Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical 1 292 SOUTHSTREET THIYAGAVAN SERI RAMANATHAPURAM 623530 | RAMANATHAPURAM | TAMIL NADU | 623530 | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical 97 1 YADHAVA STREET VELIPATTINAM RAMANATHAPURAM 523504 | 523504 | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹69,000
Closing Date
23 Feb 2026, 3:00 pmClosed
Additional Collector, Development, Ramanathapuram
Additional Collector, Development, DRDARamanathapuram
Strengthening the road from NH49 to Pananthoppu(Km 0/0-1/220) 19/NABARD RIDF/2026-27
2026_RDTN_658601_10
R5/709/2026
Open Tender
Civil Works
Item Rate
RDDA
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹69,000
RDDA, Ramanathapuram
30 Jun 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
18 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Strengthening of the road from NH 49 to Pananthoppu in Pamban Panchayat in Mandapam Block .(KM 0/0 - 1/220)(R-280) | - | - | - | - |
| 2 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | - | - | - | - |
| 3 | Km 0/0-1/220 | - | Sqm | - | - |
| 4 | Picking Charges for 5 cm to 10 cm old metalled and B.T. surface and sectioning including cost and conveyance and all labour charges etc. | - | - | - | - |
| 5 | Km 0/0-1/220 | - | Sqm | - | - |
| 6 | Earth work excavation and deposition of bank in all classes of soils such as hard stiff clay, hard black cotton soil, hard red earth, hard murrum, etc., as per SS 20A including all labour charges etc., for widening side Berms | - | - | - | - |
| 7 | Km 0/0-1/220 | 1 | Cum | - | - |
| 8 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | - | - | - | - |
| 9 | Km 0/0- 1/0 | - | Cum | - | - |
| 10 | Km 1/0-1/220 | 1 | Cum | - | - |
stage.html
html • 0.03 MB
cancelled_1.pdf
pdf • 2.42 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.23 MB
BOQ_790952.xls
BOQ • 0.33 MB
technicalbid19.pdf
Tender Documents • 1.18 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .