Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹3.6 LAccepted-Finance | ₹3.6 L | H1 | Accepted-Finance ok |
| 2 | H2₹3.2 LAccepted-Finance | ₹3.2 L | H2 | Accepted-Finance ok |
| 3 | H3₹3.2 LAccepted-Finance | ₹3.2 L | H3 | Accepted-Finance ok |
| Sl No | Description | Qty | Unit | SUNDER CONSTRUCTION H3 | Mahendra Kumar Bhika Ram H2 | SHIVSHAKTI ENGINEERS H1 |
|---|---|---|---|---|---|---|
| 1.00 | Sewer by passing machinery set comprising of self priming sewage suction- pump, flexible suction and delivery line, DG set, and other necessary equipments with operator diesel lubricants, barricading area etc and expense of to and fro carriage | 1 | hour | 1,600 ₹1,600 | 1,540 ₹1,540 | 1,585 ₹1,585 |
| 2.00 | Dismantling of flexible pavements for sewer line and manholes and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task: Bituminous courses | 1 | cum | 500 ₹500 | 502.4 ₹502.40 | 532 ₹532 |
| 3.00 | Dismantling of flexible pavements for sewer line and manholes and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task: Granular courses | 1 | Cum | 350 ₹350 | 340 ₹340 | 370 ₹370 |
| 4.00 | Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer Cement Concrete Grade M-15 and above and PCC blocks | 1 | Cum | 660 ₹660 | 640 ₹640 | 675 ₹675 |
| 5.00 | Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.: Depth upto 1.5 m | 1 | cum | 200 ₹200 | 240 ₹240 | 295 ₹295 |
| 6.00 | Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.: Add extra for overall depth of excavation above 1.5 m and upto 3.0 m | 1 | Cum | 15 ₹15 | 19.4 ₹19.40 | 20.1 ₹20.10 |
| 7.00 | Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.:Add extra for overall depth of excavation above 3.0 m and upto 4.5 m | 1 | Cum | 30 ₹30 | 45.4 ₹45.40 | 47.2 ₹47.20 |
| 8.00 | Providing and fixing CLOSE timbering in trenches of sewer line and manholes including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered) for following depth below NGL.: Depth upto 3.0 m | 1 | Sqm | 130 ₹130 | 140 ₹140 | 141.5 ₹141.50 |
| 9.00 | Providing and fixing CLOSE timbering in trenches of sewer line and manholes including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered) for following depth below NGL.: Depth more than 3.0 m and upto 6.0 m | 1 | Sqm | 140 ₹140 | 141.4 ₹141.40 | 143 ₹143 |
| 10.00 | Providing and fixing OPEN timbering in trenches of sewer line and manholes including strutting, shoring and packing cavities (wherever required) complete for following depth below NGL:Depth upto 3.0 m | 1 | Sqm | 70 ₹70 | 70.4 ₹70.40 | 71.5 ₹71.50 |
Updated dates
Tender Value
₹75 L
EMD Value
₹1.5 L
Closing Date
12 Jan 2026, 9:00 amClosed
COMMISSIONER MUNICIPAL CORPORATION PALI
Municipal Corporation Pali
Operation and maintenance of Sewer Network
2026_DLB_525054_1
NIT05
Open Tender
Civil Works
365 days
PALI
DD For tender cost , EMD, MD RISL
2 documents required · 2 mandatory
₹2,000
Yes
COMMISSIONER MUNICIPAL CORPORATION PALI
₹1.5 L
Yes
28 Jan 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
12 Jan 2026
5 Jan 2026
Sewer by passing machinery set comprising of self priming sewage suction- pump, flexible suction and delivery line, DG set, and other necessary equipments with operator diesel lubricants, barricading area etc and expense of to and fro carriage
Dismantling of flexible pavements for sewer line and manholes and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task: Bituminous courses
Dismantling of flexible pavements for sewer line and manholes and disposal of dismantled materials up to a lead of 50 metres as directed by Engineer including allowances for any additional dismantling beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task: Granular courses
Dismantling of existing structures like culverts, bridges, retaining walls, CC road and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 50 metres as directed by Engineer Cement Concrete Grade M-15 and above and PCC blocks
Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.: Depth upto 1.5 m
Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.: Add extra for overall depth of excavation above 1.5 m and upto 3.0 m
Earth work for Sewer line and Manhole in excavation in foundation, trenches manholes, road side chambers etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level including allowances for any additional excavation beyond the drawings (measurement for payment to be as per standard drawings), re-handling of material/earth to complete the task In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc.:Add extra for overall depth of excavation above 3.0 m and upto 4.5 m
Providing and fixing CLOSE timbering in trenches of sewer line and manholes including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered) for following depth below NGL.: Depth upto 3.0 m
Providing and fixing CLOSE timbering in trenches of sewer line and manholes including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered) for following depth below NGL.: Depth more than 3.0 m and upto 6.0 m
Providing and fixing OPEN timbering in trenches of sewer line and manholes including strutting, shoring and packing cavities (wherever required) complete for following depth below NGL:Depth upto 3.0 m
Providing and fixing OPEN timbering in trenches of sewer line and manholes including strutting, shoring and packing cavities (wherever required) complete for following depth below NGL:Depth more than 3.0 m and upto 6.0
Providing and laying un-reinforced, plain cement concrete mix in pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant, transported to site, laid spread, compacted and finished in a continuous operation including provision of contraction, expansion, admixtures as approved, curing compound, finishing to lines and grades complete as per drawing and as per clause 602, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion for road restoration under sewer line and manhole work including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task: cement concrete 1:3:6
Providing and laying un-reinforced, plain cement concrete mix in pavement over a prepared sub base with 43 grade cement, coarse and fine aggregate conforming to IS: 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant, transported to site, laid spread, compacted and finished in a continuous operation including provision of contraction, expansion, admixtures as approved, curing compound, finishing to lines and grades complete as per drawing and as per clause 602, 112 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion for road restoration under sewer line and manhole work including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task: cement concrete 1:4:8
Providing and laying in position cement concrete of specified grade over a prepared base course complete including finishing, curing all material, labour, machinery, lighting, guarding for road restoration under sewer line and manhole work using RMC (ready mix concrete plant) and Transit mixer including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e.125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar: PCC/ RCC Grade M -20
Providing and laying in position cement concrete of specified grade over a prepared base course complete including finishing, curing all material, labour, machinery, lighting, guarding for road restoration under sewer line and manhole work using RMC (ready mix concrete plant) and Transit mixer including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e.125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar: PCC/ RCC Grade M -25
Providing laying, spreading and compacting stone aggregates of specific sizes as per Table 400-7 to Water Bound Macadam specification including spreading in uniform thickness; hand packing, rolling with power roller 8-10 tonnes, in stages to proper grade and camber, applying and brooming requisite type of screening (Table 400-8) binding materials to fill up the interstices of coarse aggregates, watering (with water browser) and compacting to required density, making necessary earthen bund to protect edges as per clause 404 of MoRT&H specification including all material, labour, machinery, lighting, guarding and maintenance of diversion under sewer line and manhole work complete including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task Crusher broken - Grade-III (53-22.4mm)
Providing and applying tack coat on the prepared surface with bitumen emulsion as per IS: 8887 and approved quality @ 0.2 kg/sqm with the help of spray set fitted on bitumen Container (boiler) after cleaning the surface with brooms or soft brushes and finally dusting with old gunny bags and compressed air to receive bituminous treatment complete as per clause 502 of MoRT&H specification including all material, labour, machinery, lighting, guarding under sewer line and manhole work including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task
Providing and laying open graded premix carpet 20mm thick (compacted), on prepared surface in a single course as wearing course, composed of specified graded crushed stone aggregate as per Table 500-23, premixed with bituminous binder @ 14.60 kg/ 10sqm (including Cost of anti-stripping compound Minimum 1% in Lime/Cement as per design wherever required), including loading of material with F.E. loader, hot mixing of stone aggregate and bitumen in computerised hot mix plant, transporting the mixed material by tippers to paver and laying with paver finisher fitted with electronic sensor control to the required level and grade, compacting smooth wheeled roller 8- 10 tonne capacity and finishing to required level to achieve the desired density as per clause 511 of MoRT&H specification including all material, labour, machinery, lighting, guarding but excluding cost of tack coat/ seal coat under sewer line and manhole work including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task. With Bitumen VG- grade 30
Providing and applying premixed seal coat Type "B" comprising of thin application of fine aggregate 0.06 Cum/ 10 sqm premix with bitumen binder @ 6.8 Kg/ 10 Sqm (including Cost of anti-stripping compound Minimum 1% in Lime/Cement as per design wherever required) laying with paver finisher with electronic sensor control and rolling with power roller 8-10 tonne complete as per clause 513 of MoRT&H specification including all material, labour, machinery, lighting, guarding under sewer line and manhole work including allowances for any additional road restoration beyond the drawings (measurement for payment to be as per standard drawings) to complete the task With Bitumen VG-grade 30
Providing, Fixing and maintaining barricading of active site such as at tanks etc to keep it safe entry from trespassers and unauthorized persons with using 80 - 100 mm dia Wooden Ballies as vertical post, at least 1.80 m above ground level and at least 60 cm below ground level at a spacing of 2 m and 0.63mm thick GI corrugated sheets for 1.8 m height above ground level for covering the barricading in rows one above another with providing suitable gate arrangement and painting in red and white stripes as per the specifications and directions of the Engineer In-charge with proper fixing arrangements with GI limpet washers nuts and bolts complete in all respect and maintaining it till completion of the work at active site
Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP4 class (with s/s ends) IS: 458 - 2003 (amended up to date) marked and pipes from 300 mm and upto 1800 mm manufactured through vertical / vibrated casting process at all depths with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets, lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as per specification and / or as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable:- 200 mm internal diameter
Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP4 class (with s/s ends) IS: 458 - 2003 (amended up to date) marked and pipes from 300 mm and upto 1800 mm manufactured through vertical / vibrated casting process at all depths with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets, lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as per specification and / or as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable:- 250 mm internal diameter
Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP4 class (with s/s ends) IS: 458 - 2003 (amended up to date) marked and pipes from 300 mm and upto 1800 mm manufactured through vertical / vibrated casting process at all depths with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets, lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as per specification and / or as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable:- 300 mm internal diameter
Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP4 class (with s/s ends) IS: 458 - 2003 (amended up to date) marked and pipes from 300 mm and upto 1800 mm manufactured through vertical / vibrated casting process at all depths with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets, lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as per specification and / or as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable:-350 mm internal diameter
Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP4 class (with s/s ends) IS: 458 - 2003 (amended up to date) marked and pipes from 300 mm and upto 1800 mm manufactured through vertical / vibrated casting process at all depths with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets, lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as per specification and / or as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable:- 400 mm internal diameter
Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP4 class (with s/s ends) IS: 458 - 2003 (amended up to date) marked and pipes from 300 mm and upto 1800 mm manufactured through vertical / vibrated casting process at all depths with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets, lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as per specification and / or as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable:- 900 mm internal diameter
Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP4 class (with s/s ends) IS: 458 - 2003 (amended up to date) marked and pipes from 300 mm and upto 1800 mm manufactured through vertical / vibrated casting process at all depths with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets, lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as per specification and / or as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable:- 1000 mm internal diameter
Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP4 class (with s/s ends) IS: 458 - 2003 (amended up to date) marked and pipes from 300 mm and upto 1800 mm manufactured through vertical / vibrated casting process at all depths with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets, lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as per specification and / or as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable:- 1200 mm internal diameter
Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP4 class (with s/s ends) IS: 458 - 2003 (amended up to date) marked and pipes from 300 mm and upto 1800 mm manufactured through vertical / vibrated casting process at all depths with Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets, lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as per specification and / or as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable:- 1400 mm internal diameter
Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP2 class (with s/s ends IS: 458 - 1988 (amended up to date) marked and manufactured through spun process at all levelswith Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers, Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.450 mm internal diameter
Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP2 class (with s/s ends IS: 458 - 1988 (amended up to date) marked and manufactured through spun process at all levelswith Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers, Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.800 mm internal diameter
Providing at site, lowering & laying in trenches, aligning & jointing of RCC pipes NP2 class (with s/s ends IS: 458 - 1988 (amended up to date) marked and manufactured through spun process at all levelswith Rubber gaskets (EPDM/SBR) for sewer lines as per IS: 5382 (including cost of Rubber gaskets lubricants) as per drawing, sectional hydro testing of the sewer pipe line (including cost and conveyance of water to site for testing) etc., complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers, Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable.900 mm internal diameter
Providing, lowering & laying in trenches, aligning & jointing of IS marked SW pipes (IS: 651:1980 amended up date) at all depths with rubber gaskets (EPDM/ SBR) for sewer lines and laying as per IS:4127:1983 (amended up to date) including cost of Rubber gaskets, lubricants and sectional hydro testing of the sewer pipe line (including the cost and conveyance of water to site for testing) complete in all respect as per specification and the directed of the Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable 200 mm Nominal Dia
Operation & maintenance of sewerage collection & conveyance system (RCC/ HDPE/HDPE DWC pipes) from consumer point to STP complete. (line between property chamber and sewer manhole will not be measured for payment purpose) including cleaning & de-silting of chocked manhole by mechanical means, opening and removal of manholes covers safely , use of jetting / suction machine/ high pressure super sucker Machine or any type of machinery for the clear sewer flow , included all expenditure and expenses required to be incurred Technical , supervisor and labour, Repaired including cost of new material for the machineries , Consumable items ,chemicals , fuels , water and other as per the direction of the engineer incharge
Raising precast circular manhole cover and frame by taking out existing precast frame and cover, providing and fixing precast SFRC circular spacer of required height, re-fixing existing manhole cover frame and cover with cement sand mortar (1:3), including making good the damage, complete as directed by Engineer
Supplying & fixing 560mm dia opening SFRC manhole frame & cover as per IS : 12592-2002 in existing manholes including grouting the frame in PCC M- 15 complete in all respect as directed by the Engineer : HD-20
Supplying & fixing 560mm dia opening SFRC manhole frame & cover as per IS : 12592-2002 in existing manholes including grouting the frame in PCC M- 15 complete in all respect as directed by the Engineer : EHD-35
Locating buried manholes through magnetic tracking process / appropriate technology in all types of soil conditions by the use of universal precision cable & manhole locator including marking the estimated findings on the plan of the area & making recommendations for related work execution location as per the specifications and direction of Engineer
Plugging of the existing sewer line and Manhole with 2 nos. MS sheet 6 mm thick with engle iron frame and braces shutters placed on both the opening pf pipes. The manhole with empty cement (PVC) bags filled up with earth up to suitable depth to avoid leakage of sewage from u/s side to be bypassed, till the desilting work is completed including re-plugging required in case of heavy leakage. The steel shutters and the earth filled PVC cement bags shall be removed after the completion of work and then the manhole shall be de-silted for following sizes of sewers : 300mm-600mm dia
Plugging of the existing sewer line and Manhole with 2 nos. MS sheet 6 mm thick with engle iron frame and braces shutters placed on both the opening pf pipes. The manhole with empty cement (PVC) bags filled up with earth up to suitable depth to avoid leakage of sewage from u/s side to be bypassed, till the desilting work is completed including re-plugging required in case of heavy leakage. The steel shutters and the earth filled PVC cement bags shall be removed after the completion of work and then the manhole shall be de-silted for following sizes of sewers: 700mm dia-900mm dia
Providing granular bedding having width = outer dia of pipe (Bc) +500mm, thickness below pipe = 0.25Bc or 100mm (whichever ishigher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sieve, 20 to 50 % passing through 10mm sieve and 100 % retain on 6.3mm sieve, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing and or as directed by Engineer : 200 mm internal diameter
Providing granular bedding having width = outer dia of pipe (Bc) +500mm, thickness below pipe = 0.25Bc or 100mm (whichever ishigher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sieve, 20 to 50 % passing through 10mm sieve and 100 % retain on 6.3mm sieve, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing and or as directed by Engineer :250 mm internal diameter
Providing granular bedding having width = outer dia of pipe (Bc) +500mm, thickness below pipe = 0.25Bc or 100mm (whichever ishigher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sieve, 20 to 50 % passing through 10mm sieve and 100 % retain on 6.3mm sieve, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing and or as directed by Engineer : 300 mm internal diameter
Providing granular bedding having width = outer dia of pipe (Bc) +500mm, thickness below pipe = 0.25Bc or 100mm (whichever ishigher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sieve, 20 to 50 % passing through 10mm sieve and 100 % retain on 6.3mm sieve, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing and or as directed by Engineer : 350 mm internal diameter
Providing granular bedding having width = outer dia of pipe (Bc) +500mm, thickness below pipe = 0.25Bc or 100mm (whichever ishigher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sieve, 20 to 50 % passing through 10mm sieve and 100 % retain on 6.3mm sieve, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing and or as directed by Engineer : 400 mm internal diameter
Providing granular bedding having width = outer dia of pipe (Bc) +500mm, thickness below pipe = 0.25Bc or 100mm (whichever ishigher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sieve, 20 to 50 % passing through 10mm sieve and 100 % retain on 6.3mm sieve, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing and or as directed by Engineer : 450 mm internal diameter
Providing granular bedding having width = outer dia of pipe (Bc) +500mm, thickness below pipe = 0.25Bc or 100mm (whichever ishigher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sieve, 20 to 50 % passing through 10mm sieve and 100 % retain on 6.3mm sieve, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing and or as directed by Engineer : 900 mm Internal diameter
Providing granular bedding having width = outer dia of pipe (Bc) +500mm, thickness below pipe = 0.25Bc or 100mm (whichever ishigher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sieve, 20 to 50 % passing through 10mm sieve and 100 % retain on 6.3mm sieve, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing and or as directed by Engineer : 1000 mm internal diameter
Providing granular bedding having width = outer dia of pipe (Bc) +500mm, thickness below pipe = 0.25Bc or 100mm (whichever ishigher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sieve, 20 to 50 % passing through 10mm sieve and 100 % retain on 6.3mm sieve, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing and or as directed by Engineer : 1200 mm internal diameter
Providing granular bedding having width = outer dia of pipe (Bc) +500mm, thickness below pipe = 0.25Bc or 100mm (whichever ishigher) and haunching = 0.5Bc, with graded hard crusher broken stone of 100% passing through 20mm sieve, 20 to 50 % passing through 10mm sieve and 100 % retain on 6.3mm sieve, laying in layers of thickness 10/15cm including ramming, consolidation etc complete for all type of pipes of following sizes as per drawing and or as directed by Engineer : 1400 mm internal diameter
Providing Barricading for Trenches using 80 - 100 mm dia Wooden Ballies as vertical post, atleast 1.5m above ground level and atleast 30-45 cm below ground level at a spacing of 3 m. Two rows of PVC Tape (preferably red in colour) strip barricading horizontal strip securely tied by the vertical members. Vertical members shall be painted in red and white colour. Rate is inclusive removal and cleaning of site complete in all respect
Providing and constructing of SEWER-BRICK (As per IS-4885 amended upto date) masonry circular manholes of "Type-A" with internal dia 0.90m and depth upto 1.65m having 230mm thick sewer brick masonry wall in cement sand mortar 1:4, including concreting PCC M-10 grade (1:4:8) for 225mm thick foundation including curing compaction and form work etc complete, PCC M15 for benching and channel portion, RCC M20 for 200mm thick cover slab including reinforcement, PCC M20 for fixing the manhole frame and cover using stone aggregate 20mm nominal size, 20mm thick inside and outside plaster in C. M. 1:3, inside plaster finished with floating coat of neat cement, vata in CM1:1 around pipe entering and leaving the manhole and also at the junction of masonry and concrete slab, providing and fixing of SFRC foot steps of approved make at every 0.30m height fixed in CM 1:3, supplying and fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I and II) having clear opening of 560mm, including refilling of Jhiri, including curing, watering, ramming, hydro testing of manhole, conveyance & cost of water, and dewatering complete as directed by the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately. Manhole "Type-A" of depth 0.90 m
Providing and constructing of SEWER-BRICK (As per IS-4885 amended upto date) masonry circular manholes of "Type-A" with internal dia 0.90m and depth upto 1.65m having 230mm thick sewer brick masonry wall in cement sand mortar 1:4, including concreting PCC M-10 grade (1:4:8) for 225mm thick foundation including curing compaction and form work etc complete, PCC M15 for benching and channel portion, RCC M20 for 200mm thick cover slab including reinforcement, PCC M20 for fixing the manhole frame and cover using stone aggregate 20mm nominal size, 20mm thick inside and outside plaster in C. M. 1:3, inside plaster finished with floating coat of neat cement, vata in CM1:1 around pipe entering and leaving the manhole and also at the junction of masonry and concrete slab, providing and fixing of SFRC foot steps of approved make at every 0.30m height fixed in CM 1:3, supplying and fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I and II) having clear opening of 560mm, including refilling of Jhiri, including curing, watering, ramming, hydro testing of manhole, conveyance & cost of water, and dewatering complete as directed by the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately. Manhole "Type-A" of depth 0.90 mProviding and constructing extra depth of manhole "Type-A" for depth beyond 0.90 m and upto 1.65 m with SEWER-BRICK masonry including 20mm plaster inside and outside as per drawing and direction of Engineer
Providing and constructing of SEWER-BRICK (As per IS-4885 amended upto date) masonry circular manholes of "Type-B" with internal dia 1.20m and depth upto 2.50m having sewer brick masonry wall 230mm thick upto 1.5m, 345mm thick from 1.50m to 2.50m in cement sand mortar 1:4, including concreting PCC M-10 grade (1:4:8) for 225mm thick foundation including curing compaction and form work etc complete, PCC M15 for benching and channel portion, RCC M20 for 200mm thick cover slab including reinforcement, PCC M20 for fixing the manhole frame and cover using stone aggregate 20mm nominal size, 20mm thick inside and outside plaster in C. M. 1:3, inside plaster finished with floating coat of neat cement, vata in CM1:1 around pipe entering and leaving the manhole and also at the junction of masonry and concrete slab, providing and fixing of SFRC foot steps of approved make at every 0.30m height fixed in CM 1:3, supplying and fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I and II) having clear opening of 560mm, including refilling of Jhiri, including curing, watering, ramming, hydro testing of manhole, conveyance & cost of water, and dewatering complete as directed by the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately
Providing and constructing of SEWER-BRICK (As per IS-4885 amended upto date) masonry circular manholes of "Type-B" with internal dia 1.20m and depth upto 2.50m having sewer brick masonry wall 230mm thick upto 1.5m, 345mm thick from 1.50m to 2.50m in cement sand mortar 1:4, including concreting PCC M-10 grade (1:4:8) for 225mm thick foundation including curing compaction and form work etc complete, PCC M15 for benching and channel portion, RCC M20 for 200mm thick cover slab including reinforcement, PCC M20 for fixing the manhole frame and cover using stone aggregate 20mm nominal size, 20mm thick inside and outside plaster in C. M. 1:3, inside plaster finished with floating coat of neat cement, vata in CM1:1 around pipe entering and leaving the manhole and also at the junction of masonry and concrete slab, providing and fixing of SFRC foot steps of approved make at every 0.30m height fixed in CM 1:3, supplying and fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I and II) having clear opening of 560mm, including refilling of Jhiri, including curing, watering, ramming, hydro testing of manhole, conveyance & cost of water, and dewatering complete as directed by the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separatelyProviding and constructing extra depth of manhole "Type-B" for depth beyond 1.70 m and upto 2.50 m with SEWER-BRICK masonry including 20mm plaster inside and outside as per drawing and direction of Engineer
Providing and constructing of RR stone masonry circular manholes of "Type- B" with internal dia 1.20m and depth upto 2.50m having RR stone masonry wall 300 thick upto 1.5m, 450mm thick from 1.50m to 2.50m in cement sand mortar 1:4, including concreting PCC M-10 grade (1:4:8) for 225mm thick foundation including curing compaction and form work etc complete, PCC M15 for benching and channel portion, RCC M20 for 200mm thick cover slab including reinforcement, PCC M20 for fixing the manhole frame and cover using stone aggregate 20mm nominal size, 20mm thick inside and outside plaster in C. M. 1:3, inside plaster finished with floating coat of neat cement, vata in CM1:1 around pipe entering and leaving the manhole and also at the junction of masonry and concrete slab, providing and fixing of SFRC foot steps of approved make at every 0.30m height fixed in CM 1:3, supplying and fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I and II) having clear opening of 560mm, including refilling of Jhiri, including curing, watering, ramming, hydro testing of manhole, conveyance & cost of water, and dewatering complete as directed by the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately. Manhole "Type-B" of depth 1.70 m
Providing and constructing of RR stone masonry circular manholes of "Type- B" with internal dia 1.20m and depth upto 2.50m having RR stone masonry wall 300 thick upto 1.5m, 450mm thick from 1.50m to 2.50m in cement sand mortar 1:4, including concreting PCC M-10 grade (1:4:8) for 225mm thick foundation including curing compaction and form work etc complete, PCC M15 for benching and channel portion, RCC M20 for 200mm thick cover slab including reinforcement, PCC M20 for fixing the manhole frame and cover using stone aggregate 20mm nominal size, 20mm thick inside and outside plaster in C. M. 1:3, inside plaster finished with floating coat of neat cement, vata in CM1:1 around pipe entering and leaving the manhole and also at the junction of masonry and concrete slab, providing and fixing of SFRC foot steps of approved make at every 0.30m height fixed in CM 1:3, supplying and fixing heavy duty SFRC manhole frame and cover as per IS 12592 (Part I and II) having clear opening of 560mm, including refilling of Jhiri, including curing, watering, ramming, hydro testing of manhole, conveyance & cost of water, and dewatering complete as directed by the Engineer. Note:- Excavation of earth work and road cutting for manhole will be measured and paid separately. Manhole "Type-B" of depth 1.70 mProviding and constructing extra depth of manhole "Type-B" for depth beyond 1.70 m and upto 2.50 m with RR stone masonry including 20mm plaster inside and outside as per drawing and direction of Engineer
Pre-cast RCC M-40 grade circular manhole conical piece with inbuilt cover and frame (height 1.305), cast-in-situ PCC M-10 grade foundation, PCC M15 grade circular wall ID 1.425m, wall thickness 200mm, wall height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm, PCC M15 grade benching and channel portion. Depth of manhole shall be measured from top of manhole cover upto lowest invert of pipe. (Depth includes in the item = height of Conical piece + ID of Sewer pipe + 1 Wall thickness of pipe + increased height of wall (if any) + 50mm)
Pre-cast RCC M-40 grade circular manhole conical piece with inbuilt cover and frame (height 1.305), cast-in-situ PCC M-10 grade foundation, PCC M15 grade circular wall ID 1.425m, wall thickness 200mm, wall height equal to ID of sewer pipe + one wall thickness of pipe + 50 mm, PCC M15 grade benching and channel portion. Depth of manhole shall be measured from top of manhole cover upto lowest invert of pipe. (Depth includes in the item = height of Conical piece + ID of Sewer pipe + 1 Wall thickness of pipe + increased height of wall (if any) + 50mm)Providing and fixing pre-cast RCC M-40 grade circular ring of ID 1.5m, wall thickness 125mm, height 150/225/300/600/900/1200mm for constructing extra depth of manhole beyond depth mentioned in item no-27.0
Supplying & fixing 560mm opening dia SFRC manhole cover as per IS :12592-2002 in existing manholes frame complete in all respect as directed by the Engineer : HD-20
Supplying & fixing 560mm opening dia SFRC manhole cover as per IS :12592-2002 in existing manholes frame complete in all respect as directed by the Engineer : EHD-35
Providing at site, lowering & laying in trenches, aligning & jointing of PVC-U pipes (SN 8) as per IS 15328 (amended up to date) and as per specifications with rubber rings with socket and spigot joint, (EPDM/SBR) for all depths for pipe length as per drawing and specification including hydraulic field testing (including the cost and conveyance of water to site for testing) and commissioning etc complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable :110 mm Nominal Dia
Providing at site, lowering & laying in trenches, aligning & jointing of PVC-U pipes (SN 8) as per IS 15328 (amended up to date) and as per specifications with rubber rings with socket and spigot joint, (EPDM/SBR) for all depths for pipe length as per drawing and specification including hydraulic field testing (including the cost and conveyance of water to site for testing) and commissioning etc complete as directed by Engineer. Note : E/w to be measured and paid separately. Length of pipe shall be measured in between the outer wall of two manholes / Inspection chambers. Pipe in the manhole/inspection chamber’s wall shall deemed to be included in the item of manhole/inspection chamber shall not be payable : 160 mm Nominal Dia
Constructing providing and fixing of pre-cast RCC M-40 grade circular Road Side Inspection Chamber including earthwork with following dia and depth cylindrical piece with 100mm wall thickness, inbuilt 100mm thick base slab, inbuilt cover & frame on top, provision for 110mm OD in and out sewer connection with making proper inbuilt benching and channel with PCC M-15 grade including providing cast-in-situ 100mm thick base foundation of PCC M-10 grade, supplying and fixing circular precast SFRC Circular 300 / 450 mm dia manhole cover with frame MD-10 (as per IS-12592 amended upto date), including steel reinforcement minimum @ 80kg/cum, testing for water tightness complete in all respect as per drawing, specification and the direction of the EngineerPre-cast Road side inspection chamber of 300mm dia (internal), 450mm depth and 600mm dia base foundation
Constructing providing and fixing of pre-cast RCC M-40 grade circular Road Side Inspection Chamber including earthwork with following dia and depth cylindrical piece with 100mm wall thickness, inbuilt 100mm thick base slab, inbuilt cover & frame on top, provision for 110mm OD in and out sewer connection with making proper inbuilt benching and channel with PCC M-15 grade including providing cast-in-situ 100mm thick base foundation of PCC M-10 grade, supplying and fixing circular precast SFRC Circular 300 / 450 mm dia manhole cover with frame MD-10 (as per IS-12592 amended upto date), including steel reinforcement minimum @ 80kg/cum, testing for water tightness complete in all respect as per drawing, specification and the direction of the Engineer Pre-cast Road side inspection chamber of 450mm dia (internal), 600mm depth and 750mm dia base foundation
Providing and making connection to the manhole/ road side chamber/ property chamber by cutting hole in wall, making good the same with brick work/ stone masonry work in cement mortar 1:4, plaster in cement mortar 1:3, encasement of pipe at manhole with 75mm thick M15 grade concrete etc complete as directed by Engineer.
Providing PVC-U pipes as per IS 15328 drop connection externally for depth from 0.60 m and upto 1.0 m drop from branch sewer line to main sewer manhole or vice versa including inspection and cleaning eye, PVC-U drop pipe and bend encased around with cement concrete M15 with all form work, cutting holes in walls and making good with brick/ stone masonry work in cement sand mortar 1:4 plastered with cement sand mortar 1:3 with stiff cement mortar 1:1 around PVC-U pipe in masonry wall, making required channels complete as per standard design and specifications and/ or as the directed of the Engineer: 200mm dia
Construction of House Sewer Connection inside and outside of a dwelling properties to connect all the outlets of Kitchen, Bath, toilet/WC of the property to existing inspection chamber of Sewer Network, which includes Door-to-door survey of allproperties to be connected with Sewer Network, Preparation of sketch / drawing of arrangement for each house with all the details and obtain approval from Engineer In-charge or his representative and Preparation of as built drawing (Layout plan) in AutoCAD for each property / dwelling connection with sewer network up to manhole. Including Dismantling of all type of flooring and roads, i.e. BT/CC/WMM/interlocking block etc with mechanical cutter. Including Required Excavation of pipe trench/chamber in all type of strata of specified width up to all depth, Providing, laying, jointing and aligning of PVC-U pipes (SN-8) as per 15328 (amended up to date) / HDPE DWC (double wall corrugated) pipes of SN-8 grade as per IS 16098 (amended up to date)/ SWR Pipes with required PVC/ DWC/SWR fittings with required level & location in buried position over bedding of 50 mm thick M-10 grade and in open position aboveground/floor with an encasing of pipe 50 mm cover at 3 sides with M10 grade concrete, Providing, laying, jointing and aligning 160 mm dia PVC-U pipes (SN-8) as per IS15328 (Amended up to date) providing as sleeve to 110 mm dia PVC-U pipes / HDPE DWC (double wall corrugated) pipes (exposed to atmosphere) for crossing open drains, demolishing, If required and reconstruction of drain in original position with PCC M-10, Brick work with modular extruded burnt fly ash clay sewer bricks (Conforming to IS: 4885 - 1988) in CM 1:4, 12 mm thick plaster in CM 1:3 and Construction of 2 Nos brick masonry chamber of bricks class designation 75 of 115 mm wall thickness in cement mortar 1:4, clear inside dimension 320 x 320 x 550 mm, 50 mm thick base PCC 1:3:6, providing & fixing 350 x 350 mm RCC precast cover with frame of LD-2.5, earth filling in gaps, finishing with PCC 1:3:6 inside the chamber, Chamber-1 with square mouth S.W. gulley trap P-type of size 100 x 100 mm as per IS 651: 1992 (amended up to date) with CI grating, in slope around the mouth of Gulley Trap including provision for fixing of 2 nos. 110 mm dia PVC-U pipe etc. to connect a single inlet after connecting all the outlets of kitchen & bath & outlet of this chamber will connect to Chamber-2 or inspection chamber and the Chamber-2 with a provision for fixing of 2 nos. 110 mm dia PVC-U pipe etc. i.e. a single inlet after connecting all outlets of toilet & WC of premises to exiting Inspection chamber, Emptying of septic tank/soakage well etc. disposing of sludge within a lead of 5 Km and taking out the sewage, Bypass of septic tank/soakage well by providing, laying, jointing of 110 mm dia PVC-U pipes for all length from inlet to outlet, including PVC coupler, MS clamp and dismantling, repairing, making good the holes etc, Making connection with 110 mm dia PVC-U pipe with exiting inspection chamber (including making holes in Inspection Chamber) for pipes coming out from inside property and Chamber 1/2, making and repairing holes with CM in 1:4, repairing of floor and road with CC M-30 grade same as original thickness of floor and road, watering, backfilling, compaction and disposal of all surplus material and sewage etc. to a suitable location with all lead and lift, repairing of underground utilities, if damaged, Complete job to connect a dwelling premises to sewer network including all material, labour, taxes, charges etc. as per Specifications, drawing and directions of Engineer Incharge
Construction of House Sewer Connection inside and outside of a dwelling properties to connect all the outlets of Kitchen, Bath, toilet/WC of the property to existing inspection chamber of Sewer Network, which includes Door-to-door survey of allproperties to be connected with Sewer Network, Preparation of sketch / drawing of arrangement for each house with all the details and obtain approval from Engineer In-charge or his representative and Preparation of as built drawing (Layout plan) in AutoCAD for each property / dwelling connection with sewer network up to manhole. Including Dismantling of all type of flooring and roads, i.e. BT/CC/WMM/interlocking block etc with mechanical cutter. Including Required Excavation of pipe trench/chamber in all type of strata of specified width up to all depth, Providing, laying, jointing and aligning of PVC-U pipes (SN-8) as per 15328 (amended up to date) / HDPE DWC (double wall corrugated) pipes of SN-8 grade as per IS 16098 (amended up to date)/ SWR Pipes with required PVC/ DWC/SWR fittings with required level & location in buried position over bedding of 50 mm thick M-10 grade and in open position aboveground/floor with an encasing of pipe 50 mm cover at 3 sides with M10 grade concrete, Providing, laying, jointing and aligning 160 mm dia PVC-U pipes (SN-8) as per IS15328 (Amended up to date) providing as sleeve to 110 mm dia PVC-U pipes / HDPE DWC (double wall corrugated) pipes (exposed to atmosphere) for crossing open drains, demolishing, If required and reconstruction of drain in original position with PCC M-10, Brick work with modular extruded burnt fly ash clay sewer bricks (Conforming to IS: 4885 - 1988) in CM 1:4, 12 mm thick plaster in CM 1:3 and Construction of 2 Nos brick masonry chamber of bricks class designation 75 of 115 mm wall thickness in cement mortar 1:4, clear inside dimension 320 x 320 x 550 mm, 50 mm thick base PCC 1:3:6, providing & fixing 350 x 350 mm RCC precast cover with frame of LD-2.5, earth filling in gaps, finishing with PCC 1:3:6 inside the chamber, Chamber-1 with square mouth S.W. gulley trap P-type of size 100 x 100 mm as per IS 651: 1992 (amended up to date) with CI grating, in slope around the mouth of Gulley Trap including provision for fixing of 2 nos. 110 mm dia PVC-U pipe etc. to connect a single inlet after connecting all the outlets of kitchen & bath & outlet of this chamber will connect to Chamber-2 or inspection chamber and the Chamber-2 with a provision for fixing of 2 nos. 110 mm dia PVC-U pipe etc. i.e. a single inlet after connecting all outlets of toilet & WC of premises to exiting Inspection chamber, Emptying of septic tank/soakage well etc. disposing of sludge within a lead of 5 Km and taking out the sewage, Bypass of septic tank/soakage well by providing, laying, jointing of 110 mm dia PVC-U pipes for all length from inlet to outlet, including PVC coupler, MS clamp and dismantling, repairing, making good the holes etc, Making connection with 110 mm dia PVC-U pipe with exiting inspection chamber (including making holes in Inspection Chamber) for pipes coming out from inside property and Chamber 1/2, making and repairing holes with CM in 1:4, repairing of floor and road with CC M-30 grade same as original thickness of floor and road, watering, backfilling, compaction and disposal of all surplus material and sewage etc. to a suitable location with all lead and lift, repairing of underground utilities, if damaged, Complete job to connect a dwelling premises to sewer network including all material, labour, taxes, charges etc. as per Specifications, drawing and directions of Engineer Incharge : Length up to 5 m
Construction of House Sewer Connection inside and outside of a dwelling properties to connect all the outlets of Kitchen, Bath, toilet/WC of the property to existing inspection chamber of Sewer Network, which includes Door-to-door survey of allproperties to be connected with Sewer Network, Preparation of sketch / drawing of arrangement for each house with all the details and obtain approval from Engineer In-charge or his representative and Preparation of as built drawing (Layout plan) in AutoCAD for each property / dwelling connection with sewer network up to manhole. Including Dismantling of all type of flooring and roads, i.e. BT/CC/WMM/interlocking block etc with mechanical cutter. Including Required Excavation of pipe trench/chamber in all type of strata of specified width up to all depth, Providing, laying, jointing and aligning of PVC-U pipes (SN-8) as per 15328 (amended up to date) / HDPE DWC (double wall corrugated) pipes of SN-8 grade as per IS 16098 (amended up to date)/ SWR Pipes with required PVC/ DWC/SWR fittings with required level & location in buried position over bedding of 50 mm thick M-10 grade and in open position aboveground/floor with an encasing of pipe 50 mm cover at 3 sides with M10 grade concrete, Providing, laying, jointing and aligning 160 mm dia PVC-U pipes (SN-8) as per IS15328 (Amended up to date) providing as sleeve to 110 mm dia PVC-U pipes / HDPE DWC (double wall corrugated) pipes (exposed to atmosphere) for crossing open drains, demolishing, If required and reconstruction of drain in original position with PCC M-10, Brick work with modular extruded burnt fly ash clay sewer bricks (Conforming to IS: 4885 - 1988) in CM 1:4, 12 mm thick plaster in CM 1:3 and Construction of 2 Nos brick masonry chamber of bricks class designation 75 of 115 mm wall thickness in cement mortar 1:4, clear inside dimension 320 x 320 x 550 mm, 50 mm thick base PCC 1:3:6, providing & fixing 350 x 350 mm RCC precast cover with frame of LD-2.5, earth filling in gaps, finishing with PCC 1:3:6 inside the chamber, Chamber-1 with square mouth S.W. gulley trap P-type of size 100 x 100 mm as per IS 651: 1992 (amended up to date) with CI grating, in slope around the mouth of Gulley Trap including provision for fixing of 2 nos. 110 mm dia PVC-U pipe etc. to connect a single inlet after connecting all the outlets of kitchen & bath & outlet of this chamber will connect to Chamber-2 or inspection chamber and the Chamber-2 with a provision for fixing of 2 nos. 110 mm dia PVC-U pipe etc. i.e. a single inlet after connecting all outlets of toilet & WC of premises to exiting Inspection chamber, Emptying of septic tank/soakage well etc. disposing of sludge within a lead of 5 Km and taking out the sewage, Bypass of septic tank/soakage well by providing, laying, jointing of 110 mm dia PVC-U pipes for all length from inlet to outlet, including PVC coupler, MS clamp and dismantling, repairing, making good the holes etc, Making connection with 110 mm dia PVC-U pipe with exiting inspection chamber (including making holes in Inspection Chamber) for pipes coming out from inside property and Chamber 1/2, making and repairing holes with CM in 1:4, repairing of floor and road with CC M-30 grade same as original thickness of floor and road, watering, backfilling, compaction and disposal of all surplus material and sewage etc. to a suitable location with all lead and lift, repairing of underground utilities, if damaged, Complete job to connect a dwelling premises to sewer network including all material, labour, taxes, charges etc. as per Specifications, drawing and directions of Engineer Incharge : Length more than 5 m and upto 10 m
Raising circular inspection chamber with circular cover 450mm dia and frame slab to required level including dismantling existing slab, taking out the existing CI frame & cover of inspection chamber and raising it upto ground/ road level, refixing of frame and cover in M15 (1:2:4) concrete all around the frame, including making good the damage, form work, curing, complete as directed by Engineer. (Brick/ concrete work of raising depth to the manhole also Included
Brick work with FPS bricks of class designation 75 in foundation and plinth in cement mortar 1:4 ( 1 cement : 4 coarse sand)
Random rubble masonry with hard stone in foundation and plinth cement mortar 1:6 ( 1 cement :6 coarse sand )
Raising circular brick/RR stone masonry manhole with circular opening 560mm dia and frame slab to required level including dismantling existing slab, taking out the existing CI frame & cover of manhole and raising it upto ground/ road level, refixing of frame and cover in M15 (1:2:4) concrete all around the frame, including making good the damage, form work, curing, complete as directed byEngineer. (Brick work / RR stone work of raising depth of manhole to be paid separately)
Lowering of circular brick / RR stone masonry manhole with circular opening 560mm dia and frame slab to required level including dismantling existing slab and manhole wall, taking out the existing CI frame & cover of manhole and lowering it upto ground/ road level, refixing of frame and cover in M15 (1:2:4) concrete all around the frame, including making good the damage, form work, curing, complete as directed by Engineer. (Dismantling of brick work / RR stone work depth of manhole to be paid separately)
Lowering of circular inspection chamber with circular cover 450mm dia and frame slab to required level including dismantling existing slab and inspection chamber wall, taking out the existing CI frame & cover of inspection chamber and lowering it upto ground/ road level, refixing of frame and cover in M15 (1:2:4) concrete all around the frame, including making good the damage, form work, curing, complete as directed by Engineer. Dismantling of brick/ concrete work depth of manhole also Included
Providing and laying damp-proof course with cement concrete grade M-15 (1 : 2 : 4) mortar prepared with 1% solution of water-proof compound complete as per specification . including Providing/mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar : 50 mm thick
Providing and laying damp-proof course with cement concrete grade M-15 (1 : 2 : 4) mortar prepared with 1% solution of water-proof compound complete as per specification . including Providing/mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar : 75 mm thick
Providing and laying damp-proof course with cement concrete grade M-15 (1 : 2 : 4) mortar prepared with 1% solution of water-proof compound complete as per specification . including Providing/mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar : Extra for providing and mixing water proofing material in cement concrete work @ 1 kg per 50 kg of cement
Providing orange colour safety foot rest of minimum 6 mm thick plastic encapsulated as per IS : 10910, on 12 mm dia steel bar conforming to IS: 1786, having minimum cross section as 23 mmx25mm and overall minimum length 263 mm and width as 165 mm with minimum 112 mm space between protruded legs having 2 mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specifications and having manufacture's permanent identification mark to be visible even after fixing, including fixing in manholes while casting in RCC manhole and with 30x20x15 cm cement concrete block 1:3:6 in brick/RR stone manhole complete as per design
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 23.53 MB
BOQ_936992.xls
BOQ • 0.49 MB
Download all tender documents and submit your bid