Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.2 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L1₹19.2 CrRejected-Finance | L1 | Rejected-Finance L1 | |
| 3 | L3₹19.2 Cr+₹4.3 L (0.22%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹20.0 Cr+₹84.6 L (4.42%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹20.1 Cr+₹96.1 L (5.02%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹21.3 Cr
EMD Value
₹21.3 L
Closing Date
7 Aug 2023, 5:00 pmClosed
Chief Engineer, Buildings, Odisha, Bhubaneswar
O/o. the E.I.C. (Civil), Odisha, Unit-V, Nirman Soudha, Bhubaneswar.
Construction of 300 Seated U.G. Boys Hostel (G plus 5) at MKCG Medical College and Hospital, Berhampur.
2023_EICCL_90882_1
C.E. (B) - 12 / 2023-24
Open Tender
Civil Works - Buildings
Percentage
547 days
BERHAMPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹21.3 L
Yes
27 Dec 2023
19 Jul 2023
8 Aug 2023
19 Jul 2023
7 Aug 2023
19 Jul 2023
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | CIVIL WORKS
Earth work in excavation of over Burdain earth in hard soil including with initial leads and lifts including dressing and levelling the bed and depositing the excavated materials at places away from work site with all leads including cost of all labour, T&P required for the work etc.complete and as per the direction of the Engineer-In-Charge. | 648.18 | Cum | 206.77 | ₹1,34,024.18 |
| 2 | Earth work in excavation of foundation in all kinds of soil within 50m initial lead and 1.50m initial lift including rough dressing breaking clods maximum 5cm to 7cm & laying in layers not exceeding 0.3m depth for the work complete including shoring, shuttering & dewatering (if required) with cost of all Labour, Labour cess ,Hire & Running charges of the water pumps, Sundries, T & P required for the work complete as directed by the Engineer- in- charge. | 4,603.45 | Cum | 223.67 | ₹10,29,653.66 |
| 3 | Exacavation of foundation in hard rock (granite) remved by chiselling including dressing and leveling the bed not exceeding 1.5m in depth and deposing the soil within intila lead of 50m and as per approved by EIC | 511.49 | Cum | 2,276.08 | ₹11,64,192.16 |
| 4 | Supplying and filling in foundation and plinth with good quality river sand including watering, ramming with cost, conveyances, royalties of all materials and cost of all labour with T&P required for the work etc. complete as per specification & direction of Engineer-in-charge | 3,245.34 | Cum | 1,472.61 | ₹47,79,120.14 |
| 5 | Providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black hard crusher broken granite stone metal and screened and washed sharp sand for mortar of approved quality and from approved quarry including hoisting, lowering, laying concrete, ramming, watering and curing etc. complete to required levels laid in layers not exceeding 15 cm. thick in each layer including cost, conveyance, royalties of all materials and cost of all labours,labour cess, T&P etc complete as per the direction of the Engineer-in-charge. | 1,055.81 | Cum | 5,398.23 | ₹56,99,505.22 |
| 6Providing, lifting, hoisting and laying Reinforced cement concrete of M-25 grade as per approved designs and drawings having a minimum compressive strength (in work test) 250 Kg. / Square cm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 516 using 12 mm. to 20 mm. size black hard crushed broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned ( 20mm. size chips not to exceeds 25 % ) to be mixed in concrete mixture with Portland slag cement (PSC) including hoisting, lowering, laying and compaction concrete by using vibrators, watering and curing for 28 days, centering and shuttering then after dismantling and removing debris from the work site and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T & P required of the work etc. complete in all respect as directed by the Engineer-in-Charge. But excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or tor steel tying the grills and placing in proper position. | |||||
| 6.01 | Footing Base | 730.57 | Cum | 6,495 | ₹47,45,052.15 |
| 6.02 | R.C.C. Grade Beams | 109.97 | Cum | 7,313.76 | ₹8,04,294.19 |
| 6.03 | R.C.C. COLUMNS | - | - | - | - |
| 6.04 | Ground Floor | 113.82 | Cum | 14,234.7 | ₹16,20,193.55 |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_444563.xls
BOQ Document • 0.69 MB
125426809.pdf
Tender Document • 1.28 MB
DTCN.pdf
Tender Document • 1.26 MB
125426811.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .