| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹34.6 LAdmitted-Fee/PreQual/Technical/Finance MAHANADI SOUTH DIVISION NO I CUTTACK | -4.99% | ₹34.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹36.4 L+₹1.8 L (5.25%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹36.4 L+₹1.8 L (5.25%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹36.4 L+₹1.8 L (5.25%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹36.4 L+₹1.8 L (5.25%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L2₹36.4 L+₹1.8 L (5.25%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹36.4 L+₹1.8 L (5.25%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L2₹36.4 L+₹1.8 L (5.25%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹36.4 L+₹1.8 L (5.25%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹36.4 L
EMD Value
₹36,350
Closing Date
29 Jul 2026, 5:00 pmClosed
Divisional Forest Officer Angul Division Angul
Divisional Forest Officer Angul Division Angul At/Po/PS/Dist-Angul
Construction of Masonary Parapet wall along U/S of Rengali Reservoir and Development of Jetty area for Tourism near Rengali Dam under Kaniha Range of Angul Forest Division
2026_DFOA_136481_1
DFO-ANG-05/2026-27
Open Tender
Civil Works - Others
Percentage
45 days
Rengali Kaniha Angul
Please refer Tender documents.
3 documents required · 3 mandatory
₹6,000
₹36,350
Yes
30 Jul 2026
20 Jul 2026
30 Jul 2026
20 Jul 2026
29 Jul 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing & grubbing road land including uprooting rank vegetation,grass, bushes,shrubs,sapling & trees girth up to 300mm,removal of stumps of trees cut earlier & disposal of unserviceable materials & stacking of servicible material to be used or uctioned up to a lead of 1000 m including removal & disposal of top organic soil not exceeding 150m in thicknes as per approved specification and direction of the Engineer -in- Charge. | 1,350 | Sqm | 7.27 | ₹9,814.5 |
| 2 | Excavation of Foundation in hard soil, Levelling foundation trench etc complete including cost of labour, Labourcess,T&P materials etc.complete and as per the direction of the Engineer-in-charge. | 155.7 | Cum | 282.9 | ₹44,047.53 |
| 3 | Excavation of Foundation in hard rock( Granite) removed by chiselling including dressing & Levelling the bed not exceeding 1.5m in depth & depositing the soil with initial lead & lift etc complete including cost of labour, Labourcess,T&P materials etc.complete and as per the direction of the Engineer-in-charge. | 8.1 | Cum | 3,113.9 | ₹25,222.59 |
| 4 | Filling foundation and plinth with clean course sand, well watered and rammed with cost, conveyance, royalty and taxes of all materials and cost of all labour, T&P, workers welfare cess etc. complete as per approved specification and direction of the Engineer -in- Charge. | 43.09 | Cum | 793.1 | ₹34,174.68 |
| 5 | Cement Concrete (1:3:6 ) using 40 mm size hard black granite crusher broken metals with cost conveyance, taxes of all materials and labour etc. complete as per direction of Engineer-in-charge | 183.67 | Cum | 6,105.5 | ₹11,21,397.18 |
| 6 | Providing Reinforced cement concrete of grade M-20 using 20 mm down graded size hard granite crusher broken chips and sharp sand of approved quality from approved quarry, mixing, hoisting, lowering, laying, compacting and curing for specified days with cost, carriage, royality and taxes of all materials and cost of all labour, T&P, workers welfare cess etc complete and as per direction of the Engineer-in-charge. | 92.37 | Cum | 5,877.3 | ₹5,42,886.2 |
| 7 | Cutting, bending, binding, straightening and tying the grills and placing in position including cost of M.S or Tor steel & binding wires etc.complete and as per the direction of the Engineer-in-charge. | 28.1 | Qntl | 9,399.9 | ₹2,64,137.19 |
| 8 | Rigid smooth centering & shuttering for plain C.C / R.C.C. works including removing the same after specified days of casting with cost of all labour, T&P, nail, workers welfare cess etc. complete as per approved specification and direction of the Engineer-in- Charge | - | - | - | - |
| 9 | R.C.C. Column base | 217.57 | Sqm. | 249.8 | ₹54,348.99 |
| 10 | R.C.C. Column | 168.8 | Sqm. | 1,219.7 | ₹2,05,885.36 |
stage.html
html • 0.07 MB
finance_602382.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.63 MB
Tendernotice_2.pdf
PDF • 3.98 MB
BOQ_602382.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .