Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2 L
Closing Date
5 Oct 2021, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
er farooq sultanpuri
PHE Division kupwara
JACKETING and bed treatment of SR at Hayan
2021_PHE_142011_4
E NIT 21 OF 2021-22
Open Tender
Civil Works
Item Wise
6 days
hayan
Please refer Tender documents.
4 documents required · 4 mandatory
₹150
Yes
PHE Division kupwara
Exempted
6 Oct 2021
30 Sept 2021
6 Oct 2021
30 Sept 2021
5 Oct 2021
30 Sept 2021
120 days
Amount
Removal of silt/ Mulba from Bed of S.R by manual labours using ropes and buckets along with other arrangements what so ever required incl,, disposal of same as per directions of Engineer In-Charge/ requirement of Site and washing of walls using Tar Bursh with chlorinated water Complete Job.
Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement.1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for:
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
6 mm cement plaster to ceiling of mix 1 : 3 (1 cement : 3 fine sand)
Providing and fixing of MS Man Hole cover of 0.75x0.75m size fitted with angle iron frame 40x40x4mm with 2mm thick MS plate incl. all locking arrangements and carriage by all means complete job.
Carriage of materials from Kupwara Upto Site of work by Mech. Transport including, loading, unloading and stacking for
Cement/steel for 15Kms
Sand/Stone aggregate for 30Kms
M/S MAJED AHMAD MIR
MOHD MUKHTAR PAYER
MOHD AKBER LONE
ABDUL RASHID MIR
SHAMIM AHMAD SHIEKH
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .