| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance 107 2 AMPA MANOR IST FLOOR NELSON MANICKAM ROAD AMINJIKARAI CHENNAI 0 600 029 NO 107 2 AMPA MANOR 1ST FLOOR NELSON MANICKAM ROAD AMINIJIKARAI AMINJIKARAI | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical Not Meeting NIT criteria |
Tender Value
₹64.3 L
EMD Value
₹1.3 L
Closing Date
30 Mar 2023, 6:00 pmClosed
Chief Engineer and Head, TSD
Chief Engineer and Head, Technical Services Division, BARC, Trombay, Mumbai 400085
Refurbishment, SITC and replacement of existing Centrifugal Pumps, Sump Pumps, Submersible Pumps, associated piping and valves, Cooling Coils, Insulation, AHUs, and other miscellaneous works at Central Complex, BARC, Trombay, Mumbai 400085.
2023_BARC_744614_1
BARC/TSD/138/2022-23
Open Tender
Machineries/ Mechanical Engg Items
Item Rate
365 days
BARC, Trombay, Mumbai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.3 L
CC Technical Services Division
12 Jun 2023
14 Mar 2023
3 Apr 2023
14 Mar 2023
30 Mar 2023
24 Mar 2023
14 Mar 2023 - 23 Mar 2023
20 Mar 2023
Amount
Air handling Units: Supply, Installation, testing, commissioning and replacement of complete set of Air Handling Units including, rubber /spring isolators, Volume Control Damper, flexible material for duct connection, 0-50 deg. C, stem type thermometers with GI couplings, 0-7 Kg/sq. cm 100 mm dia. dial type pressure-gauges with syphons & cock (in SS Construction), 20 mm dia. air release valves/drain valve with 150 mm nipples, wiring, starter, termination into electrical panel as per clause No. 1 of technical specifications.
GI Piping: Supply, Installation, testing, commissioning and replacement of existing heavy class chilled water GI pipe line along with flanges, bends, reducers, expanders, unions, nipples, u-traps, covered opening for drain line cleaning, 19 mm thick closed cell nitrile rubber thermal insulation with monsoon tape, necessary MS supports, nut bolt washer, gasket, wooden support with clamp and 26 G aluminium cladding of following sizes as per clause no. 2 of technical specifications.
80 mm dia.
50 mm dia.
40 mm dia. (with 12 mm thick insulation)
25 mm dia. (with 12 mm thick insulation)
CI Valves: Supply, Installation, testing, commissioning and replacement of existing CI flanged end Gate/Globe Valves, 'y' strainers, NRVs along with counter flanges, GI nut-bolts-washer, gasket and 19 mm thick closed cell nitrile rubber thermal insulation with monsoon tape, and 26 G aluminium cladding as per clause no. 3 of Technical specification.
80 mm dia. Gate valves
50 mm dia. Gate valves
80 mm dia. 'Y stariner
NRV 150 mm
NRV 80 mm
NRV 50 mm
Sump Pumps: Supply, Installation, testing, commissioning and replacement of existing 2800/1440 rpm, 3 phase Monoblock Sump pumps, along with necessary MS foundation, foot valves and level sensors with cabling/wiring, termination of electrical connections in electrical panel as per clause no. 4 of technical specifications.
3 HP, Head 13-18 mtr.
1 HP, Head 13-18 mtr.
Submersible pumps: Supply, Installation, testing and commissioning flanged end of 2800/1440 rpm, 3 phase Submersible pumps in SS construction along with foot valve, level sensors with cabling/wiring, termination of electrical connections in electrical panel as per clause no. 5 of technical specification.
5 HP, Head 13-18 mtr.
1 HP, Head 13-18 mtr.
GI Ducting: Supply and installation of GI ducting along with necessary supports and 25 mm thick closed cell nitrile rubber thermal insulation and 26 G aluminium cladding of following sizes as per technical specification. The measurement for insulation and cladding shall be given as per metal surface of GI ducting as per clause no. 6 of technical specification.
18 gauge G.I. sheet (0.8 mm) ducting
22 gauge G.I. sheet (0.8 mm) ducting
Centrifugal Pumps: Supply, installation, testing, commissioning and replacement of existing Horizontal split casing chilled water booster pumps of capacity 22 L/S, Head 18 Mrs. along with MS foundation, counter flanges, nut bolts, TEFC squirrel cage induction motor 10 HP, 3 phase, 1440 RPM, 0-7 Kg/sq. cm 100 mm dia. dial type pressure-gauges with syphons & cock (in SS Construction) and 0-50 deg. C, stem type thermometers with GI couplings aas per clause no. 7 of technical specification..
Cooling Coils: Supply, installation and replacement of existing cooling coils, approx. size 2.42 x 0.45 m, 6 rows deep each, inclusive of Header, counter flanges, nut bolts, gasket etc. as per clause no. 8 of technical specification..
Filer Frame: Supply, installation of AHU Filter Frames, made up of 16 G GI sheets, outer dimensions 3060x1980 to accommodate 18 filters, total 3 rows, 6 filters in 1 rowas per clause no. 9 of technical specification.
HVLS fan: Supply, Installation, Testing & Commissioning of HVLS fan of Dia, 8 ft., 5 blades, complete with motor, hanging/fixing arrangement, anchor fastness, MS frames, wiring/cabling, starter and power cabling up to main panel as per clause no. 10 of technical specification.
SS Bird screen: Supply, Installation of SS bird screen of 2 mm thick wire, 25x25 mm mesh (squared gap), necessary 25 mm wide outer flange with nut and bolts to be provided on round shaped kitchen exhaust fans as per clause no. 11 of technical specification.
Shifting of old scrap: Dismantling, shifting of waste material from different floors of CC Complex of all old AHU's, piping, ducting, submersible pumps. Monoblock pumps, centrifugal pumps, cooling coils, valves, foundations etc., cleaning of entire surfaces of removed scrap and any other material, removing old insulation from outer metal surfaces, bringing all scrap to ground floor in open yard and shifting entire scrap within BARC/TVS store into a truck with sufficient labourersas per clause no.12 of technical specification.
Items mentioned from sr. no. 1.1
Items mentioned from sr. no. 2.1 to 2.4
Items mentioned from sr. no. 3.1 to 3.6
Items mentioned from sr. no. 4.1 to 4.2
Items mentioned from sr. no. 5.1 to 5.2
Items mentioned from sr no. 6.1 to 6.2
Items mentioned at sr. no. 7
Items mentioned at sr. no.8
Item mentioned ar sr. No. 9
Measuring Instruments: Supply of measuring instruments for commissioning of AC system as per clause no. 13 of technical specification.
Digital Infrared Thermometer
Digital Vibration Meter
Digital Anemometer
Digital Sound Level Meter
Digital Laser Tacho Meter
Vacuum Cleaner
MS Work: Supply, of MS angles/channels/MS plates and fabrication of MS doors, walking platform above pipe lines, etc. followed by 2 coats of red oxide primer and 2 coats of enamel paint at different places at Central Complex as per clause no. 14 of technical specification.
Insulation on GI ducting: Supply, installation, testing and commissioning of 25 mm thick closed cell nitrile rubber thermal insulation on outside surface of existing ducting with monsoon tape and 26 G aluminium cladding, after removal of old insulation and cleaning of entire surface. Measurement shall be given as per outer metal surface of the GI ducting as per clause no. 15 of technical specification.
Inline blowers: Supply of TSK II series inline centrifugal duct fan, size 315 mm, air flow capacity approx. 1800 M3 per hour, Make-Kruger as per clause no. 16 of technical specification.
Cutting and shifting of 3 nos. old cooling coils of CC auditorium basement AHU, which were removed earlier, 2 nos. of old gate valves of 10 inch dia. and old piping, as mentioned in item no. 12 & as per clause no. 17 of technical specification.
BRITE INDUSTRIES
TOOT MNE TECH PRIVATE LIMITED
M/s Associated Engineers
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .