Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.5 L+₹85,759.59 (8.90%)Rejected-Finance TUTICORIN | L2 | Rejected-Finance L2 | |
| 3 | L3₹13.3 L+₹3.7 L (38.1%)Rejected-Finance 4 94 M ETTAYAPURAM ROAD TUTICORIN 628002 | NA | NA | 628002 | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | PARVATHI ENTERPRISES L1 | KRISHENGINEERS L2 | SRINITHI ENGINEERING WORKS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Fabrication and Supply of Receiving Chute for BFD10A & 10B with all dimensions and materials as per drawing enclosed.
Material:
Mother Plate : Mild Steel 12mm Thick
Liner Plate : SS 304 Grade 10mm Thick As per Section VII Technical Specification | 9.33 | Sq.mtr | 7,05,965.8 ₹8,33,039.64 Lowest | 7,68,798.16 ₹9,07,181.83 | 8,86,540 ₹10,46,117.2 |
| 2.00 | Erection of Receiving Chute for BFD10A & 10B as per Scope of Work and Special Conditions enclosed. As per Section VII Technical Specification | 9.33 | Sq.mtr | 1,10,584.2 ₹1,30,489.36 Lowest | 1,20,429.46 ₹1,42,106.76 | 2,40,765.6 ₹2,84,103.41 |
Tender Value
Refer Docs
EMD Value
₹7,600
Closing Date
21 Apr 2025, 2:00 pmClosed
CE/TTPS
CE/TTPS Tuticorin
Fabrication Supply and Erection of Receiving Chute for BFD10A and 10B
2025_EB_536341_1
CE/TTPS/3779-S
Open Tender
Miscellaneous Works
Works
90 days
CE/TTPS
As per NIT
4 documents required · 4 mandatory
₹0
₹7,600
Yes
27 Oct 2025
28 Mar 2025
22 Apr 2025
28 Mar 2025
21 Apr 2025
28 Mar 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .