Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.8 L+₹10,104.78 (5.99%)Admitted-Finance 197 KRISHNA NAGAR JAMMU | JAMMU | JAMMU AND KASHMIR | 180001 | L2 | Admitted-Finance | ||
| 3 | L3₹1.8 L+₹14,501.97 (8.60%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹1.9 L+₹17,676.09 (10.5%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹1.9 L+₹23,267.21 (13.8%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹2.9 L
EMD Value
₹5,820
Closing Date
21 Sept 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, REW Jammu
Office of the Executive Engineer, REW Jammu
Constt.of Protection wall near Guru ashram Naiwala Pyt.Gurha Jagir Block Bhalwal Brahmana, under scheme (CDF) for the year 2026-27
2026_RDPR_323658_1
e-NIT No. 548 REWJ of 2026-27 dated 07-09-2026
Open Tender
Civil Works
Percentage
30 days
Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹5,820
13 Oct 2026
7 Sept 2026
22 Sept 2026
7 Sept 2026
21 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, includingdressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 28.32 | cum | 256.85 | ₹7,273.99 |
| 2 | P/Laying of cement conct. 1:5:10( 1 cement :5coarse sand :10 graded stone aggregates 40mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 1.81 | cum | 4,826.5 | ₹8,735.97 |
| 3 | P/Laying of cement conct. 1:3:6( 1 cement :3 coarse sand :6 graded stone aggregates 20mm) Of specified gradeincluding curing but excluding cost of centring and shuttring. all work up to plinth level. | 40.87 | cum | 5,733.6 | ₹2,34,332.23 |
| 4 | Centering and shuttering including strutting,propping etc and removal of form for foundations,footings,bases of column etc for mass concrete | 87.28 | sqm | 286.35 | ₹24,992.63 |
| 5 | Carriage of sand upto 6 kms by MT | 19.82 | cum | 216.4 | ₹4,289.05 |
| 6 | Carriage of Aggregates upto 6 kms by MT | 39.65 | cum | 216.4 | ₹8,580.26 |
| 7 | Providing and fixing Display board(4.0x3.0) including painting,writing all complete | 1 | no. | 3,000 | ₹3,000 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_1090080.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .