Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹24.0 LAccepted-AOC | ₹24.0 L | 1 | Accepted-AOC L-1 |
| 2 | 2₹26.1 L+₹2.0 L (8.38%)Rejected-Finance NA | NA | NA | 121004 | ₹26.1 L+₹2.0 L (8.38%) | 2 | Rejected-Finance L-2 |
| Sl No | Description | Qty | Unit | M/S S R CONSTRUCTION L2 | SURESH CHANDRA CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.00 | E/W in foundation in dry soil including lift upto 1.5 M and lead upto 30 M including back filling, watering and ramming of excavated earth into the structure and the sides of foundation. | 219 | cum | 30 ₹6,570 Lowest | 50 ₹10,950 |
| 2.00 | Plain Cement Concrete 1:3:6 in cement coarse sand and stone grit in back sides of abutment and wings i/c all cost of material, labour,T&P,etc complete. | 43.8 | cum | 5,700 ₹2,49,660 | 5,500 ₹2,40,900 Lowest |
| 3.00 | Laying C.C. in 1:2:4 mix in Cement Coarse sand and Stonr grit in foundation i/c all cost of material, labour,T&P,etc complete. | 43 | cum | 6,000 ₹2,58,000 | 5,500 ₹2,36,500 Lowest |
| 4.00 | Class - 150 ( Non modular ) brick work in 1:3 cement and coarse sand of FM not less than 1.25 mortar in foundation including supply of all material, labour and T&P etc. required for proper completion of the work. | 150 | cum | 5,500 ₹8,25,000 | 5,200 ₹7,80,000 Lowest |
| 5.00 | Providing Brick on edge pitching including cost of all labour and T&P etc. Complete./Sqm. | 64.8 | sqm | 500 ₹32,400 | 20 ₹1,296 Lowest |
| 6.00 | Reinforced Cement Concrete work for Super structure of M20 A20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc .required for proper completion of the work in all conditions. | 26.3 | cum | 7,000 ₹1,84,100 | 6,000 ₹1,57,800 Lowest |
| 7.00 | Reinforced RCC Cement Concrete work for Super structure of M20 A20 (1:1:2) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc .required for proper completion of the work in all conditions. | 77.7 | cum | 7,500 ₹5,82,750 | 6,000 ₹4,66,200 Lowest |
| 8.00 | Centering and Shuttering in of R.C.C. work including all labour , T&P, etc. | 124.8 | sqm | 700 ₹87,360 | 300 ₹37,440 Lowest |
| 9.00 | Supplying and laying TMT Steel bar reinforcement as per approved drawing, including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding T&P etc. required for proper completion of the required work. | 4.8 | MT | 68,000 ₹3,26,400 Lowest | 75,000 ₹3,60,000 |
| 10.00 | Struck deep cement pointing 1:2 Cement sand mortar.including cost of all labour and T&P etc. Complete. / Sqm | 234 | sqm | 100 ₹23,400 Lowest | 100 ₹23,400 Lowest |
Tender Value
₹31.1 L
EMD Value
₹63,000
Closing Date
22 May 2026, 5:00 pmClosed
EXECUTIVE ENGINEER MGCCD 12 ALIGARH
DODHPUR CIVIL LINES ALIGARH
CONSTRUCTION OF DRB AT KM 10.950 OF DHARAMPUR DY. IN DISTRICT SAMBHAL
2026_UPIDC_1147187_5
02/EE/2026-27
Open Tender
Civil Works - Bridges
Item Rate
90 days
SAMBHAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹604
₹63,000
18 Sept 2026
15 May 2026
23 May 2026
15 May 2026
22 May 2026
15 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | E/W in foundation in dry soil including lift upto 1.5 M and lead upto 30 M including back filling, watering and ramming of excavated earth into the structure and the sides of foundation. | - | cum | - | - |
| 2 | Plain Cement Concrete 1:3:6 in cement coarse sand and stone grit in back sides of abutment and wings i/c all cost of material, labour,T&P,etc complete. | 1 | cum | - | - |
| 3 | Laying C.C. in 1:2:4 mix in Cement Coarse sand and Stonr grit in foundation i/c all cost of material, labour,T&P,etc complete. | - | cum | - | - |
| 4 | Class - 150 ( Non modular ) brick work in 1:3 cement and coarse sand of FM not less than 1.25 mortar in foundation including supply of all material, labour and T&P etc. required for proper completion of the work. | - | cum | - | - |
| 5 | Providing Brick on edge pitching including cost of all labour and T&P etc. Complete./Sqm. | 1 | sqm | - | - |
| 6 | Reinforced Cement Concrete work for Super structure of M20 A20 (1:1.5:3) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc .required for proper completion of the work in all conditions. | - | cum | - | - |
| 7 | Reinforced RCC Cement Concrete work for Super structure of M20 A20 (1:1:2) mix coarse sand of F.M. not less than 2.25 and 20 mm graded coarse aggregate including cost of all materials, labour charges, curing work, T&P etc .required for proper completion of the work in all conditions. | - | cum | - | - |
| 8 | Centering and Shuttering in of R.C.C. work including all labour , T&P, etc. | 1 | sqm | - | - |
| 9 | Supplying and laying TMT Steel bar reinforcement as per approved drawing, including removal of rust, cutting, bending, binding, placement with proper overlapping, providing chairs etc. required.The item includes cost of all material, labour charges, providing & binding T&P etc. required for proper completion of the required work. | 1 | MT | - | - |
| 10 | Struck deep cement pointing 1:2 Cement sand mortar.including cost of all labour and T&P etc. Complete. / Sqm | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.35 MB
fivetb.pdf
Tender Documents • 1.23 MB
BOQ_2145774.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .