Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 LAccepted-AOC 6 KRIPANATH DUTTA ROAD KOLKATA 700 002 | KOLKATA | KOLKATA | WEST BENGAL | 700002 | L1 | Accepted-AOC L1 | |
| 2 | L2₹12.0 L+₹14,962 (1.26%)Rejected-Finance 17 1 ABHOY HALDER LANE KOLKATA | KOLKATA | L2 | Rejected-Finance Higher than L1 | |
| 3 | L3₹12.1 L+₹24,449 (2.06%)Rejected-Finance 138 CANNING STREET GROUND FLOOR KOLKATA | KOLKATA | WEST BENGAL | L3 | Rejected-Finance Higher than L1 |
| Sl No | Description | Qty | Unit | B T PROJECTS PRIVATE LIMITED L1 | WEST BENGAL ENGINEERING CO. L3 | ORIENTAL ENGINEERING CO. L2 |
|---|---|---|---|---|---|---|
| 1.00 | Operation and maintenance of the entire Gaseous Chlorination Plant at GLR-3 ( Mograhat-1 Block) Falta Mathurapur Mega Project under supervision of gas plant supervisor round the clock by engaging skilled and unskilled personal per shift along with supply of sundry. The cost includes the visit charges of gas plant supervisor for each visit in every 15 days as and when required in a month along with expert technician for servicing (including latest ESI & EPF) with effect from 01-07-2026 to 28-02-2027 | 8 | Months | 49,059 ₹3,92,472 Lowest | 49,900 ₹3,99,200 | 49,750 ₹3,98,000 |
| 2.00 | Carrying charges of empty chlorine tonner from working site to any authorised filling station for filling liquid chlorine including loading unloading and detention charges for vehicle. [1trip shall carry 2 to 4 nos tonersl | 6 | Trip | 9,720 ₹58,320 Lowest | 10,000 ₹60,000 | 9,900 ₹59,400 |
| 3.00 | Filling charges of liquid chlorine to the empty toner of 900 Kg each capacity from Durgapur Chemicals/authorised filling station for 12 nos x 900kg each= Mt | 10.8 | M.T | 40,810 ₹4,40,748 Lowest | 41,300 ₹4,46,040 | 41,000 ₹4,42,800 |
| 4.00 | Carrying charges of refilled chlorine tonner of each capacity 900 Kg fromany authorised filling station to working site including loading unloading and detention charges for vehicle. [1trip shall carry 2 to 4nos tonersl | 6 | Trip | 9,720 ₹58,320 Lowest | 10,000 ₹60,000 | 9,900 ₹59,400 |
| 5.00 | Testing of empty toner before filling as per ISS if required | 6 | Nos | 4,715 ₹28,290 Lowest | 5,200 ₹31,200 | 5,000 ₹30,000 |
| 6.00 | Charges for replacement of cylinder valve, cylinder nut, cylinder spindle, cylindrical cap and cylinder washer if required including painting complete as per direction of the EIC. | 6 | Nos | 4,595 ₹27,570 Lowest | 5,000 ₹30,000 | 4,800 ₹28,800 |
| 7.00 | Add GST @ 18% | 1 | Item | 1,81,029.6 ₹1,81,029.6 Lowest | 1,84,759.2 ₹1,84,759.2 | 1,83,312 ₹1,83,312 |
Tender Value
Refer Docs
EMD Value
₹25,200
Closing Date
22 Jun 2026, 2:00 pmClosed
Executive Engineer SMD PHE Dte
Chetla
Operation, maintenance of Gaseous Chlorination including Supply, Delivery and carrying of liquid chlorine gas tonners for GLR-3 Mograhat-I under Falta Mathurapur Mega Surface based water supply project in South 24 Parganas District under SMD PHE Dte
2026_PHED_1026093_3
WBPHE/EE/SMD/NIeT-03 of 2026-27
Open Tender
Miscellaneous Works
Item Rate
243 days
Falta Mathurapur
Please refer Tender documents.
6 documents required · 6 mandatory
₹25,200
10 Jul 2026
4 Jun 2026
24 Jun 2026
4 Jun 2026
22 Jun 2026
4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation and maintenance of the entire Gaseous Chlorination Plant at GLR-3 ( Mograhat-1 Block) Falta Mathurapur Mega Project under supervision of gas plant supervisor round the clock by engaging skilled and unskilled personal per shift along with supply of sundry. The cost includes the visit charges of gas plant supervisor for each visit in every 15 days as and when required in a month along with expert technician for servicing (including latest ESI & EPF) with effect from 01-07-2026 to 28-02-2027 | - | Months | - | - |
| 2 | Carrying charges of empty chlorine tonner from working site to any authorised filling station for filling liquid chlorine including loading unloading and detention charges for vehicle. [1trip shall carry 2 to 4 nos tonersl | - | Trip | - | - |
| 3 | Filling charges of liquid chlorine to the empty toner of 900 Kg each capacity from Durgapur Chemicals/authorised filling station for 12 nos x 900kg each= Mt | - | M.T | - | - |
| 4 | Carrying charges of refilled chlorine tonner of each capacity 900 Kg fromany authorised filling station to working site including loading unloading and detention charges for vehicle. [1trip shall carry 2 to 4nos tonersl | - | Trip | - | - |
| 5 | Testing of empty toner before filling as per ISS if required | - | Nos | - | - |
| 6 | Charges for replacement of cylinder valve, cylinder nut, cylinder spindle, cylindrical cap and cylinder washer if required including painting complete as per direction of the EIC. | - | Nos | - | - |
| 7 | Add GST @ 18% | - | Item | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Tendernotice_2.pdf
PDF • 0.06 MB
Tendernotice_3.pdf
PDF • 0.23 MB
BOQ_2521825.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .