Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹12.0 LAccepted-AOC 11TH FLOOR ECO CENTRE BUSINESS TOWER P NO 4 EM BLOCK SECTOR V KOLKATA 91 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | 1 | Accepted-AOC L-1 | |
| 2 | 2₹13.1 L+₹1.0 L (8.62%)Rejected-Finance | 2 | Rejected-Finance L2 | |
| 3 | 3₹17.8 L+₹5.8 L (48.2%)Rejected-Finance 10 GOLDEN SILVER APPARTMENT ELLORA PARK ROAD SUBHANPURA VADODARA GUJARAT 390011 UDYAM GJ 24 0011140 | VADODARA | GUJARAT | 390011 | 3 | Rejected-Finance L3 | |
| 4 | 4₹32.2 L+₹20.2 L (167.8%)Rejected-Finance 107 2 AMPA MANOR IST FLOOR NELSON MANICKAM ROAD AMINJIKARAI CHENNAI 0 600 029 NO 107 2 AMPA MANOR 1ST FLOOR NELSON MANICKAM ROAD AMINIJIKARAI AMINJIKARAI | 4 | Rejected-Finance L4 | |
| 5 | 5₹40.1 L+₹28.1 L (233.2%)Rejected-Finance 20 21 ETA HOUSE RAZAK GARDEN MAIN ROAD RAZAK GARDEN MAIN ROAD CHENNAI TAMIL NADU 600106 | CHENNAI | TAMIL NADU | 600106 | 5 | Rejected-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹16,660
Closing Date
19 May 2022, 3:00 pmClosed
DGM (M and C)
SRPL Chennai
SRPL22C004
2022_SRCHN_150408_1
SRPL22C004
Open Tender
Electrical Works
Works
365 days
SRPL MANALI
Please refer Tender documents.
6 documents required · 6 mandatory
₹16,660
Yes
21 Jun 2022
29 Apr 2022
20 May 2022
29 Apr 2022
19 May 2022
5 May 2022
Amount
Service of Package AC Systems
Pressure Testing, Leak arresting of 5.5TR Unit- In case of any leakage in the circuit, Nitrogen pressure to be injected in the circu it for checking the leakage in the circuit. After detecting the leakage location, brazing of copper pipes to be carried out such tha t the leakage is arrested. Brazing to be carried out with Oxygen and Acetylene cylinder brazing set. No LPG Brazing set is allowed. After leak is arrested, Nitrogen pressure to be injected in the circuit at 250-300 psi and observe for 12 hours for confirming that the leakage was arrested. Vaccumising of the circuit to be carried out for 2 hours and R-22 gas to be charged in the circuit. The pr essure of the charged circuit to be maintained at 60 psi and to be shown to Engineer-In-Charge. Line Item includes fixing of supplie d Outdoor Unit assembly, Indoor coil, Copper pipe, Drier, Expansion Valve, Pressure Gauge, Compound Gauge and Compressor. Supply of R-22 gas, Outdoor Unit assembly, Indoor coil, Copper pipe, Drier, Expansion valve and Compressor will be paid seperately as per Line Items in the SOR.
Servicing of 11 TR ACs- Carrying out periodic preventive maintenance of the air conditioners as per the direction of the Engineer-In -Charge /Site Engineer including washing with water / detergent, filter cleaning, coil cleaning, checking of electrical wiring, curr ent, gas pressure, replacement of components as required etc. so as to maintain the ACs in good working condition. During maintenanc e, all parts of the AC has to be monitored regularly and in case of non–functioning of any parts, the same has to be informed to Eng ineer-In-Charge. The Periodic preventive maintenance shall be carried out every Month. The maintenance report to be submitted to the Engineer-In-Charge, indicating the functioning of all parts. In case of Breakdown of Package AC unit within a month, the breakdown has to be attended within 24 hours and no extra cost will be charged.The supplied Contactor, OLR,PCB, Belt, Blower shaft, Blower Be aring and HPLP Trip switch of Package AC Units has to be fixed during breakdown. The supply of Contactor, OLR,PCB, Belt, Blower shaf t, Blower Bearing and HPLP Trip switch will be paid seperately as per Line Items in SOR
Pressure Testing, Leak arresting of 8.5TR Unit- In case of any leakage in the circuit, Nitrogen pressure to be injected in the circu it for checking the leakage in the circuit. After detecting the leakage location, brazing of copper pipes to be carried out such tha t the leakage is arrested. Brazing to be carried out with Oxygen and Acetylene cylinder brazing set. No LPG Brazing set is allowed. After leak is arrested, Nitrogen pressure to be injected in the circuit at 250-300 psi and observe for 12 hours for confirming that the leakage was arrested. Vaccumising of the circuit to be carried out for 2 hours and R-22 gas to be charged in the circuit. The pr essure of the charged circuit to be maintained at 60 psi and to be shown to Engineer-In-Charge. Line Item includes fixing of supplie d Outdoor Unit assembly, Indoor coil, Copper pipe, Drier, Expansion Valve, Pressure Gauge, Compound Gauge and Compressor. Supply of R-22 gas, Outdoor Unit assembly, Indoor coil, Copper pipe, Drier, Expansion valve and Compressor will be paid seperately as per Line Items in the SOR.
Servicing of 17 TR ACs- Carrying out periodic preventive maintenance of the air conditioners as per the direction of the Engineer-In -Charge /Site Engineer including washing with water / detergent, filter cleaning, coil cleaning, checking of electrical wiring, curr ent, gas pressure, replacement of components as required etc. so as to maintain the ACs in good working condition. During maintenanc e, all parts of the AC has to be monitored regularly and in case of non–functioning of any parts, the same has to be informed to Eng ineer-In-Charge. The Periodic preventive maintenance shall be carried out every Month. The maintenance report to be submitted to the Engineer-In-Charge, indicating the functioning of all parts. In case of Breakdown of Package AC unit within a month, the breakdown has to be attended within 24 hours and no extra cost will be charged.The supplied Contactor, OLR,PCB, Belt, Blower shaft, Blower Be aring and HPLP Trip switch of Package AC Units has to be fixed during breakdown. The supply of Contactor, OLR,PCB, Belt, Blower shaf t, Blower Bearing and HPLP Trip switch will be paid seperately as per Line Items in SOR
Removal of old fan motor in the Indoor Unit and fixing new motor
Removal, Rewinding of Blower Motor and fixing of Blower Motor
Supply of PAC Spares
Supply of R-22 Gas
Supply of Fan Motor for Outdoor units for 5.5TR
Supply of Indoor coil (5.5 TR x 2)
Supply of Outdoor unit assembly (5.5 TR )
Supply of Copper Pipe 7/8 Inch
Supply of Drier (5.5 TR)
Supply of Expansion Valve (5.5 TR)
Supply of Compressor (5.5 TR)
Supply of Belt
Supply of Blower bearing (5.5 TR)
Supply blower Shaft (5.5 TR)
Supply of Contactor
Supply of OLR
Supply of HPLP Trip switch
Supply of Pressure gauge in the suction and discharge lines of Package AC circuit (11.0 TR)
Supply of Compound gauge in the suction and discharge lines of Package AC circuit (11.0 TR)
Supply of PCB (5.5 TR)
Supply of Copper Pipe 1/2 Inch
Supply of Copper Pipe 5/8 Inch
Supply of Drier (8.5 TR)
Supply of Expansion Valve (8.5 TR)
Supply of Blower bearing ( 8.5TR)
Supply of PCB for 8.5 TR
Supply of Fan Motor /Outdoor 8.5TR units
Supply of Indoor coil (17 TR)
Supply of Outdoor unit assembly (8.5 TR)
Supply of Compressor (8.5 TR)
Supply of blower Shaft ( 8.5TR)
Supply of Spares for Split AC
Supply and Fitting of Thermostat of 1.5T Split AC
Supply and Fitting of Thermostat of 2.0T Split/Cassette/Tower AC
Supply and Fitting of Starting relay for 1.5T Split AC
Supply and Fitting of Starting relay for 2.0T Split/Cassette/Tower AC
Supply and Fitting of Condenser fan blade for 1.5T Split AC
Supply and Fitting of Condenser fan blade for 2.0T Split/Cassette/Tower AC
Supply and Fitting of Fan Blower for 1.5T Split AC
Supply and Fitting of Fan Blower for 2.0T Split/Cassette/Tower AC
Supply and Fitting of Fan Motor for 1.5T Split AC
Supply and Fitting of Fan Motor for 2.0T Split/Cassette/Tower AC
Copper Pipe (Extra) with insulation for 1.5T Split AC
Copper Pipe (Extra) with insulation for 2.0T Split/Cassette/Tower AC
Wiring Kit 1.5T Split AC
Wiring Kit for 2.0T Split/Cassette/Tower AC
50+6 mfd Capacitor
50+2 mfd Capacitor
45 mfd Capacitor
100/120 Capacitor for 1.5T Split AC
100/120 Capacitor for 2.0T Split/Cassette/Tower AC
2.5/4/5 mfd fan Capacitor for 1.5T Window ,1.5T Split,2.0T Split/Cassette/Tower AC
Supply and fixing of 32A MCB for 1.5T Window ,1.5T Split,2.0T Split/Cassette/Tower AC
Supply and fixing of Filter for 1.5T Split AC
Supply and fixing of Filter for 2.0T Split/Cassette/Tower AC
Replacement of Defective Compressor by new ISI mark Compressor (reciprocating/rotary ) of reputed company with one year guarantee in cluding commisioning and testing for desired performance for 1.5T Split AC
Replacement of Defective Compressor by new ISI mark Compressor (reciprocating/rotary ) of reputed company with one year guarantee in cluding commisioning and testing for desired performance for 2.0T Split/Cassette/Tower AC
Supply and installation of new PCB for Voltas/Blue Star/PANASONIC/VESTAR O-general Make Acs (including indoor and outdoor units for 1.5T Window,1.5 T Split , 2.0T Split/Cassette/Tower AC
Service of Split AC
Complete service of A/C including washin for 1.5T Split ac
Complete service of A/C including washin for 2.0T Split / Cassette /Tower
Topping up of refrigerant gas R-22 for 1.5T Split
Topping up of refrigerant gas R-22 for 2.0T Split / Cassette /Tower
Complete gas charging refrigert gas R-22
Rewinding and servicing of fan motor inc for 1.5T Split
Rewinding and servicing of fan motor inc for 2.0T Split / Cassette /Tower
Repair of PCB for Voltas / Blue Star / O
Fitting of Thermostat for 1.5T Split
Fitting of Thermostat for 2.0T Split / Cassette /Tower
Fitting of Starting relay for 1.5T/2T A
Fitting of Condenser fan blade for 1.5T Split
Fitting of Condenser fan blade for 2.0T Split / Cassette /Tower
Fitting of Fan blower for 1.5T Split
Fitting of Fan blower for 2.0T Split / Cassette /Tower
Fitting of Fan motor for 1.5T Split
Fitting of Fan motor for 2.0T Split / Cassette /Tower
Fitting of Copper pipe (Extra) with ins
Fitting of Wiring kit for 1.5T Split
Fitting of Wiring kit for 2.0T Split / Cassette /Tower
Fitting of 50+6 mfd capacitor
Fitting of 50+2 mfd capacitor
Fitting of 45mfd capacitor
Fitting of 100/120 capacitor for 1.5T Split
Fitting of 100/120 capacitor for 2.0T Split / Cassette /Tower
Fitting of 2.5/4/5 mfd fan capacitor
Fitting of MCB(32A)
Fitting of Filter for 1.5T Split
Fitting of Filter for 2.0T Split / Cassette /Tower
Service: Replacement of defective compressure of 1.5T Split
Service: Replacement of defective compressure of 2.0T Split / Cassette /Tower
Installation of new PCB
J L ENGINEERING SERVICES
Breeze Cool Service
TOOT MNE TECH PRIVATE LIMITED
ETA ENGINEERING PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .