| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance | -22.86% | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹16.3 L (14.5%)Admitted-Finance | -11.71% | ₹1.3 Cr+₹16.3 L (14.5%) | L2 | Admitted-Finance |
| 3 | L3₹1.4 Cr+₹27.5 L (24.3%)Admitted-Finance | -4.10% | ₹1.4 Cr+₹27.5 L (24.3%) | L3 | Admitted-Finance |
| 4 | L4₹1.4 Cr+₹31.6 L (28.0%)Admitted-Finance | -1.27% | ₹1.4 Cr+₹31.6 L (28.0%) | L4 | Admitted-Finance |
Tender Value
₹1.5 Cr
EMD Value
₹2.9 L
Closing Date
27 May 2026, 6:00 pmClosed
SE PWD CIRCLE JHALAWAR
SE PWD CIRCLE JHALAWAR
Construction of a concrete road from Mishroli to Patidar Mohalla on SH-19A, from Mahatma Gandhi School to Dag Road via Annapurna Mataji Temple, and from GSS School to Meghwal Mohalla.
2026_CEPWD_557165_1
SE PWD CIRCLE JHALAWAR NITNO-02/2026-27
Open Tender
Civil Works
Percentage
120 days
JHALAWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
2000 EE PWD DIV. BHAWANIMANDI
₹2.9 L
Yes
3 Jun 2026
8 May 2026
29 May 2026
8 May 2026
27 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Cement Concrete Pavements as per MoRTH Specification Clause 202. Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 82.5 | Cum | - | - |
| 2 | Dry Lean Cement Concrete Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a fully automatic computerised batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 1,007.63 | Cum. | - | - |
| 3 | Construction of un-reinforced , plain cement concrete pavement M-40 (Grade), thickness as per design, over a prepared sub base, with 43/53 grade cement as per Clause 602, coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 31.5 mm, mixed in a in fully Automatic Computerised Batching Plant compatible with Printer and Pen Drive and transported to site in transit mixer for having continuous agitated mixer, manufactured as per approved mix design including pumping of R.M.C. from transit mixer to site of laying , with all lead and lift including cost of admixtures in recommended portion as per IS 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer in charge laid with a Fixed Form Paver (laying and fixing of 150 micron thick polythene Film and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using water finishing to lines and grade as per drawing and MoRTH Specification Clause 602 with all required equipments (Dowel Bars and Tie Bars will be
paid seprately). | 1,813.46 | P.Cum. | - | - |
| 4 | Providing and Fixing of Dowel Bars and Tie Bars of Mild Steel confirming to IS : 432 of specified length and diameters as per MoRTH Specification IRC 15 & 58 including cutting, placing in position across transverse joint with proper spacing, providing with PVC sleeve complete as per drawing, technical specification and as per direction of the Engineer-in-charge. | 5,484.33 | P.Kg. | - | - |
| 5 | Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and MoRTH Specification Clause 801 Ordinary Kilometer Stone (Precast) | 2 | Each | - | - |
| 6 | Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and MoRTH Specification Clause 801200 m stone (precast) | 6 | Each | - | - |
| 7 | Providing and erecting a "W" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 70 cm above road/ ground level, fixed on CRC rolled channel vertical post, 150 x 75 x 5 mm spaced 2 mm centre to centre,
1.8 m high, 1.1 m below ground / road level, all steel parts and fitments to be galvanized by hot dip process, all fittings to conform to IS: 1367 and IS: 1364 , metal beam rail to be fixed on the vertical post with a spacer of channel section 150 x 75 x 5 mm, 330 mm long complete as per MoRTH specification Clause 811.3. | 100 | P.Rmt. | - | - |
| 8 | High Abgasion Resistance Interlocking Concrete Block Pavement with M-30 Grade 0.30 Mtr x 0.30 Mtr x 0.15 Mtr Edge Blocks (measurements shall be made inner to inner side of edge blocks) Providing and Laying of Interlocking M-30 grade Concrete Block Pavements having thickness 80 mm as per drawings and as per IS 15658:2006.and all materials shall conform to MoRTH Specification Clause 602 with M-30 Grade 0.30 Mtr x 0.30 Mtr x 0.15 Mtr Edge Blocks. Category 'B' : Dentated only two side like I,Z,T shape as per IRC:SP:63-2004 | 905 | Sqm | - | - |
| 9 | Add extra for Providing M-40 grade concrete Interlocking Blocks in place of M-30 grade. 80mm thick Blocks | 905 | Sqm | - | - |
| 10 | Excavation for Structures Earthwork in excavation for structures as per drawing and MoRTH specifications Clause 304.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Upto 3 m depth | 357.79 | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
Tendernotice_2.pdf
PDF • 1.39 MB
Tendernotice_3.pdf
PDF • 11.56 MB
BOQ_991871.xls
BOQ • 0.27 MB
RATE-ANALYSIS-03.rar
PDF • 3.26 MB
CERTIFICATE-03.pdf
PDF • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .