| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.7 LAccepted-Finance | ₹21.7 L | L1 | Accepted-Finance Quoted Amount less than estimate |
| 2 | L2₹21.7 LRejected-Finance | ₹21.7 L | L2 | Rejected-Finance Quoted Amount More than estimate |
| Sl No | Description | Qty | Unit | SUGANYA R L1 | LALITHA D L2 |
|---|---|---|---|---|---|
| 1.00Providing WBM Road to Mangal Eri Road at Mangal Panchayat | |||||
| 1.01 | Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete | 1,049.76 | Sqm | 6.1 ₹6,403.54 | 6.36 ₹6,676.47 |
| 1.02 | Collection and supply of Girrty gravel for side berms and labour charges for filling etc complete | 481.14 | Cum | 421.5 ₹2.0 L | 421.9 ₹2.0 L |
| 1.03 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 | 481.14 | Cum | 2,289.09 ₹11.0 L | 2,289.09 ₹11.0 L |
| 1.04 | Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER | 218.7 | Sqm | 2,412.29 ₹5.3 L | 2,412.29 ₹5.3 L |
| 1.05 | Provision for Hectometer stone | 4 | Nos | 574.65 ₹2,298.60 | 574.65 ₹2,298.60 |
| 1.06 | Provision for Kilometer stone | 1 | Nos | 2,197 ₹2,197 | 2,197 ₹2,197 |
| 1.07 | GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 3,31,675 ₹3.3 L | 3,31,759 ₹3.3 L |
Tender Value
₹22 L
EMD Value
₹22,000
Closing Date
5 Mar 2026, 4:00 pmClosed
Block Development office(V.pt), Vembakkam
Block Development office, Vembakkam
Excecution of Village Panchayat Fund 2025-2026 Providing WBM Road to Mangal Eri Road at Mangal Panchayat in Vembakkam Block
2026_RDTN_666940_1
A6/565/2025 Date.08.08.2025
Open Tender
Civil Works - Others
Block Development office, Vembakkam
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹22,000
Yes
16 Mar 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
Providing WBM Road to Mangal Eri Road at Mangal Panchayat
Clearing the scrub jungles including cutting the scrubs and removing away from site etc complete
Collection and supply of Girrty gravel for side berms and labour charges for filling etc complete
Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401
Providing and laying 75mm compacted thick WBM Grade II using 1 cum of 75mm to 22.4mm IRC HBG metal and 0.24 cum of Gravel for blindage for 10 Sqm. of 75mm compacted thick (the blindage material shall have PI value less than 6%) including cost and conveyance of all materials from approved quarry to work site and stacking to departmental gauge for pre-measurement as directed by the departmental officers including labour for spreading metal and gravel hand packing to camber and grade lines blinding with required quantity of gravel, forming edge bunds, watering with all leads for good water slurrying, rolling and consolidation by power roller and finishing as per MOST 404 (III revision) including hire and fuel charges for power roller and water sprinkler and all other tools and plants employed therefor and all incidental charges etc., complete for BOTTOM LAYER
Provision for Hectometer stone
Provision for Kilometer stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. {GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.46 MB
BOQ_801188.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid