Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-Finance 4314 FIRST FLOOR KIKAR BAZAR BATHINDA 151 001 | BATHINDA | BATHINDA | PUNJAB | 151001 | L1 | Accepted-Finance Ok | |
| 2 | L2₹2.6 L+₹64.96 (0.03%)Accepted-Finance | L2 | Accepted-Finance Ok |
Tender Value
Refer Docs
Closing Date
7 Apr 2021, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE EnM HP II
OFFICE OF THE EXECUTIVE ENGINEER EnM HP II HAIDERPUR WATER WORKS DELHI 110085
Replacement of Pump No9 at Delhi Cantonment BPS
2021_DJB_202381_1
NIT No.12 Item No.2
Open Tender
Miscellaneous Works
Works
30 days
HAIDERPUR WATER WORKS
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
DJB EMD a/c No.- 50448339804
Exempted
16 Apr 2021
27 Mar 2021
7 Apr 2021
27 Mar 2021
7 Apr 2021
27 Mar 2021
120 days
Arrangement of safety equipment for the protection of staff to execute the work. Equipment like safety belts, ladder, safety shoes, helmet , submersible pumps with accessories etc.
Closing of suction and delivery valve by man power to not incoming the water for execute the work i/c Providing & Fixing of temporary blank flanges on the suction and delivery site.
Disconnection of electric connection of motor from the panel board & motor and dismantling of pump and motor from the base frame after cutting of all rusted nut bolts by the help of gas cutter and opening the nut-bolts of coupling by required tools & tackles as per site requirement.
Removing of existing MS base frame from the RCC foundation and placing at ground level by lifting with crane and modification the same as new pump (Provided by Department).
Fixing of MS base frame on the RCC foundation by tightening of nut bolts with proper level.
Providing the new Suction and Delivery side expander/reducer for the pump made out with the 10 mm thick MS sheet fixing the flanges on both side 35 mm thick duly machined as per site requirement.
S/O Rubber packing.
S/O Nut-bolts.
Providing fixing of liner plates for making the alignment of pump and motor.
Re-fixing of pump & motor on the MS base frame and suction & delivery line with nut bolts re-connecting of coupling by nut bolts. Making zero alignment without any vibration at proper level, connection of motor from panel to starter. The job including removing of blank flanges from the suction and delivery line and opening the valves.
Providing the 32 mm pump water throttle line as per site requirement. (5 Mtr. Approx).
Paint & primer charges for the baes frame and other allied accessories of the said pump.
Testing & commissioning.
Transport charges of tool & tackles to & fro.
VS ENGINEERING COMPANY
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .