Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance NO 28 A SUNTHARA VINAYAGAR KOVIL STREET PALAYAPETTAI GANDHI NAGAR POST TIRUNELVELI 627 008 | TIRUNELVELI | TIRUNELVELI | TAMIL NADU | 627008 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹7.3 L
EMD Value
₹6,800
Closing Date
5 Jun 2023, 2:00 pmClosed
SE/TEDC/Tirunelveli
Anna Building, Maharajanagar, Tirunelveli- 627 011.
Improvement of road by laying paver blocks from western side chainage 35m to 152m western side ie rear side portico in the premises of Tirunelveli regional office Thiyagarajanagar
2023_EB_317826_1
SE/TEDC/TIN/ETC- 04/2023-24
Open Tender
Civil Works - Roads
Works
15 days
Tirunelveli
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹6,800
Yes
23 Jun 2023
20 May 2023
6 Jun 2023
20 May 2023
5 Jun 2023
20 May 2023
Amount
Clearing the light jungle for marking the Conferncing hall, stair case, man hole & yard,etc
Earthwork excavation in hard stiff clay, stiff black cotton, hard red earth, shales murram gravel stoney earth and earth mixed with small size boulders and hard gravelly soil for foundation.
Disposal of excavated sand ncluding cost of all materials lead lift curing etc complete.
PCC 1:4:8 mix using 20mm HBG With out form work(machine crushed) metal for foundation including cost of all materials lead lift curing etc complete.
PCC 1:3:6 mix using 20mm HBG With form work(machine crushed) metal for foundation including cost of all materials lead lift curing etc complete.
Plastering with CM 1:5 mix using P.sand, 12mm thick for wall including all cost labour materials lead lift labour curing etc complete.
Picking 5 Cm to 10Cm old metalled surface and sectioning 1 Sqm.
Providing ,laying, spreading and compacting graded stone aggregates for wet mix macadam required thick,including premixing the materials with water at OMC in mechnanical mix plant.conveyancyace of mixed materials by tripper to site,laying in uniform layers using pavers in sub base/base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material,labour charges,rentals for machinery. fuel and all other incidental chargesetc., complete as pr clause 406 of MORTH Rev -5
supplying, filling and leveling with 3mm metal for cushion of paver block complying with standard specification for formation pathway including cost of all materials, leveling, lead, lift etc complete.
supplying, filling and leveling with stone dust for cushion of paver block pathway including cost of all materials, leveling,vibrating, lead, lift etc complete.
Supplying and paving with 80mm thick paver block (Zig zag star )over the 3mm metal complying with standard specification for formation pathway including cost of all materials, leveling, paving, vibrating, lead lift, curing etc complete.
GST 18% as per GOVT norms
ARUMUGAM ASARI
Sp Constructions
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .