| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC first lowest |
| 2 | L2₹1.4 Cr+₹4.4 L (3.19%)Rejected-Finance | ₹1.4 Cr+₹4.4 L (3.19%) | L2 | Rejected-Finance L2 |
| 3 | L3₹1.5 Cr+₹15.2 L (11.0%)Rejected-Finance | ₹1.5 Cr+₹15.2 L (11.0%) | L3 | Rejected-Finance L3 |
| 4 | L4₹1.7 Cr+₹34.9 L (25.3%)Rejected-Finance 143 SHASTRI NAGAR LAKHIMPUR KHERI | ₹1.7 Cr+₹34.9 L (25.3%) | L4 | Rejected-Finance L4 |
Tender Value
Refer Docs
EMD Value
₹3.7 L
Closing Date
3 Feb 2025, 4:00 pmClosed
SE ICC MAHOBA
OFFICE OF THE SE ICC BAZARIYA MAHOBA
Restoration of Cahudhri Charan singh Charkhai dal nahar in between km 9.800 to 13.000(lot-1)
2025_UPIDC_990534_5
12/SE/2024-25
Open Tender
Civil Works
Item Rate
240 days
charkhari
as per nit and tender document
2 documents required · 2 mandatory
₹4,875
₹3.7 L
26 Apr 2025
27 Jan 2025
3 Feb 2025
27 Jan 2025
3 Feb 2025
27 Jan 2025
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work. (Rate are excluding GST)
Jungle Clearance cutting heavy under growth and bushes upto 7.50 cm diameter with collection and removal of roots with collection & Removal including all cost of material, labour, T&P etc. complete.
Dismantaling cement concrete floor and brick/R.C.R. Masonary work including stacking of dismantled material with in a distance of 60m. Including all cost of material labour T&P etc.
Earth work in foundation of walls, piers, abutments etc.with disposal with in 30-m lead and 1.5 m. lift. in Mar, Kabar and Rankar soil.
Earth work in Excavation including all cost of labour material T&P etc.
Earth Work in filling in Mar, Kabar, Ranker & Kanker Mixed Soil with all lead and lift including all cost of material labour T&P etc.
Dewatering including all cost of material labour T&P etc. required for proper completion of work
Laying Coarse Sand in foundation including all cost of labour material T&P etc.required for proper completiion of work.
P.C.C. 1:3:6 nominal mix including all cost of labour material T&P etc. required for proper completion of work
Centering and shuttering for P.C.C. work including cost of shuttering. material and T & P etc. required. for proper completion of work.
Centering and shuttering for R.C.C. work including cost of shuttering. material and T & P etc. required. for proper completion of work.
Carriage cutting, beding, binding and placing Steel for reinforcement with cost of binding wire including cost of all material, labour and T&P etc. required for proper completion of work.
Laying R.C.C. 1:1.5:3 nominal mix by mechanical mixing. including cost of all material, labour and T&P etc. all leads and lifts for proper completion of work as per direction of Engineer-in-charge.
C.C. 1:1.5:3 Nominal Mix with cement coarse sand and crushed hard stone grit in construction of sleeper (200x150)mm,Toe Wall and etc. including all cost of labour material T&P etc. required for proper completion of work
C.C. 1:2:4 Nominal Mix with cement coarse sand and crushed hard stone grit including all cost of labour material T&P etc. required for proper completion of work
Providing and fixing P.V.C. pipe 75 MM dia inclufing all cost of material, labour and T&P etc. complete of work.
Supplying and laying of 900mm dia. R.C.C. hume pipe including all Carriage, loading, unloading, material, labour, T&P etc. complete of work.
Prepration of subgrade for Lining work excluding cost of earth work.
C.C. Lining 1:1.5:3 Nominal Mix with cement coarse sand and crushed hard stone grit including all cost of labour material T&P etc. required for proper completion of work
Laying 125 micron polythene sheet including all cost of labour material T&P etc.
Construction Joint of C.C. Lining with bitumen sealing compound including all cost of labour Material T&P etc.
Laying Two Coat of Bitumen sealing compond on top of sleepers of C.C. Lining works including all cost of labour material T&P etc.
R.C.R. Masonary with 1:3 cement mortar (cement and coarse sand) including all cost of labour material T&P etc. Reusable dismentled material cut stone boulder from item no.2 shall be used up to 20% from dismentled quantity if dismentled material found more than 20% usable shall be taken on stock as per direction of Engineer-in-Charge.
Struck Pointing (Raised or Struck Deep on Stone masonry in Cement or lime) including all cost of labour material T&P etc.
Cement Plaster with 1:3 Cement Mortar (cement and Coarse sand) 6mm thick including all cost of material, labour, T&P etc. complete.
Painting Two coat on wall including scraping old paint & cost of all material, labour and T&P required for proper finish of work.
Removal of Saturated (excluding cost of dewatering) in Mar, Kabar and ranker soil with all lead and lift including all cost of material, labour, T&P etc. complete.
M/S SURESH CHANDRA GUPTA (BID ID -4903163)
M/S LODHI ENTERPRISES (BID ID -4904656)
M/s Nav Bharat Construction (BID ID -4899559)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .