Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹10.2 LAdmitted-Finance | -15.00% | ₹10.2 L | L1 | Admitted-Finance |
| 2 | L2₹10.6 LAdmitted-Finance | -11.77% | ₹10.6 L | L2 | Admitted-Finance |
| 3 | L3₹12.0 LAdmitted-Finance | -0.03% | ₹12.0 L | L3 | Admitted-Finance |
| 4 | L4₹12.1 LAdmitted-Finance | +1.00% | ₹12.1 L | L4 | Admitted-Finance |
| 5 | L5₹12.2 LAdmitted-Finance | +1.50% | ₹12.2 L | L5 | Admitted-Finance |
Updated dates
Tender Value
₹12 L
EMD Value
₹36,000
Closing Date
21 Apr 2026, 4:00 pmClosed
EXECUTIVE ENGINEER PMGSY DIVISION KATHUA
pmgsy division kathua
Permanent Restoration L024 Tridwan
2026_JKRRD_147248_8
EE/PMGSY/KUA03of2026-27 DATED10.04.2026
Open Tender
CIVIL
60 days
Permanent Restoration L024 Tridwan
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
EXECUTIVE ENGINEER PMGSY DIVBISION KATHUA
₹36,000
pmgsy division kathua
6 May 2026
11 Apr 2026
22 Apr 2026
11 Apr 2026
21 Apr 2026
11 Apr 2026
11 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres Ordinary soil 80%, Ordinary rock 20% | 288 | cum | 304.18 | ₹87,603.84 | BI01010001010000000000000515BI0100001119 |
| 2 | Supplying and packing of stone boulder in 4mm dia (100mm x100m mesh) GI wire crates apron complete as per technical specifications and directions of engineer in charge including cost of wire crates | 535.68 | cum | 1,765.59 | ₹9,45,791.25 | BI01010001010000000000000515BI0100001120 |
| 3 | Back Filling behind abutments ,wing walls and return walls with stone boulders | 18 | cum | 937.9 | ₹16,882.2 | BI01010001010000000000000515BI0100001121 |
| 4 | Supplying and laying including digging, carrying by lorry, filling River Bed Material including watering & consolidation in layers to specified lines, camber, grades and cross sections. Finished work including material , labour all leads , lifts and carriage of material by MT/HL. ( for berm filling) | 25.05 | cum | 350 | ₹8,767.5 | BI01010001010000000000000515BI0100001122 |
| 5 | Carriage of boulders for an avg lead of 6.0 km | 553.68 | cum | 254.59 | ₹1,40,961.39 | BI01010001010000000000000515BI0100001123 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_229387.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid