Loading…
Loading…
Tender Value
₹99,500
EMD Value
₹2,985
Closing Date
16 Sept 2026, 6:55 pm4d left
office of the executive engineer rew ang
office of the executive engineer rew ang
C/O TILE PATH FROM MAIN ROAD TO ZARIPORA BLOCK LARNOO
2026_RDPR_324181_38
ENIT107of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹2,985
10 Sept 2026
10 Sept 2026
17 Sept 2026
10 Sept 2026
16 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position of specified grade of cement concrete in1:3:6 mix including curing excluding cost of centering and shuttering | 5.74 | Cum | 5,733.6 | ₹32,910.86 |
| 2 | Providing and laying 60mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and of approved size and design/shape laid in required colour and pattern over and including 50mm thick | 67.26 | sqm | 816.15 | ₹54,894.25 |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form | 17.94 | sqm | 286.35 | ₹5,137.12 |
| 4 | Carriage of sand aggregates by MT 40km | 7.81 | Cum | 630.74 | ₹4,926.08 |
| 5 | Provision for signboard and photograph | 1 | No. | 1,500 | ₹1,500 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_1093235.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .