Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.6 LAccepted-AOC | ₹31.6 L | L1 | Accepted-AOC Lowest Value |
| 2 | L2₹31.7 LRejected-Finance | ₹31.7 L | L2 | Rejected-Finance Highest Value |
| Sl No | Description | Qty | Unit | LINGAM ENTERPRISES L2 | SELVAMRAJAJI L1 |
|---|---|---|---|---|---|
| 1.00Construction of Panchaayt office building @ Kelur Village in Kelur Panchayat | |||||
| 1.01Culvert | |||||
| 1.02 | Earth work excavation for foundation and depositing on bank with initial lead of 10 mts and initial lift of 2.0 in hard stiff clay stiff black cotton soil, hard red earth shales, murram, gravel, stoney earth and earth mixed with 50% fair sized boulders and gravelly soil etc., complete for boxing as per IS 20A. | 61.6 | Cu.m | 270 ₹16,632 | 260 ₹16,016 |
| 1.03 | Plain Cement Concrete 1 : 4 :8 ( one part of cement, four parts of sand and eight parts of hard broken stone ) using 40 mm gauge hand broken hard broken granite stone jelly complying with standard specifications in foundations and basement. | 22.3 | Cu.m | 5,670 ₹1.3 L | 5,650 ₹1.3 L |
| 1.04 | Cement concrete 1:2:4 mix usin 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,For Foundation | 8.82 | Cu.m | 7,070 ₹62,357.40 | 7,060 ₹62,269.20 |
| 1.05 | Supplying and filling with filling sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete For Foundation | 15.59 | Cu.m | 2,030 ₹31,647.70 | 2,010 ₹31,335.90 |
| 1.06 | Supplying and Filling the U/S gravel from appd quarry including cost and conveyance and filling charges etc., as per std. Specification | 41.68 | Cu.m | 130 ₹5,418.40 | 120 ₹5,001.60 |
| 1.07 | Brick work with cement mortar 1:5 mix using II class bricks for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. | 68.81 | Cu.m | 6,215.6 ₹4.3 L | 6,215 ₹4.3 L |
| 1.08 | Reinforced cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 36.72 | Cu.m | 9,573.67 ₹3.5 L | 9,573 ₹3.5 L |
| 1.09 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 3.9 | mt | 91,957.3 ₹3.6 L | 91,957 ₹3.6 L |
Tender Value
₹32 L
EMD Value
₹32,000
Closing Date
13 Mar 2026, 6:00 pmClosed
Block Development Officer V.P
Block Development Office, Polur
Construction of Panchayat Office Building at Kelur Panchayat, Polur Block, Tiruvannamalai District
2026_RDTN_674436_1
A4/402/2026
Open Tender
Civil Works
Block Development Office, Polur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹32,000
18 Mar 2026
13 Mar 2026
13 Mar 2026
13 Mar 2026
13 Mar 2026
13 Mar 2026
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid