| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 CrAccepted-AOC NEAR WARD NO 15 CHHABRA COLONY NEAR NEW BYE PASS ASANDH 132039 HARYANA | KARNAL | HARYANA | 132039 | ₹4.1 Cr | L1 | Accepted-AOC ok |
| 2 | L2₹4.2 Cr+₹9.8 L (2.36%)Rejected-Finance HSVP PANCHKULA | PANCHKULA | HARYANA | 133301 | ₹4.2 Cr+₹9.8 L (2.36%) | L2 | Rejected-Finance ok |
| 3 | L3₹4.3 Cr+₹13.9 L (3.36%)Rejected-Finance FLAT NO 2450 KRISHNA COLONY JIND 126102 | JIND | HARYANA | 126102 | ₹4.3 Cr+₹13.9 L (3.36%) | L3 | Rejected-Finance ok |
| 4 | L4₹4.3 Cr+₹14.4 L (3.49%)Rejected-Finance NOT AVAILABLE | ₹4.3 Cr+₹14.4 L (3.49%) | L4 | Rejected-Finance ok |
| 5 | L5₹4.3 Cr+₹19.3 L (4.65%)Rejected-Finance HSVP PANCHKULA | PANCHKULA | HARYANA | 133301 | ₹4.3 Cr+₹19.3 L (4.65%) | L5 | Rejected-Finance ok |
Tender Value
₹5.3 Cr
EMD Value
₹10.7 L
Closing Date
16 Oct 2025, 1:00 pmClosed
BHUPENDER SINGH
DIV 1 Hissar
Providing, cutting, jointing and laying of 600mm dia HDPE Rising main and 1000mm dia RCC pipe NP4 with HDPE lining for Construction of RCC collecting tank, Control Room and Boundary Wall for External disposal works in Sector-6,7,8and9, Jind (Balance
2025_HBC_477542_1
202587A9531D 134A 492F BD8A F6A9238C1C32259HSV
Open Tender
Civil Works
Works
270 days
Jind
Providing, cutting, jointing and laying of 630mm dia HDPE Rising main PN-8 PE-100, 400mm dia DI pipe K-9 and 1000mm dia RCC pipe NP4 with HDPE lining for Construction of RCC collecting tank, Control Room and Boundary Wall, providing and installation
2 documents required · 2 mandatory
₹5,000
Yes
₹10.7 L
Yes
20 Feb 2026
11 Oct 2025
16 Oct 2025
11 Oct 2025
16 Oct 2025
11 Oct 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | [10.1.1.1]Providing and laying of base course of floors consisting of 100 mm thick cement 1:8:16 and 100 mm sand or stone filling. 1.1. Re-compacting excavated soil in plinth under floors, including watering, ramming, consolidating and dressing complete. [Through Rate] | 50.2 | cum | 73 | ₹3,664.6 |
| 2 | [10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate] | 11.92 | cum | 1,863 | ₹22,206.96 |
| 3 | [10.37.1]Providing and fixing of Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of the slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : 1. 25 mm thick [Through Rate] | 56.31 | Sqm | 790 | ₹44,484.9 |
| 4 | [10.58]Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS : 15622 (thickness to be specified by the manufacturer ) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1 cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm including pointing in white cement mixed with pigment of matching shade complete. [Through Rate] | 19 | Sqm | 538 | ₹10,222 |
| 5 | [11.25.1]Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): 1. Flush / Ruled/ Struck or weathered pointing [Through Rate] | 355.4 | Sqm | 79 | ₹28,076.6 |
| 6 | [11.4.1]10 mm thick cement plaster 1. 1:2 (1 cement: 2 fine sand) [Through Rate] | 58 | Sqm | 121 | ₹7,018 |
| 7 | [11.5.1]12 mm cement plaster of mix : 1. 1:2 (1 cement: 2 fine sand) [Through Rate] | 24 | Sqm | 139 | ₹3,336 |
| 8 | [11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate] | 40.82 | Sqm | 113 | ₹4,612.66 |
| 9 | [11.52]Cement rendering on plaster 1 mm thick [Through Rate] | 24 | Sqm | 28 | ₹672 |
| 10 | [11.58]Providing and applying two coats white cement based putty of approved brand and manufacturer, over plastered surface and grinding the surface smooth with sand paper to get en even and smooth finish including cost and carriage of all material , labour charges, scaffolding, sundries etc. complete [Through Rate] | 57.83 | Sqm | 32 | ₹1,850.56 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_555497.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .