Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.1 Cr
EMD Value
₹2.1 L
Closing Date
30 Jul 2024, 10:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Rural Development and Panchayat Raj Department
EE OFFICE
Construction of CC Road and Drain in Uchangidurga, Chatnahalli, Arsikera, Hanumanahalli, Yarabahalli, Punabgatta, Budihal Villages in Harapanahalli Taluk
RDPR/2024-25/RD/WORK_INDENT6689
RDPR/2024-25/RD/WORK_INDENT6689
Open
Roads
Two Tender Document System(Two Cover)
RDPR Division Office Vijayanagara
7 documents required · 7 mandatory
Minimum financial turnover (civil engineering construction works) not less than two times the annual payments from this contract (Rs. xxxxx Lakhs)
Satisfactoriy completed (atleast 90%) as prime contractor at-least one such similar work of value not less than Rs. xxxxxxx (80% of estimated cost of tender)
Executed in any one year the following minimum quantities of work (Cement Concrete - xxxx cum, Earthwork - xxxx cum, etc) (80% of peak rate of construction)
Tenderer or his identified Sub Contractor should possess valid Electrical License for executing building electrificatio works and should have executed similar electrical works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Tenderer or his identified Sub Contractor should possess valid license for executing water supply / sanitary engineering works and should have executed similar works totallng Rs. xxxxxx (not less than 50% of electrical works) n any one year
Owning the following key and critical equipment for this work (xxxx, xxxx, xxxx)
Liquid assets and /or availability of credit facilities of no less than Rs. xxxxxx Lakhs (estimated cash flow for 3 months of peak construction period)
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing works
List of works for which tenders already submitted
Banker Details for reference
Construction equipment owned by the tenderer and equipment proposed to be deployed on this contract, if awarded
Reports on the financial standing of the tenderer, such as profit and loss statements and auditor’s reports for the last five years
Qualification and experience of the key technical and management personnel in permanent employment with the tenderer and those that are proposed to be deployed on this contract, if awarded
List of Financial Resources with Certificates
Work done certificate Bidder should have satisfactorily completed at least one similar nature of work of value not less than the amount of Rs 52.94Lakhs in any one year during the previous five years ie 2019-20 to 2023-24 The cost of works executed in previous years shall be updated to 2023-24 at 10 percent per annum (C C Work done). Work done certificate must have Indent number, otherwise bid will not be taken into consideration.
Executed in any one year for a continuous period of 12 months the minimum quantities of work. 2018-19 to 2022-23 80% of the estimated quantity required1 EW ES Embankment 1118.00 cum 2 WBM WMM 323.28 cum 3 RCC PCC 594.66 cum 4 Steel 8.02 Tonne 5 Centering 531.11 cum IMP.Note Separate year wise 80 percent quantity with works list sheet strictly to be enclosed. other wise bid may not be consider
Achieved in at least Two financial years a minimum financial turnover (in all classes of civil works only) of Rs.211.76lakhs (Last 5 years 2019-20 to 2023-24) (usually not less than two times the estimated annual payments under this contract)
Liquid assets or availability of credit facilities of no less than Rs.52.94Lakhs Credit lines or letter of credit or certificates from banks for meeting the fund requirement etc.
Constitution/ legal status of Tenderer, Place of Registration , Principal place of business.
The tenderers who meet the above specified minimum qualifying criteria will be qualified if there available tender capacity is more than the total tender value the available tender capacity will be calculated as under assist available tender capacity AxNx1.5-B
The proposed methodology and program of construction, backed with equipment planning and deployment, duly supported with broad calculations and quality control procedures proposed to be adopted, justifying their capability of execution and completion of the work as per technical specifications within the stipulated period of completion.
All the tenderer shall provide the requested Qualification Information accurately and in sufficient details as per formats given in Section 3 of SBD KW-4
₹2,650
₹2.1 L
23 Jul 2024
23 Jul 2024
31 Jul 2024
29 Jul 2024
20 Jul 2024
Construction of CC Road and Drain in Uchangidurga, Chatnahalli, Arsikera, Hanumanahalli, Yarabahalli, Punabgatta, Budihal Villages in Harapanahalli Taluk
1.Uchangidurga Village Davanagera-Harapanahalli road to Parashuramappa house CC Road - Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanica...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), ...
Construction of Earthen Shoulders Construction of sub-grade and earthen shoulders withapproved material obtained from borrow pits with all lifts &leads, transporting to site, sCOMMONading, grading to ...
Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works in all kinds of soils , as per drawing and tech...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.5...
Appendix I Additionalities for Formwork, Centering & Scaffolding Concrete Drain Works 35%
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or priorexcavation with all lifts and lead, transportation to site, spreading,g...
2.Uchangidurga Village SC colony road to Raviyappa house CC Road - Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanica...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), ...
Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works in all kinds of soils , as per drawing and tech...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.5...
Appendix I Additionalities for Formwork, Centering & Scaffolding Concrete Drain Works 35%
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or priorexcavation with all lifts and lead, transportation to site, spreading,g...
3.Chatnahalli CC Drain - Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works in all kinds of soils ...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.5...
Appendix I Additionalities for Formwork, Centering & Scaffolding Concrete Drain Works 35%
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or priorexcavation with all lifts and lead, transportation to site, spreading,g...
4.Arsikera CC Drain - Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works in all kinds of soils , a...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.5...
Appendix I Additionalities for Formwork, Centering & Scaffolding Concrete Drain Works 35%
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or priorexcavation with all lifts and lead, transportation to site, spreading,g...
5.Hanumanahalli CC Road - Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanica...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), ...
Construction of Earthen Shoulders Construction of sub-grade and earthen shoulders withapproved material obtained from borrow pits with all lifts &leads, transporting to site, sCOMMONading, grading to ...
Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works in all kinds of soils , as per drawing and tech...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.5...
Appendix I Additionalities for Formwork, Centering & Scaffolding Concrete Drain Works -35%
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or priorexcavation with all lifts and lead, transportation to site, spreading,g...
6.Arsikera Shantaprakesh Nagara CC Road - Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material to the appro...
Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works in all kinds of soils , as per drawing and tech...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.5...
Appendix I Additionalities for Formwork, Centering & Scaffolding Concrete Drain Works -35%
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or priorexcavation with all lifts and lead, transportation to site, spreading,g...
Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 m3 in volume and stock piling at designated locations and disposal of dismantle...
Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanica...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), ...
7.Yarabahalli CC Road - Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanica...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), ...
8.Punabagatta CC Road - Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanica...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), ...
Construction of Earthen Shoulders Construction of sub-grade and earthen shoulders withapproved material obtained from borrow pits with all lifts &leads, transporting to site, sCOMMONading, grading to ...
9.Budihal CC Road - Removal of Unserviceable Soil with Disposal upto a suitable distance as directed by the Engineer incharge of work
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or prior excavation with all lifts and lead, transportation to site, spreading,...
Wet Mix Macadam (Plant Mix Method) - Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanica...
Providing and constructing un-reinforced plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M20 (Grade), ...
Construction of Earthen Shoulders Construction of sub-grade and earthen shoulders withapproved material obtained from borrow pits with all lifts &leads, transporting to site, sCOMMONading, grading to ...
Earth work excavation by manual means for drains,canals, waste weir draft, approach channels, key trench, foundation of Bridges and such similar works in all kinds of soils , as per drawing and tech...
Providing and laying in position plain cement concrete for levelling course for all works in foundation. The granite/trap/basalt crushed graded coarse aggregates and fine aggregates as per relevant IS...
Providing and laying in position Reinforced cement concrete for all Sub structures of building, Irrigation works, Sub structure works of bridges, Drain works & other parallel works from 0.50m to 3.5...
Appendix I Additionalities for Formwork, Centering & Scaffolding Concrete Drain Works -35%
Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/welding joints, tyin...
Construction of Embankment by excavating the available approved Gravel/Murrum deposited at a place or borrow pits during or priorexcavation with all lifts and lead, transportation to site, spreading,g...
Providing Name board for the work
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
KW IV SBD Technical Cretaria.xlsx
Instructions to Tenderers • 0.02 MB
INDENT 6689 DTS.doc
Tender Document • 1.00 MB
QTY.xls
Others - QTY • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .