₹2.2 Cr
EMD Value
₹6.6 L
Closing Date
18 May 2026, 12:00 pmClosed
CE, LDA
CE Lucknow Development Authority, Lucknow
HARDOI MAIN ROAD ASHRFILAL MARKET SE HOTE HUE AMIT JAYASWAL KE GHAR KE SAMEEP SCHOOL TAK RCC ROAD AND NALI KA NIRMAN KARYA
2026_LDAUP_1145039_1
14/E-Nivida/Ce/2026-27
Open Tender
Civil Works
Fixed-rate
180 days
CE LDA
Please refer Tender documents.
3 documents required · 3 mandatory
₹4,366
secretary Lda
₹6.6 L
Yes
17 Jun 2026
5 May 2026
19 May 2026
5 May 2026
18 May 2026
5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth, lead up to 50m and lift up to 1.5m,as directed by Engineer-in-Charge., All kinds of soil | 1,505.4 | Cum | 140.22 | ₹2,11,087.19 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :, 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). | 595.92 | Cum | 5,381.16 | ₹32,06,740.87 |
| 3 | Mild steel or iron work in plain work such as in R.C.C. or R.B. (when not included in an over all rates ) including bending for proper completion of the work and including supply of steel and its wastage , bends, hooks and authorised overlaps shall be measured up to floor two level. (SI No. 504) (Sanction Rate) | 81,296.11 | Kg | 71.5 | ₹58,12,671.87 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :, 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1,344.96 | Cum | 7,145.72 | ₹96,10,707.57 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings. bases of columns, etc. for mass concrete (PWD SOR 5.9.1/2023) @309.78 | 667.2 | SQM | 309.78 | ₹2,06,685.22 |
| 6 | Wall (any thickness) including attached pilasters, butteresser, plinth and string courses etc. | 4,443.2 | Sqm | 665.58 | ₹29,57,305.06 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.52 MB
BOQ_2140018.xls
BOQ • 0.24 MB
tdsbd.pdf
Tender Documents • 2.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .