Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.4 LAdmitted-Finance | -0.40% | ₹7.4 L | L1 | Admitted-Finance |
| 2 | L2₹7.7 L+₹26,214.01 (3.52%)Admitted-Finance | +3.11% | ₹7.7 L+₹26,214.01 (3.52%) | L2 | Admitted-Finance |
| 3 | L3₹7.7 L+₹29,126.68 (3.92%)Admitted-Finance NA | NA | NA | 121004 | +3.50% | ₹7.7 L+₹29,126.68 (3.92%) | L3 | Admitted-Finance |
Tender Value
₹7.5 L
EMD Value
₹14,940
Closing Date
26 Feb 2026, 2:00 pmClosed
DG (WS)
5, S N Banerjee Road, Kolkata
MANUFACTURING AND SUPPLY OF ACCESSORIES INCLUDING FITTING FIXING OF A COMPLETE ROTARY ELEMENT FOR HT PUMP UNIT NO. 4 UNDER MULLICK GHAT PUMPING STATION
2026_KMC_1004365_1
KMC/DG(WS)/MGPS/09/2025-26
Open Tender
MECHANICAL
Percentage
40 days
Mullick Ghat Pumping Station, 67/5, Strand Road
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹14,940
17 Jun 2026
11 Feb 2026
28 Feb 2026
11 Feb 2026
26 Feb 2026
11 Feb 2026
MANUFACTURING, SUPPLY AND DELIVERY OF ONE G.M. IMPELLER (HAVING CU-85%, ZN-4 TO 6%, PB-4 TO 6%, SN-4 TO 6%) FOR 580 B.H.P., 0.625 MGH CAPACITY CENTRIFUGAL PUMP WITH 8 NOS.VANES, 605 M.M.O.D., & 135 M.M. BORE DIA, OVERALL FINISHED WEIGHT NOT LESS THAN 165 KG (AS PER SAMPLE SUPPLIED DEPARTMENTALLY) COMPLETE AS PER DIRECTION OF EIC
MANUFACTURING, FITTING & FIXING OF SLEEVE BUSH (HAVING CU-85%, ZN-4 TO 6%, PB-4 TO 6%, SN-4 TO 6%) AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC (AS PER SAMPLE SUPPLIED DEPARTMENTALLY)
MANUFACTURING, SUPPLY AND DELIVERY OF ONE NO. SHAFT MADE FROM 2730 M.M. OVERALL LENGTH & 145 M.M. DIA ROUND BAR OF EN-24 MATERIAL, FOR 580 B.H.P., 0.625 MGH CAPACITY CENTRIFUGAL PUMP BY MACHINING, THREAD CUTTING AND KEY WAY CUTTING COMPLETE AS PER DIRECTION OF EIC. (AS PER SAMPLE SUPPLIED DEPARTMENTALLY)
MANUFACTURING, FITTING & FIXING OF JAM NUT ((HAVING CU-85%, ZN-4 TO 6%, PB-4 TO 6%, SN-4 TO 6%)) AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC (AS PER SAMPLE SUPPLIED DEPARTMENTALLY)
MANUFACTURING, FITTING FIXING OF WEARING RING (MOC-GUN METAL-CU-85%, ZN-4 TO 6%, PB-4 TO 6%, SN-4 TO 6%) AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF E.I.C.(AS PER SAMPLE SUPPLIED DEPARTMENTALLY)
MANUFACTURING, FITTING & FIXING OF SQUARE BAR SHAPED KEY (MOC-EN-9) WITH BOLTS AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC
ULTRA SONO-GRAPHY/DIE-PENETRATION (USG & DP TEST) TEST TO CHECK THE DEFECT/CRACK OF SHAFT MATERIAL & TEST CERTIFICATE TO BE FURNISHED, OBTAINED FROM THE COMPETENT AUTHORITY & COMPLETE IN ALL RESPECT WITH PROPER CARE & CAUTION AS PER DIRECTION OF EIC (MODE OF MEASUREMENT- LENGTH OF THE SHAFT)
FITTING FIXING OF THE IMPELLER BY HYDRAULIC JACK & SPECIALIZED FIXTURES ETC. & COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC.
TRUENESS AND ECCENTRICITY CHECKING OF THE SHAFT IMPELLER ASSEMBLY, TRUENESS CHECKING OF THE COUPLING AND DYNAMIC BALANCING THE COMPLETE ASSEMBLY BY ADDING OR REMOVING THE UNBALANCED MASS AND COMPLETE IN ALL RESPECT AS PER DIRECTION OF EIC. THE BALANCING CERTIFICATE MUST BE FURNISHED TO THE DEPARTMENT FROM A REPUTED AGENCY
Sub Total
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
Technical.pdf
Tender Documents • 0.91 MB
BOQ_2462500.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .