Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.2 LAccepted-AOC | ₹3.2 L | 1 | Accepted-AOC Lowest Value Quoted |
| 2 | 2₹3.4 LRejected-Finance | ₹3.4 L | 2 | Rejected-Finance Highest Amount Quoted |
| Sl No | Description | Qty | Unit | P MURUGAN CONTRACTOR L1 | MR.MAHARAJAN, CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.00Water Trough arrangements in cattle santhai at survey no:1484 in Seevalaperi panchayat of palayamkottai panchayat union | |||||
| 2.00 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B for foundation | 19.28 | cum | 263 ₹5,070.64 | 300 ₹5,784 |
| 3.00 | Cement concrete 1:4:8 mix using 40m ISS size HBG metal including all cost and conveyance and all labour charges etc., complete. | 5.88 | cum | 5,297 ₹31,146.36 | 5,300 ₹31,164 |
| 4.00 | Brick work in cm 1:5 mix using country bricks including all cost and conveyance and all labour charges etc., complete. | 2.96 | cum | 6,051 ₹17,910.96 | 6,100 ₹18,056 |
| 5.00 | Ramdom rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance of all materials to site and all albour charges etc complete for 10 cum | 14.78 | cum | 5,666 ₹83,743.48 | 5,700 ₹84,246 |
| 6.00 | Centering charges for all concrete works including all cost and conveyance and all labour charges etc., complete. | 4.28 | sqm | 547 ₹2,341.16 | 600 ₹2,568 |
| 7.00 | Supplying and fabrication of steel including all cost and conveyance and all labour charges for cutting, bending, tieing and placeing in position etc., complete. | 544.08 | kg | 91.8 ₹49,946.54 | 100 ₹54,408 |
| 8.00 | RCC in cm1:1.5:3 mix using 20mm ISS size HBG metal including all cost and conveyance and all labour charges etc., complete. | 3.01 | cum | 8,907 ₹26,810.07 | 8,910 ₹26,819.10 |
| 9.00 | Plastering with CM 1:5 mix 12mm thick including cost and conveyance of all materials etc., complete. | 41.13 | sqm | 281 ₹11,557.53 | 300 ₹12,339 |
| 10.00 | White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete for 100 Sqm | 41.13 | sqm | 39 ₹1,604.07 | 50 ₹2,056.50 |
Tender Value
₹3.9 L
EMD Value
₹3,900
Closing Date
27 Nov 2025, 3:00 pmClosed
Commissioner, Panchayat Union, Palayamkottai.
Commissioner, Panchayat Union, Palayamkottai.
Water trough arrangements in cattle santhai at survey No 1484 in Seevalaperi panchayat GF 2025-26
2025_RDTN_626146_7
A2/3395/2025
Open Tender
Construction Works
120 days
Commissioner, Panchayat Union, Palayamkottai.
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,900
7 Jan 2026
25 Nov 2025
27 Nov 2025
25 Nov 2025
27 Nov 2025
25 Nov 2025
Amount
Water Trough arrangements in cattle santhai at survey no:1484 in Seevalaperi panchayat of palayamkottai panchayat union
Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B for foundation
Cement concrete 1:4:8 mix using 40m ISS size HBG metal including all cost and conveyance and all labour charges etc., complete.
Brick work in cm 1:5 mix using country bricks including all cost and conveyance and all labour charges etc., complete.
Ramdom rubble masonry in cement mortar 1:5 mix with simultaneous pointing including cost and conveyance of all materials to site and all albour charges etc complete for 10 cum
Centering charges for all concrete works including all cost and conveyance and all labour charges etc., complete.
Supplying and fabrication of steel including all cost and conveyance and all labour charges for cutting, bending, tieing and placeing in position etc., complete.
RCC in cm1:1.5:3 mix using 20mm ISS size HBG metal including all cost and conveyance and all labour charges etc., complete.
Plastering with CM 1:5 mix 12mm thick including cost and conveyance of all materials etc., complete.
White washing two coats using shell lime including cost and conveyance of all materials to site and all labour charges etc comoplete for 100 Sqm
Supply and Delievery of 75mm PVC Pipe 4ksc
Earth work excavation with an initital lead and lift in hard stiff clay, black cotton, hard red earth, sub murram gravel, stone and earth mixed boulders as per SS20B
Refilling excavated earth including all cost
Laying of PVC Rigid pipes with lead of 200m lowering into trench, laying in proper grade, alignment, Jointing PVC Coupler with specials and testes to the required pressure inluding conveyance of water upto 1km lead during the testing
MR.MAHARAJAN, CONTRACTOR (BID ID -1521753)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.42 MB
BOQ_748743.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid