Tender Value
₹1.4 L
EMD Value
₹2,880
Closing Date
30 Sept 2026, 4:00 pmDue tomorrow
EXECUTIVE ENGINEER REW BANDIPORA
EXECUTIVE ENGINEER REW BANDIPORA
CONSTRUCTION OF WATER HARVESTING TANK IN LAND OF SUBHAN LONE AT WNPORA AT NRM WORK PROJECT BAGTORE 2.0
2026_RDPR_325978_2
NIT97
Open Tender
Civil Works
Percentage
EXECUTIVE ENGINEER REW BANDIPORA
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Rural Development and Panchayati Raj
₹2,880
25 Sept 2026
25 Sept 2026
1 Oct 2026
25 Sept 2026
30 Sept 2026
25 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | GENERAL SITE CLEARANCE BY THE WAY OF ENGAGEMENT OF LABOURS FOR CUTTING OF SHRUBS REMOVAL OF WEEDS CUTTING OF TREES ETC. | 4 | NO | 503 | ₹2,012 |
| 2 | EARTH WORK IN EXCAVATIONS IN TRENCHES / DRAINS NOT EXCEEDING 1.5 MTR IN WIDTH AS WELL AS 10 SQM ON PLAIN INCLD LIFT UPTO 1.5 MTR IN ALL KINDS OF SOILS:
I) 40 PERCENTALL KINDS OF SOILS | 11.41 | Cum | 940 | ₹10,727.28 |
| 3 | II) 40 PERCENT ORDINARY SOIL | 17.12 | CUM | 592.9 | ₹10,150.45 |
| 4 | PROVIDING AND LAYING OF STONE SOLING INCLUDING LAYING PITCHING TIGHTELY COMPACTING | 1.73 | Cum | 1,204 | ₹2,085.33 |
| 5 | PROVIDING AND LAYING OF SHUTTERING / CENTERING INCLIDE PROPPING STRUTTING ETC AND REMOVAL OF FORMWORK | 20.65 | Sqm | 286.35 | ₹5,913.13 |
| 6 | PROVIDING AND LAYING OF CONCRETE 1:3:6 OF SPECIFIED GRADE OF M10 EXCLD COST OF CENTRING AND SHUTTERING BY USING 40 MM N/S AGG:
1) :-20 PERCENT PLUM | 1.92 | CUM | 1,200 | ₹2,304 |
| 7 | 2) REMEAINIG QUANTITY | 7.69 | CUM | 5,673 | ₹43,625.37 |
| 8 | STRUCTURAL STEEL WORK IN BUILT UP SECTIONS TRUSSES AND FRAMED WORK INCL CUTTING HOISTING FIXING IN POSITION AND APPLYING A PRIMING COAT OF APPROVED STEEL PRIMET COMPLETE IN ALL RESPECTS | 251.6 | KG | 120.8 | ₹30,393.28 |
| 9 | PROVIDING AND FIXING OF GI CHAIN LINK FENCING OF REQUIRED WIDTH IN MESH SIZE 50 X 50X 4 DIA INCL STRNGTHING WITH 2MM DIA WIRE NUTS BOLTS AND WASHERS AS PER DIRECTION OF ENGINEER INCHARGE | 17.86 | SQM | 809.9 | ₹14,464.81 |
| 10 | CARRIAGE OF MATERIAL BY MT WITH 30 KM LEAD ONCL COST ( TO BE GIVEN ACTUAL) :-
1)SAND AGGREGATE | 13.7 | CUM | 538 | ₹7,370.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_1102066.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .