| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.2 LAdmitted-Fee/PreQual/Technical/Finance MAIN ROAD LATEHAR | LATEHAR | JHARKHAND | 822111 | -35.78% | ₹24.2 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹27.5 L+₹3.3 L (13.7%)Admitted-Fee/PreQual/Technical/Finance | -27.00% | ₹27.5 L+₹3.3 L (13.7%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹27.6 L+₹3.5 L (14.3%)Admitted-Fee/PreQual/Technical/Finance VISHUVPUR LATEHAR | LATEHAR | LATEHAR | JHARKHAND | -26.60% | ₹27.6 L+₹3.5 L (14.3%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹32.9 L+₹8.7 L (36.1%)Admitted-Fee/PreQual/Technical/Finance | -12.59% | ₹32.9 L+₹8.7 L (36.1%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹37.7 L
EMD Value
₹75,500
Closing Date
15 Aug 2026, 5:00 pmClosed
EE RDSD LATEHAR
EE RDSD LATEHAR
Construction of PCC Road Aahar (kali Mandir) to Chairman road with Guard Wall at Ward no-13 Nagar Panchayat Area Block Latehar
2026_RDSPL_116862_2
EE/RDSD/LATEHAR/25/2026-27
Open Tender
Civil Works
Percentage
135 days
LATEHAR
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
₹75,500
Yes
17 Aug 2026
6 Aug 2026
17 Aug 2026
6 Aug 2026
15 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing Grass and Removal of Rubish Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area SOR NO. 2.02 RDD | 0.2 | Hac | 19,760.3 | ₹3,952.06 |
| 2 | Compacting Original ground supporting sub-grade Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction.
SOR NO. 3.20 case (i) RDD | - | CUM | 52.6 | - |
| 3 | Construction of Subgrade and Earthen Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2. SOR. ITEM NO. 3.18 RDD | - | CUM | 131.3 | - |
| 4 | Granular Sub-Base with Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. SOR. ITEM NO. 4.01 B(iii)RDD | 1 | CUM | 1,437.6 | ₹1,436.16 |
| 5 | Cement Concrete Pavement Prviding and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level 1:1.5:3 (1 cement :1.5 coarse sand (zone iii) : 3 graded stone aggregate 20 mm nominal size ) | - | CUM | 4,961.73 | - |
| 6 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. | - | CUM | 151.82 | - |
| 7 | Providing coarse clean sand in filling in in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials labour, royalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume) | - | CUM | 589.51 | - |
| 8 | Providing designation 75A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | - | SQM | 330.34 | - |
| 9 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 1 | CUM | 3,751.64 | ₹3,747.89 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for :- Foundations, footings, bases of columns, etc. for mass concrete | - | SQM | 194.5 | - |
stage.html
html • 0.02 MB
finance_157979.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
Sbd_2.pdf
Tender Documents • 0.91 MB
BOQ_157979.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .