Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹149.0 CrAdmitted-Finance | ₹149.0 Cr | L1 | Admitted-Finance |
| 2 | L2₹155.8 CrAdmitted-Finance 623 ARCONS INFRASTRUCTURES AND CONSTRUCTION PVT LTD NAGPUR ROAD CHHINDWARA CHHINDWARA MADHYA PRADESH 480001 | CHHINDWARA | MADHYA PRADESH | 480001 | ₹155.8 Cr | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical BLOCK NO 758 EAGLE NEST BEHIND CHOPRA COURT ULHASNAGAR 421003 DIST THANE | 421003 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | ARCONS INFRASTRUCTURES AND CONSTRUCTIONS PVT. LTD. L2 | INFRATECH CONSTRUCTION COMPANY L1 |
|---|---|---|---|---|---|
| 1.00EPC NAG-II (60A) | |||||
| 1.01 | Improvemennt to Karanja Waghoda Jalalkheda Road SH 323, Km 40/00 to 50/200 Tal. Karanja Dist. Wardha (Actual Total Length 10.2 Km) Hingni Bor Dam Dhanoli Kajali Savali to NH 06 road MDR 58 Km 23/00 to 45/500 (Actual Length 22.500 Km) Total Length - 32.7 Km Tal. Karanja Dist. Wardha on EPC mode | 1 | Lumpsum | 1,55,79,96,360 ₹155.8 Cr | 1,48,99,99,999 ₹149.0 Cr |
Tender Value
₹137.0 Cr
EMD Value
₹1.4 Cr
Closing Date
3 May 2024, 5:00 pmClosed
Managing Director, MSIDCL
B/13, 13th floor, Bakhtawar building, 229, Nariman Point, Mumbai 400 021
EPC NAG-II (60A) - Improvemennt to Karanja Waghoda Jalalkheda Road SH 323, Km 40/00 to 50/200 Tal. Karanja Dist. Wardha (Actual Total Length 10.2 Km) Hingni Bor Dam Dhanoli Kajali Savali to NH 06 road MDR 58 Km 23/00 to 45/500 (Actual Length 22.500 K
2024_MSIDC_1031541_13
E-TENDER NOTICE NO.06 OF 2023-2024
Open Tender
Civil Works
912 days
Nagpur
As Per Tender Documents
6 documents required · 6 mandatory
₹5,900
₹1.4 Cr
Yes
MSIDCL Office
26 Jun 2024
11 Mar 2024
6 May 2024
11 Mar 2024
3 May 2024
13 Apr 2024
11 Mar 2024 - 12 Apr 2024
12 Apr 2024
Amount
EPC NAG-II (60A)
Improvemennt to Karanja Waghoda Jalalkheda Road SH 323, Km 40/00 to 50/200 Tal. Karanja Dist. Wardha (Actual Total Length 10.2 Km) Hingni Bor Dam Dhanoli Kajali Savali to NH 06 road MDR 58 Km 23/00 to 45/500 (Actual Length 22.500 Km) Total Length - 32.7 Km Tal. Karanja Dist. Wardha on EPC mode
ARCONS INFRASTRUCTURES AND CONSTRUCTIONS PVT. LTD.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid