| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹1.4 CrRejected-AOC | ₹1.4 Cr | L2 | Rejected-AOC L2 bidder |
| Sl No | Description | Qty | Unit | Usharani L2 | Suguna Sakthi L1 |
|---|---|---|---|---|---|
| 1.00Providing Scaffolding charges for Vimanams and Gopurams with casurina posts coconut or palm trees wherever necessary for main, form work and providing with net lawn/PVC mesh coverings, providing ladder arrangements, country wood plank for working, inspection etc. complete, hire charges only for erection, maintenance and removing the same on completion of the work. etc complete complying with standard specification and as directed by departmental officers. (TNBP. Specification.No : Special) | |||||
| 1.01 | Vimanam Height upto 50'0" | 216 | 1 M2 (One Square Metre) | 485 ₹1.0 L | 480 ₹1.0 L |
| 1.02 | Vimanam Height upto 25'0" | 162 | 1 M2 (One Square Metre) | 380 ₹61,560 | 375 ₹60,750 |
| 2.00 | Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1.5 ( One of lime and one & half of sand ) with special grinding with gallnut jaggary etc complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime Mortor1:1.5 ( One of lime and one & half of sand ) and finishing with final ornamental plastering and nayam theervai including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. etc.complete complying with standard specifications and as directed by the departmental officers. (TNBP. Specification.No : Special) (Height upto 15'0") (The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.) | 1,108 | 1Sft (One Square feet) | 395 ₹4.4 L | 390 ₹4.3 L |
| 3.00 | Painting with multi colour ( Panchavaranam ) using good water base exterior emulsion paint over a priming coat with approved premeir etc., complete for the vimanam and gopuram for ornamental works including cost and conveyance of all materials labour charges including artist painter working in heights , lifting materials cost of brushes etc. which including allextra for foldingsetc complete complying with standard specification and as directed by the departmental officers.( The brand ,colour,shade and quality of paint should be got approved by the Executive Engineer before use on works ) (TNBP. Specification.No : special and similar to 66 & 66-A) | 1,108 | 1Sft (One Square feet) | 120 ₹1.3 L | 115 ₹1.3 L |
| 4.00 | Restoration by providing herbal water wash(Combination of Venthayam powder 20%, Siyakai Powder 10%, Arapu powder 5%, Boonthi kottai powder 50%, Arugampul powder 3%, Nannari ver powder 3%, Vettiver powder 3%, Korai kizhangu powder 3%, and sembaruthi leaf powder 3% total 100%) are used for removel of lime wash on stone and oil smudge) and approrimats methodology to restore the originalities of the existing granite structure inclusive of hire charges scaffolding arrangements conveyance charges for tools & plants and machinaries to the workship spot and cleaning the site after completion of work etc complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : Special) | 2,109 | 1Sft (One Square feet) | 5 ₹10,545 | 4 ₹8,436 |
| 5.00 | Pointing with Lime mortar 1:1.5 ( One Lime and one & half sand ) to restore the originalities of the existing granite stone structure including the charges of scaffolding arrangement if necessary with neat finishing including all tools and plants and labour etc all complete for cut stone masonry.etc complete complying with standard specification and as directed by the departmental officers.(The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)(TNBP. Specification.No : 60) | 196 | 1 M2 (One Square Metre) | 275 ₹53,900 | 275 ₹53,900 |
| 6.00 | Dismantling of weathering course clearing carefully away., from site etc complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 16&17) | 98 | 1 M2 (One Square Metre) | 46 ₹4,508 | 45 ₹4,410 |
| 7.00 | Supply of cut stone, cut stone pillar and cut stone beam of required size as directed etc.,complete complying with standard specification and as directed by the departmental officers | 13 | 1 M3 ( One Cubic Metre ) | 19,890 ₹2.6 L | 19,888 ₹2.6 L |
| 8.00 | Labour charges for removing the cutstone Pavukkal of required size,numbering and stocking carefully including as directed scaffolding.,etc complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : special) | 105 | 1 M2 (One Square Metre) | 1,735 ₹1.8 L | 1,730 ₹1.8 L |
Tender Value
₹1.4 Cr
EMD Value
₹79,000
Closing Date
31 Jan 2025, 12:30 pmClosed
Executive Officer
Arulmigu Vellanthangeeswarar Thirtukoil, C.Nandhal, Kalasapakkam Taluk of Tiruvannamalai District
Repairs and Renovation of Arulmigu Vellanthangeeswarar Thirtukoil, C.Nandhal, Kalasapakkam Taluk of Tiruvannamalai District
2025_HRCE_518090_1
23/2024-2025
Open Tender
Civil Works
C.Nandhal, Kalasapakkam Taluk
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹79,000
16 Feb 2026
10 Jan 2025
31 Jan 2025
10 Jan 2025
31 Jan 2025
10 Jan 2025
Amount
Providing Scaffolding charges for Vimanams and Gopurams with casurina posts coconut or palm trees wherever necessary for main, form work and providing with net lawn/PVC mesh coverings, providing ladder arrangements, country wood plank for working, inspection etc. complete, hire charges only for erection, maintenance and removing the same on completion of the work. etc complete complying with standard specification and as directed by departmental officers. (TNBP. Specification.No : Special)
Vimanam Height upto 50'0"
Vimanam Height upto 25'0"
Providing Vargapoochu over the corewalls of Vimanams / Gopurams, with Lime Mortor1:1.5 ( One of lime and one & half of sand ) with special grinding with gallnut jaggary etc complete including shaping the mukhapathram, mahanasi, Koodu all ornamentals works to proper shape by embedding broken bricks of shaped/chiseled bricks, rough-plastering with Lime Mortor1:1.5 ( One of lime and one & half of sand ) and finishing with final ornamental plastering and nayam theervai including cost and conveyance of all materials, labour therefore, lifting of materials, all working in heights, curing with water etc, complete including all extra for folding and including clearing from the vimanams/gopurams 100sft superficial area. etc.complete complying with standard specifications and as directed by the departmental officers. (TNBP. Specification.No : Special) (Height upto 15'0") (The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)
Painting with multi colour ( Panchavaranam ) using good water base exterior emulsion paint over a priming coat with approved premeir etc., complete for the vimanam and gopuram for ornamental works including cost and conveyance of all materials labour charges including artist painter working in heights , lifting materials cost of brushes etc. which including allextra for foldingsetc complete complying with standard specification and as directed by the departmental officers.( The brand ,colour,shade and quality of paint should be got approved by the Executive Engineer before use on works ) (TNBP. Specification.No : special and similar to 66 & 66-A)
Restoration by providing herbal water wash(Combination of Venthayam powder 20%, Siyakai Powder 10%, Arapu powder 5%, Boonthi kottai powder 50%, Arugampul powder 3%, Nannari ver powder 3%, Vettiver powder 3%, Korai kizhangu powder 3%, and sembaruthi leaf powder 3% total 100%) are used for removel of lime wash on stone and oil smudge) and approrimats methodology to restore the originalities of the existing granite structure inclusive of hire charges scaffolding arrangements conveyance charges for tools & plants and machinaries to the workship spot and cleaning the site after completion of work etc complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : Special)
Pointing with Lime mortar 1:1.5 ( One Lime and one & half sand ) to restore the originalities of the existing granite stone structure including the charges of scaffolding arrangement if necessary with neat finishing including all tools and plants and labour etc all complete for cut stone masonry.etc complete complying with standard specification and as directed by the departmental officers.(The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)(TNBP. Specification.No : 60)
Dismantling of weathering course clearing carefully away., from site etc complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 16&17)
Supply of cut stone, cut stone pillar and cut stone beam of required size as directed etc.,complete complying with standard specification and as directed by the departmental officers
Labour charges for removing the cutstone Pavukkal of required size,numbering and stocking carefully including as directed scaffolding.,etc complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : special)
Labour charges for removing the cutstone Uthiram of required size,numbering and stocking carefully including as directed scaffolding.,etc complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : special)
Labour charges for removing the cutstone Bothiyal of required size,numbering and stocling carefully including scaffolding.,etc complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : special)
Labour charges for removing the cutstonepillars of required size,numbering and stocking carefully as directed including scaffolding.hoisting aligning and fixing in position in lime mortar 1:1.5(one fo lime and one & half of m.sand),etc complete complying with standard specification and as directed by the departmental officers.(The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)(TNBP. Specification.No : special)
Labour charges for removing the cutstone wall of required size,numbering and stocking carefully including scaffolding.hoisting aligning and fixing in position in lime mortar 1:1.5(one fo lime and one & half of m.sand),etc complete complying with standard specification and as directed by the departmental officers.(The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)(TNBP. Specification.No : special)
Labour charges for dressing and fixing the cut stone of various stages lime mortar 1:1.5 ( one of lime and one and half of m.sand),including pointing the same mortar etc.,complete complying with standard specification and as directed by the departmental officers.(The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)
For viyalam
For Kabothagam
For Ulvari
For Pavukkal
For Uluthirakkal
For Bothiyal
For vasakkal
Supplying & fixing best quality well seasoned Teak wood temple type ornamental door in verious sizes and required height with 2'' minimum and 7'' maximum thick ornamental frames as per approved palns and design including all materials, labour charges for manufacturing and fixing in position including all furniture fittings etc complete complying with standard specifications and as directed by the departmental officials (TNBP. Specification.No : similar to 72&74 )
Painting two coats to new wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat with approved premier in all floors including the cost of primer etc., complete complying with standard specification and as directed by departmental officers. (The make, quality ,shade and colour of paint should be got approved by the Executive Engineer before use on works.)(TNBP. Specification.No : 66&66-A )
Earthwork excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting inclusive of shoring shuttering, baling out water wherever necessary, refilling the foundation with excavated earth and depositing the surplus earth within compound in places shown by the departmental officers with an initial lead of 10 metre and initial lift of 2 metre and clearing and leveling the site etc., complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : 23)
Supplying and filling in foundation, basement, etc with filling crushed stone sand ( M.Sand) in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. (TNBP. Specification.No : 24&25 )
Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard granite broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification .(TNBP. Specification.No : 28 )
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). (TNBP. Specification.No : 30)
For Foundation and Basement
For Super Structure
Brick Work in Cement Mortar 1:5 (one of Cement and Five of M.sand) using best quality of country bricks of size 8 3/4"x4 1/4"x 2 3/4" including neat finishing curing etc., complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 31-C)
Brick Work in lime special grinding Mortar 1:2 (one of lime and two of M.sand) using best quality of country bricks of size 8 3/4"x4 1/4"x 2 3/4" including neat finishing curing etc., complete complying with standard specification and as directed by the departmental officers.(The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)(TNBP. Specification.No : 31-C)
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid) (TNBP. Specification.No : similar to 72 & 86)
For Grade beam
For Column
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire).(TNBP. Specification.No : 86 & 86-A)
Plastering with Cement Mortar 1:5 (one of Cement and Five of Plastering sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 52&53)
Painting two coats of newly plastered wall surface withWater based emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt etc., and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality ,shade and colour of paint should be got approved by the Executive Engineer before use on works.) (TNBP. Specification.No : 66 & 66-A)
Supplying & Paving flooring with cut stone of size 600 mm X 600 mm and another sizes suitable for site conditions with machine cut edges and not less than 100mm thick and fully dressed as directed by the departmental officers,and set inspecial grinding Lime morter 1:1.5 ( One of lime and One and Half of M.sand ) and pointing with special grindingLime morter 1:1.5 ( One of lime and One and Half of M.sand ) including cost and conveyance of all materials etc., complete Complying with standard specifications. and directed by the departmental officers (The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)(TNBP. Specification.No : 4&35 and special )
Supplying and fixing mild steel grills for windows, ventilators, etc., as directed including the cost of necessary scrub and applying priming coat etc., complete complying with standard specification and as directed by the departmental officers.(TNBP. Specification.No : 86 & 86-A)
Painting two coat new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with of best approved first quality and colour of synthetic enamel paint over with one coat of priming coat with approved primer in all floors etc., complete complying with standard specification. (The make, quality ,shade and colour of paint should be got approved by the Executive Engineer before use on works.)(TNBP. Specification.No : 66&66-A )
Weathering course in brick jelly lime concrete using broken brick jelly of size 20mm uniform gauge in pure slaked lime (no crushed stone sand to be used) to the proportion of brick jelly to lime being 32:12.5 by volume and laid over the RCC roof slab in a single layer of required slope and finished by beating the concrete with wooden beaters of approved pattern, keeping the surface constantly wet by sprinkling lime jaggery water, etc., complete as per standard specification and as directed by the deparmental officers.(TNBP. Specification.No : 44 )
Finishing the top of roof with one course of machine pressed tiles of size 230mm x 230mm x 20mm of approved quality set in Lime Mortar 1:1.5 (One of Lime and One & half of M.sand)12mm thick mixed with water proofing compound conforming to ISS at 2% by weight of cement used and the joints pointed neatly to full depth of tiles with the same cement mortar mixed with red oxide and water proofing compound including curing etc., complete complying with standard specification and as directed by the departmental officers.(The lime used should be sourced from Pollachi which is highly iron fortified and suitable for structural and masonry works.)(TNBP. Specification.No : 44-H)
Sub Total
Usharani (BID ID -1240977)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid