Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 CrAccepted-AOC | ₹5.8 Cr Quoted ₹6.0 Cr | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹6.1 Cr+₹11.6 L (1.94%)Rejected-Finance | ₹6.1 Cr+₹11.6 L (1.94%) | L2 | Rejected-Finance Higher than lowest |
| 3 | L3₹6.3 Cr+₹29.1 L (4.85%)Rejected-Finance IDUVAI TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | ₹6.3 Cr+₹29.1 L (4.85%) | L3 | Rejected-Finance Higher than lowest |
Tender Value
₹5.8 Cr
EMD Value
₹3.1 L
Closing Date
31 Dec 2019, 3:00 pmClosed
Superintending Engineer-H-C and M Villupuram
Office of the Superintending Engineer-H-C and M- Circle Ellis Chatram Road-Vazhudareddy-Villupuram
Widening- Strengthening, Improvements to Riding quality Culvert including upkeeping works in Tirukoilur-H-C and M Subdivision Jurisdiction Package 47
2019_HWAY_149531_1
TN30-2019-20-HDO-Dt.25.11.2019
Open Tender
Civil Works - Highways
Percentage
180 days
Kallakurichi
Please Refer Tender Document VOL-I
8 documents required · 8 mandatory
₹0
₹3.1 L
Yes
29 Jan 2020
29 Nov 2019
3 Jan 2020
29 Nov 2019
31 Dec 2019
9 Dec 2019
2 Dec 2019 - 4 Dec 2019
eProcurement System Government of Tamil Nadu Created By: Rajababu A Created Date/Time: 08-Jan-2020 10:52 AM Tender Title: CRIDP_2019-20_Package_47 Tender ID: 2019_HWAY_149531_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Villupuram Circle
Widening, Strengthening, Improvements to Riding quality, Culvert including upkeeping works in Tirukoilur (H) C&M Subdivision Jurisdiction (Package 47) A. Widening from Two lane to Three lane and Strengthening of Villupuram - Mambazhapattu - Tirukoilur road at km 69/2 - 70/0 including reconstruction of narrow culvert at Km.69/8 (SH7) including upkeeping for a period of 60 months B. Widening from Two lane to Three lane and Strengthening of Villupuram - Mambazhapattu - Tirukoilur road at km 70/0 - 71/0 (SH7) including upkeeping for a period of 60 months C. Improvements to Riding Quality at km 74/6 - 75/630 of Villupuram - Mambazhapattu - Tirukoilur road (SH7) including upkeeping for a period of 60 months D. Improvements to Riding Quality at km 42/0 - 43/0 and 43/6 - 43/8 of Virudhachalam - Ulundurpet - Villupuram road (SH69) including upkeeping for a period of 60 months E. Improvements to Riding Quality at km 42/987 - 46/0 of Cuddalore - Tirukoilur - Sankarapuram Road (SH68) including upkeeping for a period of 60 months F. Improvements to Riding Quality at km 46/0 - 48/0 of Cuddalore - Tirukoilur - Sankarapuram Road (SH68) including upkeeping for a period of 60 months G. Improvements to Riding Quality at km 1/4 - 2/340 of Thandarai Road including upkeeping for a period of 60 months H. Improvements to Riding Quality at km 3/0 - 4/2 and 4/8 - 5/2 of Kandachipuram Veerapandi Road including upkeeping for a period of 60 months
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 R.ANBALAGAN 51922577.810 3.000 59897886.000 Five Crore Ninty Eight Lakh Ninty Seven Thousand Eight Hundred and Eighty Six
2.00 RAMACHANDRAN 51922577.810 8.000 62805550.000 Six Crore Twenty Eight Lakh Five Thousand Five Hundred and Fifty
3.00 A S CONSTRUCTIONS 51922577.810 5.000 61060952.000 Six Crore Ten Lakh Sixty Thousand Nine Hundred and Fifty Two
Lowest Amount Quoted BY: R.ANBALAGAN(59897886.000)
BOQ Summary Details Tender Title: CRIDP_2019-20_Package_47 Tender ID: 2019_HWAY_149531_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 R.ANBALAGAN 59897886.000 L1
2 A S CONSTRUCTIONS 61060952.000 L2
3 RAMACHANDRAN 62805550.000 L3
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .