Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹4.9 L+₹74,001.34 (17.9%)Rejected-Finance | L2 | Rejected-Finance Not L1 bidder | |
| 3 | L3₹5.4 L+₹1.2 L (30.2%)Rejected-Finance MIG 105 R P NAGAR KORBA C G | L3 | Rejected-Finance Not L1 bidder |
Tender Value
₹7.5 L
EMD Value
₹9,400
Closing Date
6 May 2023, 5:00 pmClosed
Staff Officer Mining SECL Korba Area
Office of the General Manager Korba Area Post and District Korba Chhattisgarh
Construction of 10 nos. ventilation stoppings and Repairing/Replastering of old ventilation stoppings north side of 41 dip, Rajgamar 6 and 7 incline.
2023_SECL_277797_1
SECL/KB/GM/SO(M)/eNIT/23-24/03
Open Tender
Civil Works - Buildings
Item Rate
90 days
Korba
As per NIT
3 documents required · 3 mandatory
₹9,400
1 Jun 2023
25 Apr 2023
8 May 2023
25 Apr 2023
6 May 2023
26 Apr 2023
25 Apr 2023 - 29 Apr 2023
Amount
Groove cutting in roof/ floor (Coal) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
Groove cutting in roof/ floor (Hard Stone) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
Groove cutting in roof/ floor (Soft Stone) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground)
Loading of material (Bricks) into tub on surface within a lead of 50m.
Loading of material (Cement) into tub on surface within a lead of 50m.
Loading of material (Sand) into tub on surface within a lead of 50m.
Unloading of material (Bricks) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate), Lead 100m
Unloading of material (Cement) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate), Lead 100m
Unloading of material (Sand) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate), Lead 100m
Brick work with clay flyash F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor five level in : Cement mortar 1:6 (1 cement : 6 coarse sand) 6.32.2
12 mm cement plaster of mix: 1:6 (1 cement : 6 coarse sand). DSR Item No. 13.4.2
Brick workwith flyash F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor five level in : Cement mortar 1:6 (1 cement : 6 coarse sand) DSR Item No. 6.32.2
12 mm cement plaster of mix: 1:6 (1 cement : 6 coarse sand). DSR Item No. 13.4.2
Total impact of GST for the purpose of CTC
RAGHUBIR CHANDRA
HANUMAN PRASAD AGRAWAL
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_287563.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .