| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Rejected-Technical 610 PP TOWERS C 1 2 3 NETAJI SUBHASH PLACE PITAMPURA NORTH WEST DELHI DELHI 110034 | NORTH WEST DELHI | DELHI | 110034 | Rejected-Technical Bidder is not meeting Tech. BQC Technically not accepted. |
| 3 | Rejected-Technical 601 V 4 TOWER PLOT NO 14 KARKARDOOMA COMMUNITY CENTER VIKAS MARG DELHI 110092 | DELHI | EAST DELHI | DELHI | 110092 | Rejected-Technical Bidder is not meeting Tech. BQC Technically not accepted. |
Tender Value
Refer Docs
Closing Date
28 Nov 2023, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Mr. Diptiman Chatterjee , GM , SCM
EIL GURUGRAM
VENTILATION AND PRESSURISATION SYSTEM FOR DCU REVAMP PROJECT OF M/S NUMALIGARH REFINERY LIMITED
2023_EIL_775310_1
DC/B440-003-LB-MR-4060/42
Open Tender
Miscellaneous Goods
Supply
240 days
AS PER BIDDING DOCUMENT
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
Exempted
AS PER BIDDING DOCUMENT
1 Apr 2024
23 Oct 2023
29 Nov 2023
23 Oct 2023
28 Nov 2023
13 Nov 2023
2 Nov 2023
Amount
Supply of Following Items on FOT Dispatch Point Basis (Including all taxes and Duties excluding GST) as per complete scope of MR.
Supply of Following Items as per MR scope MR Sr.No 01.01 : Tag No : 03-LB-00-001 Ventilation and Pressurisation System for Switchgear hall
Unloading at site, handling, transportation to store and from store to work site, storage at site, assembly at site, installation, testing, precommissioning, painting, insulation, commissioning, performance guarantee test run, handing over to client and other field works including minor civilstructural work for the following, as per the enclosed EIL standard specifications, instructions to vendors, job specification, data sheets etc. NOTE : The Quoted site work charges shall be minimum 20% of the quoted supply prices. In case a supplier quotes site work charges lesser than 20% of supply price, the differential charges shall be retained from supply prices and shall be paid along with last 10% payment of supply which will be paid after completion of work.
MR S.No 02.01 : Site work For Sr. No. 01.01 [03-LB-00-001]
Supply of Mandatory Spares as per Job specification of Ventilation & Pressurisation system [Refer Note-2 of MR Top Sheet] [Note: No additional freight charges shall be payable for Mandatory Spares since it shall be dispatched with main item (Sl. No. 01.01 of MR) and shall be deemed to be included in freight charges of the main item (Sl. No. 01.01 of MR)]
MR S.No 04.01 : Mandatory Spares For Sr. No. 01.01 [03-LB-00-001]
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .