Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.1 LAdmitted-Finance | -21.99% | ₹5.1 L | L1 | Admitted-Finance |
| 2 | L2₹5.4 L+₹32,664.56 (6.40%)Admitted-Finance | -17.00% | ₹5.4 L+₹32,664.56 (6.40%) | L2 | Admitted-Finance |
| 3 | L3₹5.8 L+₹71,220.53 (13.9%)Admitted-Finance | -11.11% | ₹5.8 L+₹71,220.53 (13.9%) | L3 | Admitted-Finance |
| 4 | L4₹5.9 L+₹78,486.60 (15.4%)Admitted-Finance | -10.00% | ₹5.9 L+₹78,486.60 (15.4%) | L4 | Admitted-Finance |
Tender Value
₹6.5 L
EMD Value
₹13,092
Closing Date
18 Aug 2026, 6:00 pmClosed
FAYAZ AHMED SHEIKH
EXECUTIVE ENGINEER OFFICE REW RAMBAN
AS PER NIT
2026_RDPR_320236_52
NIT NO 25.3 OF REW RAMBAN 2026 27 BLOCK SANGALDAN UNDER HEAD PRI/DDC/BDC/APDP
Open Tender
Civil Works
Percentage
60 days
RAMBAN
AS PER NIT
2 documents required · 2 mandatory
₹600
Rural Development and Panchayati Raj
₹13,092
15 Sept 2026
10 Aug 2026
19 Aug 2026
10 Aug 2026
18 Aug 2026
10 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soils. | 1 | cum | 479.3 | ₹478.82 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 1 | cum | 5,202.9 | ₹5,197.7 |
| 3 | Providing and laying in position Reinforced cement concrete in beams, cantilevers, suspended floors, roofs etc. etc. all work above plinth upto floor V level of specified grade including curing but excluding the cost of centring and shuttering in 1:1.5:3 (1 cement :1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | - | cum | 9,821.85 | - |
| 4 | Steel Reinforcement for RCC work including cutting, bending, binding and placing in position all complete (TMT bars of Fe500 Grade) | 1 | kgs | 79.25 | ₹79.17 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) with 30% boulders | - | cum | 5,733.6 | - |
| 6 | Providing and laying in position stone Boulders of small size including all etc. complete | - | cum | 855 | - |
| 7 | Brickworkwith common burnt clay bricks of class designation 75 in cement moratr 1:6 (1 cement: 6 coarse sand) in foundation and plinth | 1 | cum | 7,890.2 | ₹7,882.31 |
| 8 | Extra for Brickworkwith common burnt clay bricks of class designation 75 in cement moratr 1:6 (1 cement: 6 coarse sand) above plinth | - | cum | 1,455.65 | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form work for:foundations ,footings etc. | - | sqm | 286.35 | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form work for:Lintels, beams etc. | - | sqm | 663.4 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.10 MB
BOQ_1064088.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .