Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 CrAccepted-AOC | ₹7.5 Cr Quoted ₹7.1 Cr | L1 | Accepted-AOC lowest bidder |
| 2 | L2₹7.3 Cr+₹18.0 L (2.53%)Rejected-AOC | ₹7.3 Cr+₹18.0 L (2.53%) | L2 | Rejected-AOC L2 |
| 3 | L3₹7.5 Cr+₹38.6 L (5.42%)Rejected-AOC | ₹7.5 Cr+₹38.6 L (5.42%) | L3 | Rejected-AOC L3 |
Tender Value
₹5.1 Cr
EMD Value
₹12.9 L
Closing Date
2 Jun 2026, 4:00 pmClosed
Addl Chief Engineer (MGP)
Office of Addl CHief Engineer, Buildings and Housing Department, Gangtok
Construction of Office and Residential Complex for BIP Rumtek, under SIB Gangtok
2026_BHD_896_1
2446/SD/HQ-I/Bldgs/P/22
Open Tender
Civil Works - Buildings
Percentage
730 days
Rumtek
Please refer Tender documents.
2 documents required · 2 mandatory
₹1 L
Yes
Additional Director (Accounts) SNT
₹12.9 L
Yes
20 Aug 2026
5 May 2026
4 Jun 2026
5 May 2026
2 Jun 2026
5 May 2026
5 May 2026 - 2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Building Work | |||||
| 1.01 | Eart work in excavation by mechanical means ( Hydraulic Excavator) manual means in foundation trenches or drains ( not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 508.63 | cum | 295.52 | ₹1,50,310.34 |
| 1.02 | Providing and laying packed stone in buildings works with clean hard selected stones, all complete. (Manual means) | 148.59 | cum | 1,110.94 | ₹1,65,074.57 |
| 1.03 | Providing and laying in position cement concrete of specified grade including compacting curing etc all complete. 1:2:4mix. (1 ceement, 2 coarse sand, 4 graded stone aggregate of 20 mm & down size) | 97.17 | cum | 5,923.74 | ₹5,75,609.82 |
| 1.04 | Filling inside plinth in building works with 23 cm layers, consolidated to 15cm including watering, ramming etc, all complete. | 432.6 | sqm | 257.03 | ₹1,11,191.18 |
| 1.05 | Providing and laying coarse rubble stone masonry with hammer dressed clean hard selected stone in 1:3:6 c.c (1 cement , 3 sand, 8 clean hard graded stone ships of size 40mm) including bond stone, through stone sand, 8 clean hard stone aggregate of size 40mm and down) and curing etc. complete as per the direction of engineer in charge excluding the cost of carriage of materials. | 63.36 | cum | 5,078.43 | ₹3,21,769.32 |
| 1.06 | Prroviding and laying in position specified grade of reinforced cement concrete excluding the cost of form work , finishing and reinforcements. | 426.5 | cum | 6,885.24 | ₹29,36,554.86 |
| 1.07 | Providing, fixing & removing form work for casting R.C.C items as indicated below with imported timber from outside the state. | - | - | - | - |
| 1.08 | Foundation, footings, base of column etc for mass concrete. | 127.33 | sqm | 825.32 | ₹1,05,088 |
| 1.09 | Square columns | 1,447.37 | sqm | 1,149.41 | ₹16,63,621.55 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_970.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
Tendernotice_2.pdf
PDF • 0.60 MB
BOQ_970.xls
BOQ • 0.53 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .