| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.1 LAccepted-AOC | ₹54.1 L | L1 | Accepted-AOC LER |
| 2 | L2₹54.2 LRejected-Finance | ₹54.2 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | SAI SURYAA CONSTRUCTION L2 | ESWARI CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00Part I : Improvement of the Road Kovilkollai To Bandrew Kollakottai Km 0/0 - 1/120 R265 | |||||
| 1.01 | Clearing the Scrub jungle including cutting the scrubs and removing away from site etc., | 1,209.6 | Sqm | 6.36 ₹7,693.06 | 6.32 ₹7,644.67 |
| 1.02 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, | 302.4 | Cum | 353.16 ₹1.1 L | 353.06 ₹1.1 L |
| 1.03Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M35 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 | |||||
| 1.04 | Km 0/0 - 1/0 | 473.48 | Cum | 7,473.5 ₹35.4 L | 7,465 ₹35.3 L |
| 1.05 | Km 1/0 - 1/120 | 54 | Cum | 7,729 ₹4.2 L | 7,721 ₹4.2 L |
| 1.06 | Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 3 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete | 336 | Sqm | 365.67 ₹1.2 L | 365.67 ₹1.2 L |
| 1.07 | Provision for Hectometer Stone | 4 | No. | 574.65 ₹2,298.60 | 555 ₹2,220 |
| 1.08 | Provision for Kilometer Stone | 1 | No. | 2,197 ₹2,197 | 2,150 ₹2,150 |
| 1.09 | Provision for Name Board | 1 | No. | 17,647 ₹17,647 | 17,600 ₹17,600 |
Updated dates
Tender Value
₹54.9 L
EMD Value
₹55,000
Closing Date
27 Feb 2026, 3:00 pmClosed
The Project Director, DRDA, Tiiruvannamalai
DRDA, Tiruvannamalai
Improvement of Kovilkollai To Bandrew Kollakottai Km 0/0 - 1/120 R265 with 5 Years Routine maintenance in Jawadhu Hills Block TVM/2025-26/287 under NABARD RIDF 2026-2027
2026_RDTN_657282_1
A11/0456/2026 Dt.12.02.2026 287
Open Tender
Civil Works - Roads
180 days
Jawadhu Hills
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹55,000
13 Mar 2026
13 Feb 2026
27 Feb 2026
13 Feb 2026
27 Feb 2026
13 Feb 2026
Part I : Improvement of the Road Kovilkollai To Bandrew Kollakottai Km 0/0 - 1/120 R265
Clearing the Scrub jungle including cutting the scrubs and removing away from site etc.,
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete,
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M35 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified ) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 3 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete
Provision for Hectometer Stone
Provision for Kilometer Stone
Provision for Name Board
Towards the charges for routline maintenance of the road work executed under NABARD Fund including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRC-SP-20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost for carriageway width of 3.00m & 3.75m
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.07 MB
Technical_Bid_287.pdf
Tender Documents • 0.62 MB
BOQ_788258.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid