| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹74.5 L+₹13,898 (0.19%)Rejected-Finance NO 2 69 MAIN ROAD VALLAMPADUGAI CHIDAMBARAM TK | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | RADHIKA VBR CONSTRUCTION L1 | K MEENA L2 |
|---|---|---|---|---|---|
| 1.00Construction of Flood Control concrete channel at K.N.Pettai main road in Cuddalore block | |||||
| 2.00 | Earthwork excavation in all classes of soils except hadr rock in hard ORDINARY SOIL with initial lead and lift including all other labour charges etc. Complete as per SS 20 B. | 466.7 | Cum | 263 ₹1,22,742.1 Lowest | 265 ₹1,23,675.5 |
| 3.00 | Supply and Filling with sand from approved Quarry including all other labour charges etc. Complete | 46.67 | Cum | 2,124 ₹99,127.08 Lowest | 2,125 ₹99,173.75 |
| 4.00 | Cement Concrete 1:4:8 ( One Cement Four sand and Eight Hard Broken stone) using 40 mm gauge Hard Broken Granite stone jelly for foundation including cost and conveyance of materials to site and labour charges for laying, watering and compacting etc. complete. | 46.67 | Cum | 5,975 ₹2,78,853.25 Lowest | 6,000 ₹2,80,020 |
| 5.00 | Supplying and erecting Centering and Shuttering for soffits including necessary supports and strutting up to 3 M height for plane surfaces as detailed below in all floors . complete complying with the standard specification.(Payment for centering shall be given after the concrete is laid). | 1,723.2 | Sqm | 547.5 ₹9,43,452 Lowest | 550 ₹9,47,760 |
| 6.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. | 24,097 | Kg | 91.9 ₹22,14,514.3 Lowest | 92 ₹22,16,924 |
| 7.00 | Reinforced Cement Concrete 1:1-1/2:3 (One Cement, One and a half sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges etc complete | 269.25 | Cum | 9,764 ₹26,28,957 Lowest | 9,770 ₹26,30,572.5 |
| 8.00 | Provision for Weep holes | 1 | No | 9,000 ₹9,000 Lowest | 10,000 ₹10,000 |
| 9.00 | Provision for Name Board Charges | 1 | No | 4,202 ₹4,202 Lowest | 4,500 ₹4,500 |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} | 1 | GST Amount | 11,34,153 ₹11,34,153 Lowest | 11,36,273 ₹11,36,273 |
Tender Value
₹75 L
EMD Value
₹75,000
Closing Date
16 Oct 2025, 3:00 pmClosed
Additional Collector
Drda,Cuddalore
Construction of Flood control concrete channel at K.N.Pettai main road
2025_RDTN_612903_1
A2/3878/2024/SDRF
Open Tender
Civil Works - Others
Item Wise
90 days
Cuddalore
As per tender
3 documents required · 3 mandatory
₹0
₹75,000
Drda,Cuddalore
18 Nov 2025
10 Oct 2025
16 Oct 2025
10 Oct 2025
16 Oct 2025
10 Oct 2025
13 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .