| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.1 L+₹22,533 (4.60%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | PITCHAIMANI N L2 | SRI KRISHNA AGENCIS L1 |
|---|---|---|---|---|---|
| 1.01 | Cutting the Tar Road Surface carfully handle etc., complete | 1 | m3 | 837.1 ₹837.1 | 800.3 ₹800.3 Lowest |
| 2.01 | Dismantling Reinforcement Cement Concrete carefully handled etc., complete | 3 | m3 | 4,089 ₹12,267 | 3,909.2 ₹11,727.6 Lowest |
| 3.01 | Earthwork excavation for foundation in Hard stiffclay, stiff black cotton, hardre dearth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20 Band Sand, silt or other loose soil, wets and, or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hard rock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete10cum (Corp Page No: 20) | 12 | m3 | 224.2 ₹2,690.4 | 214.3 ₹2,571.6 Lowest |
| 4.01 | Supplying and filling in foundation and basement with filling Quarry Dust in layers of not morethan15cm.thick well rammed watered and compactedetc.,complete complying with standard specification. (Corp Page No: 27) | 2 | m3 | 437.3 ₹874.6 | 418.1 ₹836.2 Lowest |
| 5.01 | Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification | 2 | m3 | 5,924.8 ₹11,849.6 | 5,664.2 ₹11,328.4 Lowest |
| 6.01 | Supplying, erecting with necessary supports for plain surface such as RCC Boxing side slab and silmilar RCC slab with all cross bracing etc., complete in all floors of any height (the retrived materials) should be taken back by the contractor the payment for cenetering shall be given after the concrete is laid ( vertical portion ) 10m2 | 137 | m2 | 1,173.5 ₹1,60,769.5 | 1,121.9 ₹1,53,700.3 Lowest |
| 7.01 | Cement concrete 1:2:4 (one cement two sand and four aggregates) Using 20mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete. | 12 | M3 | 7,358.3 ₹88,299.6 | 7,034.7 ₹84,416.4 Lowest |
| 8.01 | Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete | 3 | m3 | 9,759.9 ₹29,279.7 | 9,330.7 ₹27,992.1 Lowest |
| 9.01 | Removal of Cut stone slabs / RCC cover slabsetc., complete | 48 | M2 | 535.4 ₹25,699.2 | 511.9 ₹24,571.2 Lowest |
| 10.01 | Earth Work Deploying earth moving machinery for desilting channel and forming hund on either side and depositing the earth on banks including jungle clearance etc completed | 21 | M3 | 35.4 ₹743.4 | 33.8 ₹709.8 Lowest |
Tender Value
₹4.9 L
EMD Value
₹4,910
Closing Date
3 Apr 2025, 3:00 pmClosed
Commissioner Madurai Corporation
Aringar Anna Maligai
Construction of Storm Water Drain,Culvert and Desilting Work of Storm Water Drain at Muthuramalinga Devar Street From Ramasamy Muthaliyar Street to Ammachi Amman Kovil Street Jn Part-I in Ward No 66
2025_MAWS_534560_1
E2 / EST 427 / 24-25
Open Tender
Civil Works
Lump-sum
60 days
Madurai
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,910
19 Sept 2025
24 Mar 2025
3 Apr 2025
24 Mar 2025
3 Apr 2025
24 Mar 2025
Amount
Cutting the Tar Road Surface carfully handle etc., complete
Dismantling Reinforcement Cement Concrete carefully handled etc., complete
Earthwork excavation for foundation in Hard stiffclay, stiff black cotton, hardre dearth, shales murram, gravel, stoney earth and earth mixed with small size boulders SS.20 Band Sand, silt or other loose soil, wets and, or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hard rock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete10cum (Corp Page No: 20)
Supplying and filling in foundation and basement with filling Quarry Dust in layers of not morethan15cm.thick well rammed watered and compactedetc.,complete complying with standard specification. (Corp Page No: 27)
Plain Cement Concrete 1:4:8 (one cement four fine aggregates and eight coarse aggregates) using 40mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges and all incidential charges such as water providing etc., complete as per standard specification
Supplying, erecting with necessary supports for plain surface such as RCC Boxing side slab and silmilar RCC slab with all cross bracing etc., complete in all floors of any height (the retrived materials) should be taken back by the contractor the payment for cenetering shall be given after the concrete is laid ( vertical portion ) 10m2
Cement concrete 1:2:4 (one cement two sand and four aggregates) Using 20mm gauge hard broken granite jelly for foundation inc. consolidation and dewatering for foundation wherever necessary etc.complete.
Reinforced cement concrete 1:1 1/2 :3 (One cement One and half sand and three aggregate) using 20mm machine broken gauge bard granite jelly for RCC worksthe rate excluding the cost of reinforcement grills,centering and shuttering etc., complete
Removal of Cut stone slabs / RCC cover slabsetc., complete
Earth Work Deploying earth moving machinery for desilting channel and forming hund on either side and depositing the earth on banks including jungle clearance etc completed
Manufacturing and fixing inposition RCC precast slab in C.C.1:2:4, using 20mm HBGS machine crushed jelly of following thickness, excluding cost of rein forcement grill but including moulding, finishing, curing and fixing inposition etc. Complete.75mm thick
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. (Corp Page No: 34)
Refixing of Cut stone/ RCC cover slabs etc., complete
Add GST 18%
PITCHAIMANI N (BID ID -1281545)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .