EXECUTIVE OFFICER
NAGARPALIKA SRIVIJAYNAGAR
Construction/Repair of Crossing at Various Places Ward No 01-25 at Nagarpalika Sri Vijaynagar
2026_DLB_580787_1
NPSBNR/2026-27/2331
Open Tender
Civil Works
Percentage
120 days
SRIVIJAYNAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
E.O. NAGARPALIKA / MD RISL
₹45,480
Yes
13 Aug 2026
1 Aug 2026
7 Aug 2026
1 Aug 2026
7 Aug 2026
1 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation in foundation trenches etc.including dressing of sides and ramming of bottoms including getting out the excavated material ,refilling after laying pipe /foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of engineer for following depths below natural ground /road top level.in all type soils/saturated soil such as moorum sand,sandy silt,clay,black cotton soil ,kankar etc depth upto 1.5m. | - | cum | - | - |
| 2 | Providing and laying in position cement concrete of specified grade
excluding the cost of centring and shuttering - All work upto plinth
level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40
mm nominal size). | - | cum | - | - |
| 3 | Brick work with FPS bricks of class designation 75 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | - | cum | - | - |
| 4 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 15 mm cement plaster on the rough side of single or half brick wall of mix : including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar (A)1:4 (1 cement : 4 fine/ coarse sand) | - | sqm | - | - |
| 5 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded 20mm nominal size stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 40mm thick | - | sqm | - | - |
| 6 | Steel work welded in built up sections/ framed work including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | - | kg | - | - |
| 7 | Providing and laying in position specified grade of reinforced cement
concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level :1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | - | - |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -all work upto plinth level.1:11/2:3(1 cement :1 1/2 coarse sand :3 graded stone aggregate 20mm nominal size. | - | cum | - | - |
| 9 | Reinforcement for R.C.C. work at all levels including straightening,
cutting, bending, placing in position and binding all complete.
Cold twisted bars | - | kg | 1 | - |
| 10 | Providing sand stone slab for roofing and laying them in cement mortar 1 : 4 (1 cement : 4 coarse sand) over wooden karries or R.C.C. battens (Karries and battens to be paid separately) including pointing the ceiling joints with cement mortar 1:3 (1 cement : 3 fine
sand ) complete :
Red sand stone slab 40 to 50 mm thick | - | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_1031985.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .