Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.7 LAccepted-AOC ALIGARH | UTTAR PRADESH | 202001 | L1 | Accepted-AOC L1 | |
| 2 | L2₹19.9 L+₹21,406.80 (1.09%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹20.8 L+₹1.1 L (5.57%)Rejected-AOC A 51 SHALIMAR GARDEN EX 2 SAHIBABAD DISTRICT GHAZIABAD UTTAR PRADESH | SAHIBABAD | GHAZIABAD | UTTAR PRADESH | L3 | Rejected-AOC L3 | |
| 4 | L4₹21.0 L+₹1.2 L (6.31%)Rejected-AOC VILL 81 LAJPAT NAGAR DIST MATHURA | MATHURA | UTTAR PRADESH | 209402 | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | DEVENDRA KUMAR SHARMA L1 | ARTIST BRO L3 | THE SWAMIKA CO-OP L & C L2 | M/S TANVI CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of private land and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 1.00 km. lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank withen 30 m distance as directed by Engineer in charge & also including all cost of borrwed earth from pvt. land, material, labour & T&P etc. complete.
(As per I.D.S.O.R. Chapter - IV/2d) | 1,576 | M³ | 20 ₹31,520 Lowest | 60 ₹94,560 | 80 ₹1,26,080 | 106.56 ₹1,67,938.56 |
| 2.00 | Surface dewatering of foundation and launching apron i/c of all arrangement in KWH by diesel pump sets. including all cost material, labour & T&P etc. complete. | 8,590 | KWH | 5 ₹42,950 Lowest | 10 ₹85,900 | 30 ₹2,57,700 | 27 ₹2,31,930 |
| 3.00 | Earth work in foundation in dry soil including lift up to 1.50 M & lead up to 30 M back filling, waterring and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer-in-Charge. | 116 | M³ | 30 ₹3,480 Lowest | 60 ₹6,960 | 99.8 ₹11,576.8 | 43.2 ₹5,011.2 |
| 4.00 | Shuttering for C.C. blocks and concrete including cost of shuttering, material, labour and T&P required for proper completion of work etc. | 39 | M² | 200 ₹7,800 Lowest | 450 ₹17,550 | 500 ₹19,500 | 414 ₹16,146 |
| 5.00 | Laying C.C. 1:2:4 Mix (M-15) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 30 | M³ | 5,000 ₹1,50,000 | 5,000 ₹1,50,000 | 3,000 ₹90,000 Lowest | 4,116 ₹1,23,480 |
| 6.00 | Centering & shuttering for R.C.C. work including cost of centering & shuttering material, labour and T&P required for proper completion of work etc | 315 | M² | 300 ₹94,500 Lowest | 550 ₹1,73,250 | 400 ₹1,26,000 | 604.8 ₹1,90,512 |
| 7.00 | Laying R.C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | 15 | M³ | 6,000 ₹90,000 | 6,000 ₹90,000 | 4,400 ₹66,000 Lowest | 4,960.51 ₹74,407.65 |
| 8.00 | Reinforcement including cutting, bending & binding in position including all cost of labour, material and T&P etc. complete. | 9 | MT | 68,000 ₹6,12,000 | 70,000 ₹6,30,000 | 61,000 ₹5,49,000 | 55,776 ₹5,01,984 Lowest |
| 9.00 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | 125 | M³ | 7,000 ₹8,75,000 | 6,000 ₹7,50,000 | 5,000 ₹6,25,000 Lowest | 5,611 ₹7,01,375 |
| 10.00 | Finishing walls with acrylic shooth exterior paint of required shade of new work (Two or more coat applied @ 1.67 lts/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg./10sqm.) | 109 | M² | 60 ₹6,540 Lowest | 150 ₹16,350 | 250 ₹27,250 | 100 ₹10,900 |
Tender Value
Refer Docs
EMD Value
₹60,000
Closing Date
17 Feb 2026, 5:00 pmClosed
EE UDAC Mathura
EE UDAC Mathura
LOT01
2026_UPIDC_1115356_1
13/EE/2025-26
Open Tender
Civil Works
Piece-work
120 days
EE UDAC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹354
₹60,000
Yes
21 Jul 2026
12 Feb 2026
18 Feb 2026
12 Feb 2026
17 Feb 2026
12 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting or in embankment in ordinary soil, excavation to be in the form of private land and earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 1.00 km. lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank withen 30 m distance as directed by Engineer in charge & also including all cost of borrwed earth from pvt. land, material, labour & T&P etc. complete.
(As per I.D.S.O.R. Chapter - IV/2d) | 1,576 | M³ | - | - |
| 2 | Surface dewatering of foundation and launching apron i/c of all arrangement in KWH by diesel pump sets. including all cost material, labour & T&P etc. complete. | 8,590 | KWH | - | - |
| 3 | Earth work in foundation in dry soil including lift up to 1.50 M & lead up to 30 M back filling, waterring and ramming of excavated earth into the trenches and disposal of surplus earth as directed by the Engineer-in-Charge. | 116 | M³ | - | - |
| 4 | Shuttering for C.C. blocks and concrete including cost of shuttering, material, labour and T&P required for proper completion of work etc. | 39 | M² | - | - |
| 5 | Laying C.C. 1:2:4 Mix (M-15) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 30 | M³ | - | - |
| 6 | Centering & shuttering for R.C.C. work including cost of centering & shuttering material, labour and T&P required for proper completion of work etc | 315 | M² | - | - |
| 7 | Laying R.C.C. 1:1.5:3 Mix (M-20) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | 15 | M³ | - | - |
| 8 | Reinforcement including cutting, bending & binding in position including all cost of labour, material and T&P etc. complete. | 9 | MT | - | - |
| 9 | Laying R.C.C. 1:1:2 Mix (M-25) with Cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. | 125 | M³ | - | - |
| 10 | Finishing walls with acrylic shooth exterior paint of required shade of new work (Two or more coat applied @ 1.67 lts/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg./10sqm.) | 109 | M² | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.44 MB
BOQ_2069394.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .