| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.8 LAccepted-AOC 293 CHHATARPUR DHANMILLS ROAD NEW DELHI DELHI 110074 | SOUTH DELHI | DELHI | 110074 | L1 | Accepted-AOC L1 BIDDER | |
| 2 | L2₹4.9 L+₹3,200 (0.66%)Rejected-Finance 323 A 2ND FLOOR GROUND FLOOR GROUND FLOOR SANT NAGAR EAST OF KAILASH DELHI DELHI 110065 | SOUTH EAST DELHI | DELHI | 110065 | L2 | Rejected-Finance Non-responsive | |
| 3 | L3₹4.9 L+₹11,475 (2.38%)Rejected-Finance | L3 | Rejected-Finance Non-responsive |
Tender Value
Refer Docs
Closing Date
1 Feb 2021, 12:00 pmClosed
APD BHOPAL
Bid Manager CNS Oo The Airport Director Airports Authority of India, Raja Bhoj Airport, Bhopal
OFC laying for Installation of Aviation Observation System (AWOS) / CWIS at Bhopal Airport.
2021_AAI_66547_1
WR-23012(12)/9/2020-APD-WR -BHOPAL
Open Tender
OFC Laying Works
Works
45 days
RAJA BHOJ AIRPORT BHOPAL
Please refer Tender documents.
19 documents required · 19 mandatory
₹590
Yes
Exempted
22 Jun 2021
13 Jan 2021
2 Feb 2021
13 Jan 2021
1 Feb 2021
13 Jan 2021
13 Jan 2021 - 21 Jan 2021
Amount
Supply of single mode, 12 core, 9/125 mm multi tube armored OFC (Specifications as per Annexure – I)
Supply of 40mm dia. PLB HDPE pipe
PVC Conduit pipe 32mm dia.
CAT6 SFTP
Supply offiber patch cord
Supply of Pigtails
Supply of OFC Termination/Distribution units
6/12 Port Fiber LIU fully loaded as per specification
Fiber Joint Enclosure 12 core
OFC LAYING WORK : Installation of OFC cables through HDPE pipe shall be carried out in one of the three ways as mentioned below and as per Actual site conditions and AAI requirements.
Outdoor laying of OFC through HDPE pipe in existing trench/duct available Laying/pulling of Fiber cable THROUGH 40mm dia. HDPE pipe with wall clamping.
Outdoor laying of HDPE and OFC cable by digging in soft soil and hard soil
HDD shall be preferred to avoid excavation of operational area and soil while crossing the RUNWAY/TAXIWAY and to avoid damage of other services on operational area as well as non-feasibility of manual digging. Vendor shall carry out manual/machine HDD as per length of excavation required. The depth of HDD shall be 1.5 to 5 meter. HDPE pipe shall be laid through HDD and OFC cables shall be pushed later in the pipe.
OFC cables shall be laid underground at a depth of minimum1meter. This shall include excavation of duct, laying of HDPE pipe and putting OFC cables inside, to supply & put half round RCC Hume pipes on top for protection of the cable, refilling of the duct and restoration of site as earlier. Metal route markers shall be installed at every 30 meter.
MANHOLE(Specification)
Pre-cast RCC loop chambers for manhole or inspection chambers of size 60cm X 60cm X 75cm (for underground cables as per requirement) with cover shall be installed at every 100 meters. These chambers shall be visible and easily accessible in the event of any fault. During pulling of OFC cables through HDD route, spare cable loop shall be kept of appropriate length in loop chambers to meet future requirements for maintenance of OFC cables.Vendor shall prepare a manhole installation plan based on site survey prior to duct installation wherever required.Length of looped cable shall be around 5 meter and shall be in the shape of numeral ‘8’ to avoid twisting and kinking during splicing/jointing. The extra cable loop lengths shall be recorded and incorporated in route diagram. Simplex caps shall be installed at the end of ducts through which fiber has been blown. Vendor shall plan the cable blowing operation including preparation of cable drums schedule such that to the extent possible in consent with AAI.
DOCUMENTATION
Fiber termination for fusion splicing complete with splice pack includes Testing of fiber cores with test reports conforming to industry standards.
Testing & certification of Network by vendor and AAI.
Commissioning and Documentation: Vendor /system integrator shall provide all the details of the integrated system regarding physical installation ,cable route on the Grid Map, wiring diagram and system interfaces etc in hard and soft copy.
ATP(Acceptance Test Procedure) document(Approved by AAI) submission.
A S INFOTECH E SOLUTIONS PVT LTD
R R GUPTA STEEL INDUSTRIES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .